
Renovation guides for kitchens and bathrooms
174 plain-spoken guides on costs, permits, materials, condo rules and contractors in Toronto and the GTA, written by the team that builds them.
Start here
The guides most people need first

CostsKitchen and bathroom renovation costs in TorontoWhat kitchens, bathrooms, ensuites, powder rooms, cabinets, quartz and walk-in showers cost in Toronto in 2026, with sourced GTA ranges and the HST to add.

PlanningHow to plan a kitchen or bathroom renovationPlan a Toronto kitchen or bathroom renovation step by step: scope, budget, design, selections, permits, lead times, scheduling and living through the work.

HiringHow to choose a renovation contractor in TorontoHow to choose a contractor for renovations in Toronto: the licences to verify, coverage to check, quotes to compare and contract terms to insist on, in 7 steps.

CondosCondo renovation rules in OntarioOntario condo renovation rules explained: your unit vs common elements, section 98 agreements, declarations, by-laws, rules, insurance and who pays for damage.

PlanningDo you need a permit for a kitchen renovation in TorontoToronto kitchen permit rules: when walls, new openings, plumbing, gas and wiring need a City permit, an ESA filing or a licensed gas fitter, and what doesn't.

ComparisonsQuartz vs granite countertopsQuartz vs granite countertops compared on sealing, hot pans, sunlight, slab variation and fabrication dust, with a plain verdict for GTA kitchens.
Kitchen design and layouts
- Open concept kitchen renovation
- Removing a load-bearing wall for an open kitchen
- Kitchen island design: sizes, clearances and seating
- Waterfall kitchen islands
- Small kitchen renovation ideas
- Galley kitchen renovation
- Kitchen layout options: L-shaped, U-shaped, galley and island
- The kitchen work triangle and work zones
- Kitchen renovation in a semi-detached Toronto house
- Kitchen renovation in a Victorian home
- Luxury kitchen renovation in Toronto
- Modern kitchen design
- Transitional kitchen design
- Kitchen lighting design: pot lights, pendants and under-cabinet
- Kitchen pantry design
- Kitchen storage ideas for a renovation
- Kitchen peninsula design
- Range hood venting for a kitchen renovation
- Coffee station and beverage centre ideas
- Pot filler faucets: are they worth it
- Family kitchen renovation
- Chef's kitchen design for serious home cooks
- Accessible kitchen design for aging in place
- Kitchen renovation with vaulted or raised ceilings
- Panel-ready appliances and integrated kitchens
Kitchen cabinets, counters and finishes
- Custom kitchen cabinets in Toronto
- Kitchen cabinet door styles: shaker, slab and inset
- Kitchen cabinet box materials: plywood, MDF and particleboard
- Painted kitchen cabinets
- Kitchen cabinet hardware and soft-close hinges
- Quartz countertops for kitchens
- Quartzite countertops
- Porcelain slab countertops
- Marble countertops in a working kitchen
- Countertop edge profiles
- Full-height slab backsplash
- Kitchen backsplash tile ideas
- Kitchen flooring options for a renovation
- Engineered hardwood in the kitchen
- Kitchen sink types: undermount, farmhouse and integrated
- Kitchen faucet buying guide
- Kitchen appliance planning for a renovation
- Induction cooktops in a kitchen renovation
- Two-tone kitchen cabinets
- White oak and walnut kitchen cabinets
- Kitchen drawer organizers and cabinet inserts
- Floating shelves in the kitchen
- Kitchen countertop thickness and overhangs
Bathroom design and layouts
- Ensuite bathroom renovation
- Luxury bathroom renovations in Toronto
- Powder room renovation
- Family bathroom renovation
- Small bathroom renovation ideas
- Tub to shower conversion
- Curbless shower design
- Walk-in shower ideas
- Steam shower installation
- Freestanding tub bathroom design
- Double vanity bathroom layouts
- Bathroom layout options for common room sizes
- Accessible bathroom renovation
- Kids' bathroom renovation
- Basement bathroom renovation
- Bathroom lighting design
- Bathroom storage ideas
- Shower niche design
- Shower bench design
- Bathroom wallpaper: where it works
- Spa bathroom design at home
- Modern bathroom design
- Bathroom renovation in an older Toronto home
- Adding an ensuite to a bedroom
- Adding a powder room on the main floor
Bathroom tile, fixtures and finishes
- Bathroom tile ideas
- Large-format porcelain tile in bathrooms
- Shower waterproofing systems
- Heated bathroom floors
- Bathroom exhaust fans and ventilation
- Bathroom vanity buying guide
- Floating vanities
- Wall-hung toilets with in-wall carriers
- Smart toilets and bidet seats
- Thermostatic and pressure-balanced shower valves
- Frameless glass shower doors
- Linear shower drains
- Grout types: cement, epoxy and urethane
- Marble bathrooms: what to know before you choose marble
- Bathroom faucet finishes: brushed gold, matte black and chrome
- Rain shower heads and hand showers
- How to keep a glass shower clean
- Bathroom flooring options
- Bathroom countertop materials
- Bathroom sink types: undermount, vessel and integrated
- Backlit bathroom mirrors
- Mosaic tile in bathrooms
- Wood-look tile in bathrooms
Condo kitchens and bathrooms
- Condo bathroom renovation in Toronto
- Condo kitchen renovation in Toronto
- Condo renovation rules in Ontario
- Getting condo board approval for a renovation
- How long does a condo renovation take
- Condo renovation cost in Toronto
- Condo bathroom renovation cost
- Condo tub to shower conversion
- Condo flooring and acoustic underlay rules
- Condo plumbing: risers, shut-offs and leaks
- Condo lighting with concrete ceilings
- Small condo kitchen ideas
- Renovating a condo while living in it
- Condo renovation insurance and liability
- Renovating a kitchen or bathroom in an older Toronto condo
- Condo elevator bookings, working hours and noise rules
Renovation costs
- Kitchen and bathroom renovation costs in Toronto
- Kitchen renovation cost in Toronto
- Bathroom renovation cost in Toronto
- Ensuite renovation cost
- Powder room renovation cost
- Custom kitchen cabinet cost
- Quartz countertop cost
- Walk-in shower cost
- Small bathroom renovation cost
- Kitchen renovation budget breakdown
- How to set a renovation budget and contingency
- HST on renovations in Ontario
- Renovation financing options in Canada
- High-end kitchen renovation cost in Toronto
- Kitchen island cost
- Heated bathroom floor cost
Planning, permits and process
- How to plan a kitchen or bathroom renovation
- Do you need a permit for a kitchen renovation in Toronto
- Do you need a permit for a bathroom renovation in Toronto
- How long does a kitchen renovation take
- How long does a bathroom renovation take
- Kitchen renovation checklist
- Bathroom renovation checklist
- Living without a kitchen during a renovation
- Best time of year to renovate in Toronto
- What happens during a kitchen renovation, week by week
- What happens during a bathroom renovation, week by week
- The renovation design process, from measurements to drawings
- Choosing renovation finishes without delays
- Electrical upgrades in a kitchen renovation
- Plumbing upgrades during a bathroom renovation
- Asbestos and lead in older homes before you renovate
Hiring a renovation contractor
- How to choose a renovation contractor in Toronto
- Questions to ask a renovation contractor
- How to compare renovation quotes
- Renovation contracts in Ontario: what to include
- Renovation deposits and payment schedules
- Holdbacks on renovation projects in Ontario
- Contractor insurance and WSIB coverage
- Renovation warranties in Ontario
- Design-build renovation explained
- Renovation contractor red flags
- How to read contractor reviews
- Working with a kitchen designer and a contractor
Comparisons
Comparisons
Side by side, before you choose

ComparisonsQuartz vs granite countertopsQuartz vs granite countertops compared on sealing, hot pans, sunlight, slab variation and fabrication dust, with a plain verdict for GTA kitchens.

ComparisonsQuartz vs quartziteQuartz vs quartzite: one is engineered, one is natural stone. Learn the glass and lemon tests, sealing needs, and why 'soft quartzite' is usually marble.

ComparisonsPorcelain slab vs quartz countertopsPorcelain slab vs quartz countertops in real kitchens: hot pots, mitred edges, 12 mm vs 20 mm slabs, sunlight and chipping, with a clear way to decide.

ComparisonsCabinet refacing vs replacingCabinet refacing vs replacing: what refacing keeps and changes, Canadian price ranges, how long each takes, and the box problems that rule refacing out.

ComparisonsTub vs walk-in showerTub vs walk-in shower: compare footprint, water per use, bathing small children, aging in place and waterproofing before you choose for each bathroom.

ComparisonsCustom vs semi-custom vs stock cabinetsCustom vs semi-custom vs stock cabinets: sizing, finishes, fit in older homes, quality certification and delivery, plus which tier suits which kitchen.

ComparisonsGas vs induction cooktopsGas vs induction cooktops in Ontario: energy efficiency, indoor air, TSSA gas work, ESA electrical permits and 40 to 50 amp circuits, and who each one suits.

ComparisonsKitchen island vs peninsulaKitchen island vs peninsula: how much room each needs, traffic flow, seating, plumbing and corner storage, and when a peninsula beats an island outright.

ComparisonsFrameless vs framed shower doorsFrameless vs framed shower doors: glass thickness, wall support, how much water escapes, semi-frameless options and cleaning, explained for GTA bathrooms.

ComparisonsDesign-build vs general contractorDesign-build vs general contractor for a kitchen or bathroom: who designs, who prices, who answers for problems, and how each model works in Ontario.

Tell us about your home
Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.