Renovations

Guides

Alcove tub with a stone-look slab surround and glass screen beside a tall white linen cabinet

Shower costs

Walk-in shower cost

A tiled walk-in shower in Toronto typically costs $8,000 to $15,000 installed in 2026, according to HomeStars, with custom glass or a curbless entry pushing it higher. RenoQuotes' national 2026 guide puts a standard walk-in at $5,000 to $9,000 and high-end builds above $12,000, and Toronto labour runs above national rates. The waterproofing system, the drain, the glass and how far the plumbing moves decide your final number.

By the Purple Kitchen & Bath team · Updated · 3 min read · Photo: a Purple Properties project

What a walk-in shower buys at three budgets

RenoQuotes' 2026 bands show what changes as the budget rises. They are national figures; in Toronto, expect each band to sit higher, towards HomeStars' $8,000 to $15,000 for a shower installation.

Walk-in shower components by budget, Canada 2026, before tax. Source: RenoQuotes, How Much Does a Walk-In Shower Renovation Cost in Canada? (updated September 2026).
ComponentBudget, $4,500 to $6,000Mid-range, $6,500 to $9,500Luxury, $11,000+
Shower baseLow-profile prefabricated base or tile-ready panTile-ready base with built-in slopeCustom mortar bed
TileStandard tilePorcelain or textured tileNatural stone or large-format slabs
DrainStandard centre drainStainless steel linear drainConcealed or custom drain
FixturesBasic shower setShower column or current finishThermostatic system, rain head or body jets
GlassStandard fixed panelFramed or semi-frameless doorCustom frameless glass

The cost stack: each layer of a tiled shower

Breaking a shower down in the order it is built shows where the money goes. Builders Ontario's October 2026 figures are Simcoe County and Central Ontario prices, so GTA quotes usually sit above them.

  • Builders Ontario's mid-grade 36 x 60 in. shower, from tile-ready walls to grout, comes to about $3,800, excluding glass, plumbing, demolition and drywall.
  • With premium 24 x 48 in. tile, a bench and a second niche, the same shower reaches about $5,070.
  • Add the excluded items and GTA labour, and the total moves into the HomeStars Toronto range.
Tiled shower line items, before HST. Source: Builders Ontario, Custom Tiled Shower Cost in Ontario (October 2026); drain product prices from RenoQuotes (2026).
Layer, in build orderTypical cost
Demolition of the old tub or shower$500 to $1,200
Waterproofed pan, curb and bonded drain, 36 x 60 in.About $900; $1,200 for larger or odd shapes
Wall waterproofing, foam board or sheet membraneAbout $6 per sq ft
Valve, trim, drain body and head, including any relocation$800 to $2,500
Wall tile setting, labourAbout $15 per sq ft; $18 for large format
Recessed nicheAbout $250 each
Tiled benchAbout $450
Linear drain, product only$500 to $1,000, against $100 to $200 for a centre drain
Frameless 3/8 in. door and panel$1,500 to $3,000

Curbed or curbless: the floor decides the price

A curbless shower costs more because the floor under it has to drop so water runs to the drain instead of across the bathroom. Builders Ontario prices the curbless upgrade, meaning the recess, the slope and a linear drain, at about $1,200 over a curbed pan where the floor can be recessed. In a wood-frame house that can mean reworking the subfloor between joists; on a concrete condo slab a recess may not be possible at all. The curbless shower design guide explains the options.

Whichever you choose, RenoQuotes calls waterproofing the most important part of the project: tile and grout alone do not keep water out of a wood-framed floor, and a full membrane system adds $600 to $1,200 or more with accessories and installation. The shower waterproofing systems guide compares them.

The finishes you will see every day

Once the hidden layers are right, four visible choices set most of the remaining cost.

  • Glass. A single fixed panel costs least; a frameless 3/8 in. door and panel runs $1,500 to $3,000 and is measured only after the tile is grouted. Compare styles in frameless vs framed shower doors.
  • Drain. A linear drain lets the floor slope one way, which suits large-format floor tile, at a product cost of $500 to $1,000 against $100 to $200 for a centre drain.
  • Valve. Pressure-balanced and thermostatic valves differ in price and in how precisely they hold temperature; see thermostatic and pressure-balanced shower valves.
  • Bench and niche. Built-in seating and storage add about $450 and $250 each. The penthouse bathrooms in downtown Toronto include a glass walk-in shower with a bench and black fixtures beside floor-to-ceiling windows.

When the walk-in replaces a bathtub

Swapping an alcove tub for a walk-in shower is a bigger job than rebuilding an existing shower, because the drain often moves and the floor needs a new waterproofed pan. RenoQuotes puts bathtub-to-shower replacements in Canada at $5,000 to $12,000 in 2026, against $5,000 to $8,500 for converting an existing standard shower into a walk-in. The tub to shower conversion cost guide and tub vs walk-in shower cover that decision in full.

Questions

How long does a tiled walk-in shower take to build?

Builders Ontario estimates five to eight working days over about two weeks for the tiling trades, including a 24-hour flood test of the pan and a 72-hour cure before the glass is measured. Glass is then made to those measurements, so allow extra time before the shower is ready to use.

Is a prefabricated shower base cheaper than a tiled floor?

Usually. RenoQuotes' budget band uses a low-profile prefabricated base or a tile-ready pan, while luxury showers use a custom mortar bed shaped on site. A prefabricated base limits the shower to stock sizes but reduces labour and the risk of slope errors.

Does a walk-in shower need a glass door at all?

Not always. A large enough shower can use a single fixed panel or no glass, which saves part of the $1,500 to $3,000 a frameless door and panel costs, as long as the layout keeps spray off the bathroom floor. See doorless shower design.

Sources and further reading

  1. HomeStars: Bathroom Renovation Costs in Toronto
  2. RenoQuotes: How Much Does a Walk-In Shower Renovation Cost in Canada?
  3. Builders Ontario: Custom Tiled Shower Cost in Ontario (2026)
  4. RenoQuotes: Replacing a Bathtub with a Shower in Canada

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.