
Condo law
Condo renovation rules in Ontario
Condo renovation rules in Ontario come from two places: the Condominium Act, 1998 and your corporation's own declaration, by-laws and rules. Work inside your unit generally needs the board's approval and must follow the building's rules on hours, contractors and materials. Changes to common elements, such as the structure, shared piping or an exclusive-use balcony, need a board resolution and a section 98 agreement that takes effect only once it is registered on your unit's title. City building permits are a separate, additional requirement.
Four documents decide what you can renovate
Read them in this order. Where the declaration or the rules conflict with the Act, the Act prevails (sections 7(5) and 58(4)).
- Rules must be reasonable and consistent with the Act, the declaration and the by-laws, and must either promote safety, security and welfare or prevent unreasonable interference with others' use of the property (section 58).
- Owners can amend or repeal a rule at a meeting called for that purpose (section 58(5)).
- The Condominium Authority of Ontario advises owners to review these documents and contact the board before starting any renovation.
| Document | Where it comes from | What it controls in a renovation |
|---|---|---|
| Condominium Act, 1998 | Provincial statute | Repair and maintenance duties, owner changes to common elements (s. 98), damage and noise (s. 117), compliance (s. 119) |
| Declaration | Registered when the corporation was created | Unit boundaries (often in Schedule C), exclusive-use areas, any shift of repair duties to owners, conditions on use |
| By-laws | Voted on by the board and owners, then registered | How the corporation operates, and the standard unit that separates the corporation's insurance from your improvements |
| Rules | Made by the board under section 58 | Working hours, elevator bookings, deposits, contractor requirements, flooring and noise standards |
Is it your unit or a common element? Check the declaration first
Every condo renovation question starts with a boundary. The CAO points owners to Schedule C of the declaration for the unit's boundaries. Anything outside them is a common element, owned by the corporation, even if only you use it.
Boundaries differ from building to building. In many Ontario declarations, the concrete slabs, columns and pipes that serve more than one unit are common elements, while drywall, cabinets, fixtures and finishes inside the unit belong to the owner. That is why coring a new drain or opening a shared chase can turn an in-suite renovation into a common-element change.
- Inside your unit: cabinets, counters, tile, vanities and fixtures, subject to the rules and the board's approval process.
- Common elements: structure, shared piping and risers, hallways and anything else outside the unit boundary.
- Exclusive-use common elements: balconies, terraces and similar areas only you use, which the corporation still owns.
Section 98: the legal route for changing common elements
Section 98 lets an owner make an addition, alteration or improvement to the common elements, if it is not contrary to the Act or the declaration, only when four conditions are met:
- the board has approved it by resolution;
- the owner and the corporation have signed an agreement that allocates the cost, sets out who is responsible for repair after damage, maintenance and insurance, and covers anything the regulations require;
- the notice and owner-vote requirements of section 97 are met wherever they would apply if the corporation made the change itself, including a vote in favour by owners of at least 66 2/3 per cent of units for a substantial change; and
- the corporation has sent owners a copy of the agreement with that notice.
| Subsection | What it means for an owner |
|---|---|
| 98(2) | For an exclusive-use area, the notice steps can be skipped if the board is satisfied the change will not harm other units, cost the corporation money, detract from the building's appearance or breach the declaration, with an engineer's certificate for structural work |
| 98(3) | The agreement takes effect only after the corporation registers it against the title to your unit |
| 98(4) | If you fail to comply, the corporation can add its costs, charges, interest and expenses to your common expenses |
| 98(5) | The agreement binds the unit, so the next owner inherits it |
Who pays for repairs, insurance and deductibles
The Act's starting point: the corporation repairs the units and common elements after damage and maintains the common elements, and each owner maintains their own unit (sections 89 and 90). The declaration can shift those duties, for example by making each owner repair their unit after damage (section 91).
- The standard unit is defined in a by-law under section 56(1)(h) or, if there is none, in a schedule to the declaration.
- The CAO tells owners to carry personal condo insurance that covers improvements and accidents. See condo renovation insurance and liability.
| Situation | Default under the Act | Section |
|---|---|---|
| Your new tile, vanity or millwork is damaged | The corporation's repair duty and its insurance stop at the standard unit; upgrades above it are improvements | 89(2), 99(4) |
| You, a tenant or someone living in your unit causes damage to the unit | The lesser of the repair cost and the corporation's deductible is added to your common expenses; a by-law can widen this | 105(2), 105(3) |
| The corporation does work you were obliged to do | You are deemed to consent and the cost is added to your common expenses | 92(4) |
| You break a section 98 agreement | The corporation's costs are added to your common expenses | 98(4) |
Your contractor's noise and conduct are your responsibility
Section 117 bars anyone from causing a condition or activity likely to damage the property or injure someone, and from carrying on an activity that creates unreasonable noise that is a nuisance to others in the building. Section 119 requires owners to take all reasonable steps to make sure their invitees, agents and employees comply with the Act, the declaration, the by-laws and the rules. Your renovation crew falls inside that.
Disputes about noise under section 117(2), and about rules governing nuisance, can go to the Condominium Authority Tribunal. Disputes that also involve a section 98 agreement or a section 117(1) damage issue cannot (O. Reg. 179/17, section 1(3)); those can end up in mediation, arbitration or an application to the Superior Court of Justice to enforce compliance under section 134.
The City adds its own layer. Toronto's noise by-law prohibits clearly audible construction noise from 7 p.m. to 7 a.m. (until 9 a.m. on Saturdays) and all day on Sundays and statutory holidays, and building rules can be stricter. See condo elevator bookings, working hours and noise rules.
Board approval does not replace a building permit
The corporation and the municipality approve different things. The CAO notes that municipalities require permits for structural changes and may also require them for plumbing, electrical and exterior work. In Toronto, Toronto Building says replacing plumbing fixtures and installing cabinetry and millwork do not need a permit, while structural alterations and installing or modifying plumbing systems do.
A board can approve work that still needs a permit, and a permit does not satisfy the board. Owners in other GTA municipalities should confirm with their own building department. The practical steps on the condo side are in getting condo board approval for a renovation.
Questions
Can my condo board refuse a renovation?
Yes. Common-element changes need the board's approval by resolution, and the rules can regulate in-suite work as long as they are reasonable and consistent with the Act, declaration and by-laws. The CAO says work that threatens structural integrity, breaks the governing documents or affects other owners' safety is unlikely to be approved.
Does a section 98 agreement show up when I sell?
Yes. It is registered against the unit's title and binds future owners, so a buyer's lawyer will see it. Keep a copy with your renovation drawings, permits and warranties.
What is a standard unit, and why does it matter for a renovation?
It is the baseline finish the corporation repairs and insures after damage, set by a by-law under section 56 or a schedule to the declaration. Upgrades above it, such as custom millwork or porcelain slab walls, are improvements you insure and repair yourself.
Can the corporation enter my unit while the work is going on?
On reasonable notice, the corporation or a person it authorizes may enter a unit at any reasonable time to perform its duties or exercise its powers (section 19). That can include checking a leak, a shut-off or the conditions of an approval.
Sources and further reading
- Condominium Act, 1998, S.O. 1998, c. 19 (Ontario e-Laws)
- Condominium Authority of Ontario: Condo renovations
- Condominium Authority of Ontario: What are common elements and can you change them
- O. Reg. 179/17, Condominium Authority Tribunal (Ontario e-Laws)
- City of Toronto: When do I need a building permit
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides




