Asbestos and lead in older homes before you renovate

If your house was built before 1990, have the materials your renovation will disturb tested for asbestos before demolition: plaster, drywall joint compound, old floor tiles and the layers under them, pipe insulation, and any vermiculite in the attic. Health Canada says a home built before 1960 probably contains lead paint, and Toronto homes built before the mid-1950s may still have a lead water service. Testing first lets the work be planned around what's found instead of stopped by it.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

Where asbestos hides in a kitchen or bathroom renovation

Health Canada says that before 1990 asbestos was mainly used for insulating buildings and homes, and lists the household materials that may contain it. The risk is in disturbing them: drilling, sawing, sanding, scraping or breaking. Left intact and sealed behind walls or floors, Health Canada says, they pose no significant health risk. A kitchen or bathroom renovation disturbs exactly these materials.

Materials Health Canada lists as possible asbestos sources, and when a renovation reaches them
MaterialWhere it is in an older GTA houseWhen the renovation disturbs it
Plaster and cementOriginal walls and ceilings; Ontario's regulation also names acoustical plaster on ceilingsDemolition, opening walls, cutting for pot lights
Drywall, joint compound and spacklingLater walls and patchesRemoving or cutting drywall
Floor tilesOften buried under newer flooring in kitchens and bathroomsLifting the floor down to the subfloor
Insulation on hot water pipes and tanksBasement ceilings under the bathroom or kitchenRerouting drains and supply lines
Vermiculite insulationAttics and some wallsRunning a fan duct, adding pot lights in a top-floor ceiling
Putty, caulking and sealantsAround windows, tubs and old fixturesRemoving windows, tubs and trim
Siding and cement productsExterior wallsCutting a new vent or window opening

Test before demolition, not after the first wall comes down

Health Canada's advice is to hire a professional to test for asbestos before renovating, and if it is found, to have a qualified asbestos removal specialist remove it before the work begins. Doing that during design means abatement can be scheduled as its own step instead of halting a crew mid-demolition.

Ontario's asbestos regulation for construction, O. Reg. 278/05, sets the yardstick labs and contractors use. Material is asbestos-containing if it holds 0.5% or more asbestos by dry weight, analysed by a set U.S. EPA bulk-sample method. Samples must be representative of each area of homogeneous material, and the regulation sets minimum counts; for surfacing material such as ceiling plaster under 90 m², that is three samples. One positive sample is enough to treat the whole area of that material as asbestos-containing.

In practice, sample each distinct material the work will touch: each plaster or ceiling finish, each layer of flooring, joint compound and any pipe wrap. Ask for the lab report in writing and share it with everyone working on the job.

What Ontario's asbestos rules mean for a house renovation

O. Reg. 278/05 states that it does not apply to an owner of a private residence occupied by the owner or their family, or to an owner of a building with no more than four dwelling units where the registered owner or their family lives in one. It does apply to the employers and workers who carry out repairs and alterations, so your contractor's crew works under it. An employer whose workers find material that may contain asbestos in a building they don't own must tell the owner.

The regulation sorts work into three types, each with stricter precautions than the last. These examples are taken from it:

Examples of Type 1, 2 and 3 operations under O. Reg. 278/05
TypeExamples from the regulation
Type 1Removing less than 1 m² of drywall with asbestos joint compound; removing non-friable material without breaking, cutting or sanding it
Type 2Removing 1 m² or more of drywall with asbestos joint compound; removing pipe insulation with a glove bag; disturbing 1 m² or less of friable material
Type 3Removing or disturbing more than 1 m² of friable asbestos-containing material; the constructor or employer must notify a Ministry of Labour inspector before starting

Vermiculite: leave it alone and plan around it

Vermiculite is a loose, pebbly insulation poured between attic joists, and Health Canada lists it among materials that may contain asbestos. Its advice is direct: don't disturb or remove it yourself, don't use the attic for storage, keep children out, and seal gaps around the attic hatch, light fixtures and electrical boxes. If you plan to renovate near it, hire professionals trained to handle asbestos.

This matters more than people expect for a top-floor bathroom. A new exhaust fan duct routed through the attic, or pot lights cut into the ceiling below it, disturbs the insulation directly. Test it first; bathroom exhaust fans and ventilation covers duct routes that may avoid the attic.

Lead paint: the dust is the hazard

Health Canada says a home built before 1960 probably contains lead-based paint; one built between 1960 and 1990 may have it on the exterior, with smaller amounts possible inside; and a house built after 1990 should not contain lead paint. In a renovation, the danger is dust from sanding, scraping or heat on old trim, window casings, doors and stair parts.

To find out, Health Canada suggests sending paint chip samples to a lab or hiring a contractor with x-ray equipment. Where lead paint is present, its fact sheet says:

  • Don't use sanders, heat guns or blowlamps to remove it.
  • Isolate the work area by covering doorways and vents with plastic sheeting and tape.
  • Keep children and pregnant women away from the work area.
  • Clean the area thoroughly at the end of each day, wiping with a damp cloth that is then thrown away.
  • Put scrapings and chips in a sealed container marked Hazardous Waste and dispose of it as your municipality instructs.

Lead in the water service and old plumbing

The City of Toronto says homes built before the mid-1950s may have a lead water service pipe, and lead can also be found in solder used to join pipes before 1990 and in leaded-brass faucets and valves. Health Canada adds that the National Plumbing Code allowed lead pipe until 1975 and lead solder until 1986.

To check, look at the pipe entering your water meter: Toronto says lead is grey, scratches easily and doesn't sound hollow when tapped. A plumber can confirm it, or you can ask 311 for a City records check, which may take up to 30 business days. The City owns the pipe from the watermain to the property line; the homeowner owns the rest.

A kitchen or bathroom renovation that replaces supply piping is the natural time to deal with it. Toronto Public Health strongly recommends replacing your side at the same time as the City's, since cutting only one side can temporarily raise lead levels, and the Priority Lead Water Service Replacement Program lets owners who commit to their side apply for the City's side on a priority basis. The City also offers free lead testing of a drinking water sample. Plumbing upgrades during a bathroom renovation covers the rest of the supply system.

Questions

Is it safe to live in a house that contains asbestos?

Health Canada says there are no significant health risks when materials containing asbestos are tightly bound, in good condition and left undisturbed, for example sealed behind walls or floorboards. The risk comes from releasing fibres by cutting, sanding or breaking them.

Can I remove asbestos myself before my contractor starts?

Ontario's construction asbestos regulation does not apply to the owner of an owner-occupied private residence, but Health Canada advises against disturbing asbestos yourself and recommends a qualified removal specialist. Your contractor's workers remain covered by the regulation regardless.

Does a house built in the 1970s have lead paint?

Possibly. Health Canada says homes built between 1960 and 1990 may have lead paint on the exterior and smaller amounts inside, so test any original paint you plan to sand, scrape or remove.

How long does an asbestos test take?

It depends on the lab and how many samples are taken, so ask when you book. Testing during design keeps any wait for results, and any removal work, off the construction calendar.

Sources and further reading

  1. Health risks of asbestos (Health Canada)
  2. O. Reg. 278/05: Designated Substance, Asbestos on Construction Projects and in Buildings and Repair Operations (Ontario e-Laws)
  3. Lead-based paint (Health Canada)
  4. Reduce your exposure to lead (Health Canada)
  5. Lead in drinking water (City of Toronto)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your kitchen renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.