
Bathroom costs
Heated bathroom floor cost
An electric heated bathroom floor in Ontario costs about $14 per heated square foot installed, including the mat, thermostat and electrician, with a $900 minimum, according to Builders Ontario's October 2026 Simcoe County prices. Most small bathrooms land on that minimum, and GTA labour runs higher. Running one is cheap: at Ontario's November 2026 time-of-use prices, an 80 sq ft heated ensuite floor costs about 9 cents an hour off-peak and 18 cents on-peak at full power.
Installed cost by bathroom size
Only open floor is heated, never the area under the tub, vanity or toilet, so the heated area is well below the room's footprint. That is why a 5 x 8 ft bathroom heats only about 24 sq ft and pays the minimum charge.
Builders Ontario's $14 rate includes the mat, the thermostat, the electrician's labour and the ESA permit. If the electrical panel has no space for another circuit, it adds a few hundred dollars; a full panel upgrade is a separate and larger job.
| Bathroom | Room area | Heated area | Heated floor installed | Tile installed |
|---|---|---|---|---|
| Powder room, 5 x 6 ft | 30 sq ft | 18 sq ft | $900 (minimum) | $475 |
| Main bathroom with tub, 5 x 8 ft | 40 sq ft | 24 sq ft | $900 (minimum) | $630 |
| Ensuite, 10 x 12 ft | 120 sq ft | 80 sq ft | $1,120 | $1,890 |
| Large ensuite, 12 x 16 ft | 192 sq ft | 130 sq ft | $1,820 | $3,025 |
Mat, cable in a membrane or hydronic: the price gap
The three systems differ more in where they make sense than in price per foot. Hydronic tubing pays off where a boiler already heats the house or a whole floor is being heated; for one bathroom, Builders Ontario puts the break-even with electric at around 200 sq ft of heated floor, more than most bathrooms have. It even suggests electric mats inside hydronic homes for spots such as an ensuite on its own thermostat. How each system is built is covered in heated bathroom floors.
| System | Installed cost | Fit for one bathroom |
|---|---|---|
| Electric mat | About $14 per heated sq ft, $900 minimum | Lowest cost on simple rectangular floors |
| Electric cable in an uncoupling membrane | About $17 to $18 per heated sq ft | Costs more; routes easily around toilets and corners |
| Electric, general range | $8 to $15 per sq ft; $600 to $1,200 for a typical bathroom | The usual choice for a single room |
| Hydronic tubing | $7 to $15 per sq ft; retrofits 50% to 80% above new work | Rarely installed for one bathroom on its own |
What a heated floor costs to run at Ontario's 2026 prices
Builders Ontario's mats draw about 12 W per square foot while heating. Multiply by the heated area and by the Ontario Energy Board's Regulated Price Plan prices, effective November 1, 2026, and the hourly cost is small.
These are upper bounds, because once the floor reaches its set temperature the thermostat cycles the heat on and off. Builders Ontario estimates the 80 sq ft ensuite on a morning-and-evening winter program at about 5.5 kWh a day: roughly 90 cents a day, or $25 to $30 a month in cold months, at a blended 16 cents per kWh, with a powder room at about a third of that. Delivery and other charges on your bill come on top of the electricity price.
| Heated area | Power | Off-peak | Mid-peak | On-peak |
|---|---|---|---|---|
| 24 sq ft (5 x 8 ft bathroom) | 288 W | 2.6¢ | 4.2¢ | 5.4¢ |
| 80 sq ft (10 x 12 ft ensuite) | 960 W | 8.7¢ | 14.0¢ | 18.1¢ |
| 130 sq ft (12 x 16 ft ensuite) | 1,560 W | 14.2¢ | 22.8¢ | 29.5¢ |
Set the thermostat schedule around time-of-use hours
When the floor runs matters as well as how big it is. In winter, weekday on-peak runs 7 a.m. to 11 a.m. and 5 p.m. to 7 p.m., mid-peak 11 a.m. to 5 p.m., and off-peak 7 p.m. to 7 a.m., with weekends and holidays off-peak all day. A program that starts warming the floor at 6 a.m. buys its first hour at the off-peak price.
Households on the ultra-low overnight plan pay 3.7¢ from 11 p.m. to 7 a.m. but 37.7¢ from 4 p.m. to 9 p.m. on weekdays, so an evening warm-up there costs about ten times the overnight rate. On tiered pricing, the rate is 11.2¢ up to 1,000 kWh a month in winter and 13.2¢ above it.
What the quote should list besides the mat
A heated floor is electrical work in Ontario, so a complete quote covers more than the heating mat or cable.
- Thermostat and floor sensor. Builders Ontario's rate assumes a programmable thermostat with built-in ground-fault protection and a floor sensor laid in a conduit so it can be replaced later. Installed Ontario rates fold the thermostat in, so ask for the model to be named on the quote.
- The circuit. Up to about 150 sq ft runs on a 120 V circuit; larger areas need 240 V or a relay, per the same guide.
- The ESA permit and inspection, which happen before tile covers the cable. Builders Ontario's rate includes the permit.
- The tile on top, priced separately at about $15.75 per sq ft installed on room area in Builders Ontario's sheet. Heat cannot be added under existing tile without lifting it, so the cheapest time to add a heated floor is when the floor is being replaced anyway.
Questions
Can the heated floor continue into the shower, and what does it add?
Builders Ontario's tiled shower guide prices a mat under both the shower floor and the bathroom floor at the same $14 per heated square foot, adding $900 at the minimum to its premium shower example. Some systems need the local inspector's approval for shower use, so raise it at the design stage.
Is hydronic floor heat cheaper to run than electric?
Over large areas, yes: Builders Ontario cites industry data putting hydronic running costs 40% to 60% below electric. For a single bathroom the saving is a few cents an hour, too little to pay back the boiler connection, pump and manifold below the 200 sq ft break-even Builders Ontario gives.
Do I need a new electrical panel for a heated bathroom floor?
Usually not. At 12 W per square foot, even an 80 sq ft heated floor draws about 8 amps at 120 V, and Builders Ontario adds only a few hundred dollars when the panel has no free space. A panel upgrade comes up when the renovation adds other large loads too.
Sources and further reading
- Builders Ontario: Electric Heated Tile Floor Cost (2026)
- Builders Ontario: Electric vs Hydronic Floor Heating (2026)
- Builders Ontario: Cost of Hydronic Radiant Floor Heating in Ontario (2026)
- Ontario Energy Board: Electricity rates (effective November 1, 2026)
- Builders Ontario: Custom Tiled Shower Cost in Ontario (2026)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





