
Cabinet costs
Custom kitchen cabinet cost
Custom kitchen cabinets in Toronto typically cost $500 to $1,200 per linear foot in 2026, against $200 to $400 for semi-custom, according to HomeStars. A typical Canadian kitchen has 20 to 25 linear feet of cabinetry, so custom work usually totals about $10,000 to $30,000 before countertops and HST. Box material, door style, finish and the number of drawers decide where in that range your kitchen falls.
Custom, semi-custom and stock cabinets side by side
The three levels overlap at their edges, but the per-foot gap between them is wide enough to reset a whole kitchen budget. HomeStars publishes Toronto and national figures:
- Stock and ready-to-assemble: $100 to $300 per linear foot nationally. As a floor, Builders Ontario estimates a flat-pack IKEA SEKTION kitchen at $9,000 to $14,000 installed.
- Semi-custom: $200 to $400 per linear foot in Toronto, using standard box sizes with a wider choice of doors and finishes.
- Custom: $500 to $1,200 per linear foot in Toronto, and up to $1,500 or more nationally for the most elaborate work, built to the room's exact dimensions.
What a linear foot buys at each level
Builders Ontario prices base and upper cabinets separately, which shows where the money sits: base cabinets cost more per foot at every level because they hold the drawers and carry the countertop. Its October 2026 figures are installed, before countertop and HST, for a reference kitchen with an 18 ft base run, 14 ft of uppers, a 3 ft pantry and a 6 ft island.
Builders Ontario adds that GTA labour runs 15% to 25% above Simcoe County or London, that GTA kitchens land 5% to 10% higher overall, and that two honest shops can differ by 10% to 15% on the same drawings.
| Level | Base per ft | Upper per ft | Reference kitchen |
|---|---|---|---|
| Builder | $230 | $170 | $10,000 to $12,000 |
| Mid-grade | $380 | $280 | $16,000 to $19,000 |
| Premium | $600 | $440 | $25,000 to $30,000 |
| Luxury | $900 | $650 | $36,000+ |
Six choices inside the cabinet that change the price
Two kitchens with identical layouts can differ by thousands of dollars because of what the boxes are made of and how the doors and drawers work. The first five figures below come from Builders Ontario's October 2026 guide; the last from RenoQuotes' September 2026 guide.
- Box material. Melamine-faced particleboard is the builder standard; 3/4 in. plywood adds about 15% to 25% per box. See cabinet box materials.
- Door material. Painted MDF is the common mid-grade door in Ontario; solid wood doors cost 20% to 35% more.
- Door style. Shaker and slab doors are standard work, while inset doors take about twice the labour to fit; compare them in kitchen cabinet door styles.
- Drawers. A three-drawer base costs about 40% more than a door-and-shelf unit of the same width, and a drawer-heavy kitchen adds about 15% overall.
- Hardware. Soft-close hinges and runners cost $12 to $25 per door or drawer at the factory, and undermount full-extension runners add $20 to $40 per drawer over side-mount.
- Finish material. RenoQuotes' per-foot ranges by material: melamine $250 to $400, polyester $450 to $600, thermofoil $500 to $750, solid wood $850 and up.
Pantries, islands and panels are where custom costs climb
Wall runs are the cheapest feet in a kitchen. Pantries and islands cost more per foot, as does anything finished on every visible side. Crown moulding, light rails, fillers, finished ends and toe kicks add about 6% of the cabinet price, and installation runs $100 to $300 per linear foot, or 15% to 20% of the cabinet price, depending on how the shop bills it (Builders Ontario).
Integrated appliances move money into cabinetry as well, since a panel-ready fridge or dishwasher needs a door panel to match. The modern kitchen in Vaughan built a full oak appliance wall around built-in appliances, and the condo kitchen with city views used 12-foot custom millwork with tall blue shaker pantry cabinets.
Order early: lead times and deposits
Custom cabinets are built after final measurements, so they take longer than stock boxes. Builders Ontario notes that good local shops are booked three to four months out by spring, and that a deposit of 10% to 30% at order is common while 50% before the final measure is not. Settle cabinet decisions early in design so the order is placed before demolition, and see renovation deposits and payment schedules for what a fair schedule looks like.
Questions
Is refacing much cheaper than new custom cabinets?
Yes, when the existing boxes are sound. RenoQuotes puts refacing at $6,000 to $15,000 and HomeStars at $5,000 to $12,000 for a full kitchen, since only doors, drawer fronts and visible surfaces change. Refacing cannot fix a poor layout; kitchen cabinet refacing cost has the detail.
How do I count the linear feet in my kitchen?
Measure along the wall wherever cabinets run, in feet. Some shops count base and upper runs together, which RenoQuotes describes as the common method, while others price base and uppers separately, as Builders Ontario does. Ask which method a quote uses before comparing per-foot prices.
Are custom cabinets worth it in a small kitchen?
Often, because a small kitchen has the least room to waste. Custom boxes can fill odd widths and full ceiling heights that stock sizes leave as fillers, and fewer linear feet keep the total down even at a higher per-foot rate. See kitchen cabinets to the ceiling.
Sources and further reading
- HomeStars: How Much Do Renovations Cost in Toronto in 2026?
- HomeStars: Kitchen Cabinets Cost
- Builders Ontario: Kitchen Cabinet Cost in Ontario (2026)
- RenoQuotes: Kitchen Renovation Cost in Canada in 2026
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





