Kitchen costs
Kitchen renovation cost in Toronto
A mid-range kitchen renovation in Toronto typically costs $25,000 to $75,000 in 2026 for new cabinetry, countertops, appliances, lighting and plumbing, according to HomeStars' August 2026 Toronto guide. A countertop-and-backsplash refresh runs about $15,000 to $20,000, and high-end custom kitchens with layout changes start around $100,000. Add 13% HST, and expect the figure for your kitchen to depend on its layout, its cabinetry and what sits behind the walls.
Toronto kitchen budgets by scope of work
Scope, more than square footage, sets the band a kitchen lands in. A refresh keeps the boxes and the plumbing; a renovation replaces them; a high-end project moves walls and builds around integrated appliances.
RenoQuotes' September 2026 guide is a useful cross-check: it puts a mid-range kitchen in Toronto and the GTA at $40,000 to $75,000. Where the two guides overlap, $40,000 to $75,000, is a fair planning band for a full renovation of a typical house kitchen.
| Scope | What it usually covers | Typical cost |
|---|---|---|
| Refresh | New countertops and backsplash | $15,000 to $20,000 |
| Mid-range renovation | New cabinetry, countertops, appliances, lighting and plumbing | $25,000 to $75,000 |
| High-end custom | Layout changes, integrated appliances, stone countertops | $100,000+ |
Does a bigger kitchen cost much more?
Less than most people expect. RenoQuotes points out that the plumber, electrician, cabinet installer, stone fabricator and tile setter each attend a small kitchen much as they attend a large one, so their call-out costs are close to fixed. Its size bands are national, and RenoQuotes also estimates that Toronto trade rates run 25% to 40% above the national average, so treat them as a floor for the GTA.
Per square foot, HomeStars' national kitchen data averages about $195, with homeowners reporting $97 to $326. Small kitchens tend to sit high in that per-foot range because the same fixed trade visits are spread over fewer square feet.
| Kitchen size | Typical cost |
|---|---|
| Small, under 70 sq ft (condo or galley) | $15,000 to $28,000 |
| Medium, 70 to 150 sq ft | $25,000 to $60,000 |
| Large, over 150 sq ft | $45,000 to $90,000+ |
Six decisions that move a kitchen budget the most
Each of these choices can shift a budget by thousands of dollars on its own. Settle them during design, before demolition, when changing your mind costs only a drawing.
- Cabinet tier. Custom cabinetry runs $500 to $1,200 per linear foot in Toronto and semi-custom $200 to $400 (HomeStars). Across the 20 to 25 linear feet in a typical kitchen, the gap can pass $15,000. See custom kitchen cabinet cost.
- Countertop material. RenoQuotes lists quartz at $110 to $180 per sq ft installed against $35 to $70 for laminate, and most kitchens have 30 to 40 sq ft of counter. Details in quartz countertop cost.
- Moving the sink. Relocating kitchen plumbing costs $2,500 to $5,000 in Toronto (HomeStars), and RenoQuotes prices moving the sink into an island at $2,500 to $5,500 extra.
- Opening a wall. Removing a load-bearing wall runs $2,000 to $10,000 including engineering and permits (HomeStars); see removing a load-bearing wall for an open kitchen.
- Appliance package. RenoQuotes prices a basic package at $3,000 to $6,000, mid-range at $6,000 to $12,000 and premium or built-in at $15,000 and up. Panel-ready appliances also need matching cabinet panels, like the full oak appliance wall in this modern kitchen in Vaughan.
- Ventilation and power. A range hood ducted outdoors and new dedicated circuits for an induction cooktop or wall oven add electrical and carpentry hours, more so in older houses with small electrical panels; see electrical upgrades in a kitchen renovation.
What Toronto houses add to the bill
Toronto's older housing brings costs a newer suburban kitchen may never see. Semi-detached and Victorian houses often have plaster walls, out-of-level floors and wiring or plumbing from several eras, and any of these can surface once the old cabinets come off. The semi-detached kitchen guide covers the usual suspects.
Location shifts the price too. HomeStars finds the same scope generally costs 10% to 20% less in Scarborough, Etobicoke or North York than in central Toronto.
Permits are a modest line when they apply. Toronto Building's 2026 schedule charges $11.53 per square metre for interior alterations in a house, with a $214.79 minimum, plus $23.20 per plumbing fixture in a single-family dwelling. Whether your kitchen needs one depends on the work: see do you need a permit for a kitchen renovation in Toronto. Condo kitchens follow building rules with costs of their own, covered in condo renovation cost in Toronto.
Trade rates behind a Toronto kitchen quote
HomeStars' 2026 Toronto figures show what the hours in a kitchen quote are worth. Labour usually takes 40% to 50% of a renovation budget, and general contractors typically add 15% to 20% to subcontractor costs plus a 10% to 15% project management fee.
| Trade | Hourly rate |
|---|---|
| General contractor | $75 to $120 |
| Plumber | $80 to $150 |
| Electrician | $90 to $140 |
| Carpenter | $70 to $110 |
| Tile installer | $65 to $100 |
What a kitchen estimate should spell out
Two quotes for the same kitchen can differ by tens of thousands of dollars simply because they include different things. RenoQuotes notes that many kitchen quotes leave appliances out entirely unless they are chosen at the design stage. Before comparing totals, confirm that each estimate states:
- Appliances: included, carried as an allowance, or excluded
- Countertop material, thickness and edge profile
- Cabinet construction: box material, door style and hardware
- Permits, disposal and protection of the rest of the house
- HST at 13%, shown as its own line
- Your own contingency of 15% to 20%, held outside the contract price
Questions
How much should I spend on a kitchen relative to my home's value?
HomeStars cites a common rule of 5% to 15% of the home's value. On a $1.2 million Toronto house that gives $60,000 to $180,000, so in this market the rule works better as a ceiling than a target. Price the scope you actually need first, then check it against the rule.
Are appliances usually included in a kitchen renovation quote?
Often not. RenoQuotes notes that many contractor quotes exclude appliances unless they are specified during design. Ask each contractor to show appliances as a fixed list, an allowance or an exclusion so you compare like with like.
Is it cheaper to keep my existing kitchen layout?
Usually, yes. Keeping the sink, range and dishwasher where they are avoids the $2,500 to $5,000 HomeStars puts on relocating kitchen plumbing, and keeping walls avoids structural work. The money saved can go into cabinetry or counters instead.
What does a kitchen renovation cost per square foot in Toronto?
HomeStars puts a mid-range single-room renovation in Toronto at $150 to $300 per square foot, and its national kitchen data averages about $195. Per-foot figures run higher in small kitchens, so use them as a rough check rather than a way to price your own.
Sources and further reading
- HomeStars: How Much Do Renovations Cost in Toronto in 2026?
- RenoQuotes: Kitchen Renovation Cost in Canada in 2026
- HomeStars: Kitchen Renovation Costs and Estimates in Canada
- City of Toronto: Building Permit Fees (2026)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.