Bathroom plumbing

Plumbing upgrades during a bathroom renovation

Open walls are the cheapest chance you will get to fix a bathroom's plumbing for decades. Replace aging supply lines and add shut-offs you can reach, check that the drains and stack can take the new fixtures, give every new trap a proper vent, confirm the water pressure and scald protection, and hire a licensed plumber, because plumbing is a compulsory trade in Ontario. Moved or added fixtures also need a plumbing permit and a rough-in inspection before anything is covered.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

What older GTA bathrooms tend to hide behind the tile

A bathroom built or last renovated decades ago often has plumbing older than anything you can see. Demolition is when it shows, and the table below is what to look for once the walls and floor are open. Old house surprises behind the walls covers the non-plumbing finds.

Plumbing to inspect in an older house, and the usual upgrade
SystemWhat you may findTypical upgrade
Water service into the houseToronto says homes built before the mid-1950s may have a lead service pipeReplace the private side, ideally at the same time as the City's side
Supply pipingGalvanized steel, or copper joined with lead solder, which Toronto says was used before 1990New supply lines run from a sound point back toward the main
Fixtures and valvesLeaded-brass faucets and valves, also flagged by TorontoNew fixtures and stop valves
Shut-offsFixtures with no individual stops, or a main valve that won't closeA stop at every fixture and a working main
Drains and stackOld cast-iron or mixed-material drains, or a stack that can't take a new connectionReplace the section serving the bathroom
VentingFixtures added over the years without proper vents; drains that gurgleNew vent piping tied into the system

Supply lines and shut-offs: plan for the next leak

Water supply is the part of the system under constant pressure, so it is where leaks start. If the walls are open, replace old supply piping serving the bathroom rather than connecting new fixtures to it, and give every fixture its own stop valve so a toilet or faucet can be serviced without shutting off the house. Make sure the main shut-off works and that everyone in the house knows where it is.

Size the supply for what the new bathroom does. A rain head plus a hand shower, body sprays or a large soaking tub ask more of the pipes and the water heater than the old tub and shower did, and a thermostatic valve with separate volume controls handles multiple outlets better than a single-handle valve; see thermostatic and pressure-balanced shower valves. Pipes on an exterior wall need insulation on the warm side so they don't freeze.

If the house still has a lead service, the City of Toronto recommends replacing your side and the City's side together, because cutting only one can temporarily raise lead levels. Its Priority Lead Water Service Replacement Program lets owners who commit to replacing the private portion apply to have the City's portion done on a priority basis; asbestos and lead in older homes explains how to check.

Pressure and temperature: two limits Ontario sets

Pressure. Ontario's plumbing rules call for a pressure-reducing valve where static pressure at a fixture could exceed 550 kPa, about 80 psi. A plumber can check yours with a gauge on a hose bib or laundry tap with everything else off. Very high pressure strains valves and supply hoses; very low pressure at one bathroom often points to undersized or corroded piping, or an old service.

Temperature. The Ontario Building Code limits water from a shower head or into a bathtub to 49°C and requires valves serving fixed shower heads to be individually pressure-balanced or thermostatic. That protects against scalds when someone flushes a toilet mid-shower, and it is one more reason the valve is chosen before rough-in.

Drains and vents decide where fixtures can go

Water supply can go almost anywhere in a small tube; drains cannot. Every fixture needs a trap, the trap's water seal needs a vent to protect it, and the drain needs a steady slope back to the stack. That is why moving a toilet even a short distance can mean opening the floor: its drain may have to cross joists, and its vent has to join the system before the walls close.

The stack is the anchor. Fixtures close to it are simple; fixtures far from it need longer runs, more slope and their own vents. A curbless shower or linear shower drain also needs enough floor depth for the drain body and the slope, which is decided by the joists you find. In a condo, the building's risers fix most of these positions; see condo plumbing risers, shut-offs and leaks.

Licensed plumbers, the permit and the two inspections

Plumber is one of Ontario's compulsory trades under the Building Opportunities in the Skilled Trades Act, 2021. Skilled Trades Ontario states that working in a compulsory trade requires a valid certificate of qualification, a provisional certificate or a registered training agreement, that journeypersons renew their certificate each year, and that you can check a person on its Public Register. The trade's scope of practice includes laying out and installing water supply and drainage piping and fixtures, connecting appliances that use water, and making joints in piping.

Moving or adding fixtures is new plumbing, and in Toronto that needs a permit; the bathroom permit guide covers which projects need one. Toronto then inspects twice: the rough-in of water supply, drains, waste and vents once complete and ready for testing, and a final inspection when the fixtures are installed. The property owner must book the final inspection that closes the permit.

Upgrades worth adding while the walls are open

Some improvements cost little during a renovation and a lot afterwards. Discuss these with your plumber at the design stage, before the rough-in is drawn.

  • A stop valve at every fixture, with access to the main shut-off kept clear.
  • New supply lines from a sound point in the system, rather than splicing onto old galvanized or lead-soldered pipe.
  • An access panel for a valve or tub connection that would otherwise be sealed behind tile.
  • Supply and drain positions set to the exact vanity, toilet and tub you chose, including any wall-hung toilet carrier.
  • Water-efficient fixtures; see low-flow toilets and water efficiency in Ontario.
  • Insulated supply lines on exterior walls, and a check that the water heater can fill a large tub.

Questions

Should I replace galvanized pipes during a bathroom renovation?

If the walls are open and the bathroom is fed by galvanized steel, replacing that run is usually sensible, because corrosion inside old steel pipe reduces flow and causes leaks. At minimum, avoid connecting new fixtures to it.

Can a general labourer do the plumbing in my renovation?

Not the plumbing itself. Plumber is a compulsory trade in Ontario, so the work must be done by someone with a certificate of qualification or a registered apprentice working under the rules. You can check certificates on Skilled Trades Ontario's Public Register.

How do I find out my home's water pressure?

A plumber can thread a pressure gauge onto a hose bib or laundry tap and read it with no water running. If static pressure could exceed 550 kPa (about 80 psi), Ontario's rules call for a pressure-reducing valve.

Do I have to replace the stack when I renovate a bathroom?

Not always. If the stack is sound and can accept the new connections, it can stay. Cracks, heavy corrosion or a connection that won't seal are reasons to replace the section serving the bathroom while it is exposed.

Sources and further reading

  1. Work in the compulsory trades (Skilled Trades Ontario)
  2. O. Reg. 876/21: Prescribed Trades and Related Matters, Building Opportunities in the Skilled Trades Act, 2021
  3. When to call for inspection of small buildings (City of Toronto)
  4. Lead in drinking water (City of Toronto)
  5. O. Reg. 163/24: Building Code (Ontario e-Laws)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.