Renovations

Guides

Ensuite with a glass shower, black towel ladder and freestanding tub beneath a globe pendant cluster

Ensuite costs

Ensuite renovation cost

A mid-range renovation of a 5 x 8 ft ensuite in Toronto runs about $18,000 to $26,000 in 2026, according to HomeStars, and larger primary ensuites of 14 x 14 ft or more range from about $14,000 to $40,000 depending on finishes. Luxury ensuites with heated floors, frameless glass and premium fixtures start around $55,000. These are typical GTA market ranges before HST; the features you choose, more than the room's size, decide where yours lands.

By the Purple Kitchen & Bath team · Updated · 3 min read · Photo: a Purple Properties project

Ensuite budgets by size and finish

The ensuite is usually the bathroom where homeowners add the most: a bigger shower, a second sink, layered lighting and often a tub. HomeStars' 2026 Toronto figures give three reference points:

  • A 5 x 8 ft ensuite, mid-range: $18,000 to $26,000
  • A large ensuite of 14 x 14 ft or more: $14,000 to $40,000
  • A luxury renovation with heated floors, frameless glass and premium fixtures: $55,000 and up

Feature by feature: what each upgrade adds

The large-ensuite band starts low because a big room with simple finishes can cost less than a small one packed with features. The useful way to budget an ensuite is therefore feature by feature. Builders Ontario's figures are October 2026 prices from Simcoe County and Central Ontario, so expect GTA quotes to run above them; the HomeStars lines are Toronto figures.

Ensuite feature costs, 2026, before HST. Sources: Builders Ontario, Custom Tiled Shower Cost in Ontario (October 2026), and HomeStars, Bathroom Renovation Costs in Toronto (August 2026).
FeatureWhat it involvesTypical costSource
Frameless glass door and panel3/8 in. glass, measured after the tile is grouted$1,500 to $3,000Builders Ontario
Electric heated floorHeating mat under tile, thermostat, electricianAbout $14 per heated sq ft, $900 minimumBuilders Ontario
Tiled shower benchSloped top, waterproofed on five sidesAbout $450Builders Ontario
Recessed nicheFramed, waterproofed and tiledAbout $250 eachBuilders Ontario
Curbless entryRecessed floor, slope and linear drainAbout $1,200 over a curbed panBuilders Ontario
Bathtub installationTub set, levelled and connected$2,500 to $5,000HomeStars
Lighting and ventilationPot lights, outlets, exhaust fan$1,000 to $2,500HomeStars
Moving a toilet or drainNew drain and vent route$2,000 to $5,000+HomeStars

Costs that belong to ensuites in particular

Because an ensuite opens off a bedroom, usually on an upper floor, it carries a few costs a hall bathroom may not.

  • A second sink. A double vanity needs a second drain and supply, a longer counter and usually a second light or a wider mirror. In the Old Milton Victorian renovation, the primary ensuite pairs a freestanding tub with a floating oak double vanity.
  • Steam beside a bedroom. A properly sized exhaust fan ducted outdoors keeps moisture out of closets and bedding; see bathroom exhaust fans and ventilation.
  • Hot water. A large soaking tub or a shower with several outlets can outrun an older water heater, which may need upgrading at the same time.
  • Plumbing over a finished ceiling. Moving a drain in an upstairs ensuite often means opening and repairing the ceiling of the room below.
  • A separate toilet room. Framing a water closet adds a wall, a door and often its own light and fan; see separate toilet rooms in a primary bathroom.

Renovating an ensuite costs less than adding one

Renovating an existing ensuite reuses its drain, vent and supply lines, which keeps the plumbing line modest. Adding an ensuite where there was none means new drain and vent runs, often through floor joists, and a building permit. Toronto Building's 2026 schedule charges $23.20 per plumbing fixture in a single-family dwelling on top of a $214.79 minimum fee, a small line next to the plumbing work itself. For scale, HomeStars puts converting a powder room into a full bathroom at $15,000 to $35,000 or more.

The guide to adding an ensuite to a bedroom covers layout and space. Condo ensuites are shaped by building rules and priced in condo bathroom renovation cost.

Questions

Is a freestanding tub worth the space and money in an ensuite?

Only if you will use it. Beyond the tub itself, installation runs $2,500 to $5,000 in Toronto (HomeStars), and a floor-mounted filler needs supply lines run through the floor. If you rarely bathe, a larger shower with a bench usually serves the room better; freestanding vs alcove tubs compares the options.

Can I redo only the shower and keep the rest of the ensuite?

Yes, though matching surrounding tile and patching the floor can be harder than it sounds. HomeStars puts a Toronto shower installation at $8,000 to $15,000; the walk-in shower cost guide breaks that down layer by layer.

Does an ensuite renovation add value at resale?

HomeStars estimates Toronto bathroom renovations recover about 70% to 85% of their cost when the house sells. An updated primary ensuite also matters to buyers comparing similar houses, but plan it first for the years you will use it.

Sources and further reading

  1. HomeStars: How Much Do Renovations Cost in Toronto in 2026?
  2. HomeStars: Bathroom Renovation Costs in Toronto
  3. Builders Ontario: Custom Tiled Shower Cost in Ontario (2026)
  4. City of Toronto: Building Permit Fees (2026)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.