Renovations

Guides

Floor-to-ceiling oak panel wall with long black pulls hiding the fridge beside a built-in wall oven

Kitchen design

Kitchen storage ideas for a renovation

The best kitchen storage ideas for a renovation are built into the cabinet plan rather than added later: deep drawers instead of doors in the base cabinets, a working corner fitting, an appliance garage for the things that live on the counter, toe-kick and end-panel space, and a sink base laid out for garbage, recycling and organics. Start by counting what you have against the National Kitchen & Bath Association's targets, which run from 1,400 inches of shelf and drawer frontage in a small kitchen to 2,000 in a large one.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

Audit the storage you have before you choose any fittings

A renovation is the one time you can size storage to how you cook, so measure what the old kitchen holds first. The National Kitchen & Bath Association (NKBA) counts storage as frontage: cabinet width in inches, times the number of shelves or drawers, times the depth in feet. Its targets are about 1,400 inches in a kitchen under 150 square feet, 1,700 inches from 151 to 350 square feet and 2,000 inches above that, with anything more than 84 inches off the floor counted only as miscellaneous.

The worked example below audits a typical medium kitchen with door-front base cabinets, then shows what two common renovation moves add. Run the same arithmetic on your own cabinets and you will see where the shortfall is before you shop for fittings. If the gap is mostly food storage, start with kitchen pantry design.

Worked example: storage audit of a medium kitchen against the NKBA 1,700-inch target
CabinetsArithmetic (width x levels x depth in feet)Frontage
Wall cabinets, 108 in of run, three shelf levels, 12 in deep108 x 3 x 1324 in
Door-front base cabinets, 72 in of run, two levels, 24 in deep72 x 2 x 2288 in
One drawer bank, 18 in wide, four drawers18 x 4 x 2144 in
Sink base, 36 in wide, one level36 x 1 x 272 in
Existing total828 in, less than half the target
Move 1: the 72 in of door bases rebuilt as three-drawer stacks72 x 3 x 2432 in (adds 144)
Move 2: add a 24 in tall pantry with five roll-outs24 x 5 x 2240 in (adds 240)
Total after both moves1,212 in

Deep drawers instead of doors in the base cabinets

Replacing base-cabinet doors with drawers is the single biggest storage upgrade in most renovations. Drawers bring the contents to you instead of making you kneel and reach, and roll-out trays behind a door end up narrower than a drawer because the open door blocks part of the cabinet width. Frameless cabinets, with no centre stile, add usable width again.

Specify runners for the load. Deep pot drawers carry cast iron and stacks of plates, so look for full-extension runners with a heavy-duty rating: one major maker sells its drawer systems in 40 kg and 70 kg load classes, and the 70 kg class belongs under the cooktop and anywhere plates live. A common base layout is a shallow top drawer for cutlery and utensils over two deep drawers for pots, lids and dishes; within them, dividers, peg systems and cutlery inserts do the sorting, which kitchen drawer organizers and cabinet inserts covers in detail.

Four ways to stop losing things in the corner cabinet

Any L- or U-shaped kitchen has a blind corner, and NKBA's guidelines recommend that at least one corner cabinet include a functional storage device. The choice depends on whether the corner is reached from a diagonal door or a straight door beside the corner.

Corner cabinet storage options
OptionHow it worksBest forTrade-off
Lazy susan or carouselRound or three-quarter shelves rotate in a diagonal or L-shaped corner cabinetMedium items, mixing bowls, small appliancesRound shelves waste the square corners; one maker rates carousel shelves at 25 kg each
Swing-out corner traysShaped trays swing out of the blind corner and through the door openingHeavier pots in a blind cornerHigher cost; one maker claims up to 70 per cent more usable space than a pull-out beside a dead corner
Linked pull-out framesA front frame pulls out and draws a rear frame from the corner into the openingBlind corners behind a hinged doorSeveral moving parts; one maker rates the system at up to 32 kg
Corner drawersDrawers with an angled front that run diagonally into the cornerKitchens with drawers everywhere elseSpecialty boxes and runners; must be planned with the cabinet maker

Appliance garages for the things that live on the counter

An appliance garage hides the toaster, stand mixer or coffee machine on the counter itself, so it can be used without being lifted out of a cabinet. It is usually a cabinet that sits on the counter beneath the wall cabinets, which typically hang about 18 inches above the counter, closed by a lift-up door, pocket doors that slide back into the sides, or a roll-up tambour.

Plan the power with it. The Electrical Safety Authority's October 2026 kitchen receptacle bulletin lists a dedicated receptacle for a microwave, wall cabinet, shelf or enclosure among additional receptacles, which need arc-fault protection, and separately requires counter receptacles placed so that no point along the counter is more than 900 mm from one. Treat the outlet inside the garage as extra, not as a substitute for the counter receptacles, and confirm the layout with your electrician. Leave room for heat to escape from a toaster or coffee maker, or keep those on an open counter. For a dedicated drinks area, see coffee station and beverage centre ideas.

Toe kicks, panel ends and other found space

Once the main cabinets are planned, look for the gaps the plan leaves behind. Each holds less than a drawer, but together they clear the counters.

  • Toe-kick drawers use the space under the base cabinets for flat items such as baking sheets, placemats or pet bowls. A fold-out step can live there too: one maker's toe-kick step locks when about 8 kg of weight is on it, giving shorter people a reach to the top shelves.
  • Tall narrow pull-outs beside the range hold oils, spices and sheet pans upright.
  • Cabinets to the ceiling. Wall cabinets commonly come in 30, 36 and 42-inch heights, and ceilings over 9 feet can take a second tier of boxes for seldom-used items; see kitchen cabinets to the ceiling.
  • A deep cabinet over the fridge, brought forward to the front of the fridge, turns a shelf you cannot reach into a home for trays and platters.
  • The back of the island can carry shallow cabinets or shelves on the seating side, as long as knees still have the depth they need.

Plan the sink base for garbage, recycling and the Green Bin

The sink base is the busiest cabinet in the kitchen, and Toronto's collection rules decide how it should be laid out. The NKBA recommends at least two waste receptacles, one of them for recycling; a pull-out with two or three bins in the cabinet beside the sink covers garbage, recycling and organics without a bin on the floor.

The City of Toronto's Green Bin takes food waste plus soiled paper towels, tissues and napkins, and the City says you can line your kitchen catcher or Green Bin, not both, with any plastic bag, so compostable bags are not necessary. Blue Bin items go in loose, not bagged, so the recycling bin can be emptied straight out. Note that since January 1, 2026 the City no longer collects residential recycling itself, so check current Blue Bin rules with the producer-run program before choosing bin sizes.

Under the sink itself, a U-shaped drawer that wraps around the drain and supply lines recovers space that a door and a single shelf waste.

Questions

Are drawers really better than doors in lower cabinets?

For most items, yes. A drawer pulls its contents out to you, while a shelf behind a door means kneeling and reaching to the back. Doors still make sense for tall items such as large platters or a sink base.

What is the best way to use a blind corner cabinet?

Swing-out trays or linked pull-out frames bring the far corner into the door opening, and they hold heavier items than a lazy susan. If the corner is reached from a diagonal door, a carousel is simpler and cheaper.

How many garbage and recycling bins should a Toronto kitchen have?

Plan for three streams: garbage, recycling and Green Bin organics. A pull-out beside the sink with two larger bins and a small kitchen catcher handles all three without a bin on the floor.

Can I add storage without making the kitchen bigger?

Usually. Converting base doors to drawers, running cabinets to the ceiling, fitting the corner properly and using toe-kick and end-panel space all add frontage inside the same footprint.

Sources and further reading

  1. National Kitchen & Bath Association: Kitchen Planning Guidelines with Access Standards (Guidelines 14, 27, 28 and 29)
  2. Electrical Safety Authority: Bulletin 26-23-8, Receptacle requirements in kitchens of dwelling units
  3. City of Toronto: What goes in my Green Bin
  4. Blum Canada: LEGRABOX drawer system (40 and 70 kg load classes)
  5. Kesseböhmer: LeMans corner unit

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your kitchen renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.