Renovations

Guides

Bathroom with purple floral wallpaper, an ornate gold oval mirror, navy floating vanity and orange wall

Renovation planning

How to plan a kitchen or bathroom renovation

Plan a kitchen or bathroom renovation in a fixed order: decide what the room must do and what you can spend, check the house for problems, choose who will design and build it, finish the drawings and every selection, sort out permits and approvals, then build the schedule around lead times and prepare the household. Many schedule problems trace back to a step taken out of order, such as ordering cabinets before the layout is final or opening a wall before the permit is issued.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

Step 1: Define the room, the budget and the house you're working with

Start with what the room has to do. A kitchen for a family of five who cook every night is a different plan from one for two people who entertain, and an ensuite shared by two people at 7 a.m. needs different storage and fixtures from a guest bath. Collect images of what you like and what you don't; moodboards and design references for a renovation shows how to make them useful to a designer.

Next, set a budget with a contingency before you see a single quote. How to set a renovation budget and contingency and kitchen and bathroom renovation costs in Toronto cover the numbers.

Then look hard at the house. Health Canada says a home built before 1960 probably contains lead-based paint, and older Toronto houses can hide wiring and plumbing that has to change once walls open. Read asbestos and lead in older homes before you renovate, knob and tube wiring and renovations and old house surprises behind the walls before the budget is fixed.

Step 2: Choose who designs and who builds

Decide early whether one firm will design and build, or whether a designer draws and a separate contractor builds. Either can work. What matters is that whoever draws the plan understands what it costs to build, and that one party owns the schedule. Design-build renovation explained and how to choose a renovation contractor in Toronto compare the routes, and how to prepare for a renovation consultation lists what to bring to a first meeting.

Step 3: Finish the design and every selection before demolition

A renovation moves only as fast as its last decision. Design turns measurements into drawings (the renovation design process, from measurements to drawings), and selections lock every product with an order date (choosing renovation finishes without delays). The kitchen renovation checklist and the bathroom renovation checklist catch the items that go inside walls and floors, where late changes are most expensive.

Systems belong in this step because they decide what is possible. Electrical upgrades in a kitchen renovation covers circuits and panel capacity, and plumbing upgrades during a bathroom renovation covers drains, venting and supply.

Step 4: Sort out permits and approvals as the design is finished

Permits follow the design, not the other way round. In Toronto, cosmetic work such as new cabinets, or fixtures replaced where they already are, needs no building permit, while removing walls, creating openings and installing new plumbing do. Each room has its own triggers: see do you need a permit for a kitchen renovation in Toronto and do you need a permit for a bathroom renovation in Toronto.

Two more approvals run alongside. The Electrical Safety Authority notes that an electrical notification is not the same as a building permit, and you may need both; condo owners also need the corporation's sign-off (condo renovation rules in Ontario). Once building starts, the City inspects at set stages, explained in building inspections during a Toronto renovation.

Step 5: Build the schedule around lead times and your calendar

Purple Kitchen & Bath states that most GTA renovations take 6 to 16+ weeks depending on scope, complexity and change orders, and the time before demolition comes on top of that. The table shows what sets each stage; the detail is in how long does a kitchen renovation take and how long does a bathroom renovation take.

The calendar matters too. The best time of year to renovate in Toronto and planning a renovation around holidays and deadlines help you pick a start date you can live with.

What sets the length of each planning and building stage
StageWhat sets its length
Design and selectionsHow quickly decisions are made
Permit review, when needed10 business days for a house in Ontario, once the application is complete
Cabinet and vanity productionWeeks after ordering, and ordering waits for a final design
ConstructionScope, inspections, cure times and what is found behind the walls
CountertopsTemplated only after cabinets are installed and levelled, then fabricated
Shower glassMeasured only after tile is finished, then made to fit

Step 6: Prepare the household for weeks of work

The days before work starts are for clearing rooms, protecting floors and agreeing how trades will come and go; see preparing your home for renovation day one. A kitchen project also needs a temporary kitchen (living without a kitchen during a renovation), every project needs a dust plan (renovation dust control), and families with young children or animals should read renovating with kids and pets at home.

Step 7: Follow the build and close it out properly

During construction, know what each week should look like: what happens during a kitchen renovation, week by week and what happens during a bathroom renovation, week by week set out the sequence.

At the end, walk the room with a written list (renovation punch lists and deficiencies), make sure any permit is closed with a final inspection, which Toronto requires owners to book, keep manuals and warranty papers together, and learn how to look after the new surfaces (caring for new finishes after a renovation).

Questions

What should I decide first, the layout or the finishes?

The layout, because it sets plumbing, wiring and cabinet sizes. Finishes can be chosen in parallel, but anything that affects dimensions, such as appliances, a vanity or a freestanding tub, has to be fixed before the drawings are final.

Can I renovate the kitchen and a bathroom at the same time?

Yes, and it can shorten the total because trades move between rooms. It also means living without both at once, so make sure you will still have a working bathroom as well as a temporary kitchen.

Do I need an architect for a kitchen or bathroom renovation?

Usually not for interior work in a house. Toronto accepts permit drawings from a qualified designer who signs them with their registration details, and structural changes such as a new beam often need an engineer's seal. Additions and larger changes are a different conversation.

What does a renovation plan need before getting quotes?

Enough to compare like with like: a measured layout, a list of what stays and what moves, and the level of finish for cabinets, counters, tile and fixtures. Without those, contractors price different projects; how to compare renovation quotes explains what to line up.

Sources and further reading

  1. When do I need a building permit? (City of Toronto)
  2. Is an electrical notification the same as a building permit? (Electrical Safety Authority)
  3. Reduce your exposure to lead (Health Canada)
  4. When to call for inspection of small buildings (City of Toronto)
  5. Interior alterations: application guide (City of Toronto)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Planning, permits and process

Every guide in this collection

PlanningDo you need a permit for a kitchen renovation in TorontoToronto kitchen permit rules: when walls, new openings, plumbing, gas and wiring need a City permit, an ESA filing or a licensed gas fitter, and what doesn't.
PlanningDo you need a permit for a bathroom renovation in TorontoWhen a Toronto bathroom needs a plumbing permit: moved toilets, new showers, ensuites and basement bathrooms, plus the fixture fees, inspections and exemptions.
PlanningHow long does a kitchen renovation takeKitchen renovation timelines in Toronto: weeks on site, cabinet and countertop lead times, permit review, inspections and the changes that add weeks.
PlanningHow long does a bathroom renovation takeBathroom renovation timelines: plumbing rough-in and inspection, shower water tests, tile and grout cure times, glass lead times and what adds weeks.
PlanningKitchen renovation checklistA practical kitchen renovation checklist: appliance spec sheets, cabinet layout and clearances, outlet and lighting plans, plumbing, permits and move-out prep.
PlanningBathroom renovation checklistA bathroom renovation checklist for decisions due before walls close: rough-in dimensions, shower valve type, fan sizing, waterproofing and blocking.
PlanningLiving without a kitchen during a renovationHow to live without a kitchen during a renovation: set up a temporary kitchen, plan meals, avoid tripped breakers, keep food safe and keep dust out of it.
PlanningBest time of year to renovate in TorontoWhen to renovate a kitchen or bathroom in Toronto: what each season changes for exterior vents, tile cure times, holidays, quiet hours and booking your start.
PlanningWhat happens during a kitchen renovation, week by weekA Toronto kitchen renovation from the homeowner's side: demolition, rough-ins, inspections, drywall, cabinets, template day and final walkthrough, week by week.
PlanningWhat happens during a bathroom renovation, week by weekWeek by week through a Toronto bathroom renovation: demolition, plumbing rough-in, inspections, waterproofing, flood test, tile, grout cure, glass and handover.
PlanningThe renovation design process, from measurements to drawingsHow a kitchen or bathroom design goes from site measurements to floor plans, elevations, electrical plans, shop drawings and Toronto permit drawings.
PlanningChoosing renovation finishes without delaysChoose kitchen and bathroom finishes in the order the build needs them: decide-by stages, sample approvals, tile lots, backorders and late-delivery rights.
PlanningElectrical upgrades in a kitchen renovationKitchen electrical in Ontario: ESA notifications and inspections, licensed electrical contractors, island receptacles, AFCI and GFCI rules, and panel capacity.
PlanningPlumbing upgrades during a bathroom renovationWhat to upgrade in bathroom plumbing while the walls are open: supply lines, drains, vents, shut-offs, pressure, scald control, licensed plumbers and permits.
PlanningAsbestos and lead in older homes before you renovatePre-1990 GTA homes can hide asbestos in plaster, flooring, pipe wrap and vermiculite, and lead in paint and water pipes. What to test before demolition and why.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.