Hiring a contractor
Questions to ask a renovation contractor
Ask a renovation contractor questions in five groups: what the business holds (licence, insurance, WSIB), who will actually work in your home, how the price was built and how changes are charged, who handles permits and inspections, and what happens after the last day. Ask the same questions of every firm and get the answers in writing, because the useful ones belong in your contract.
Start with the business, not the design pitch
A strong design presentation means little if the business behind it cannot stand behind the work. These questions take ten minutes and rule out more contractors than any other part of the interview.
- What is the company's full legal name, and who owns it? Ontario suggests searching both the business and its operator on the Consumer Beware List, because an operator can change business names.
- What is your City of Toronto Building Renovator licence number? (Toronto requires one for any business offering renovation services.)
- Can you email a current certificate of liability insurance, and are you registered with the WSIB or exempt under its home renovation rule?
- How many kitchens or bathrooms like mine have you finished, and may I call three of those homeowners, including one whose project is several years old?
- Who would I call if something went wrong two years from now?
Find out who will be in your home every day
The person who sells the job is often not the person who runs it. Ask for the name of the site lead, and learn which trades are employees and which are subcontractors. Ontario's guidance says the contract should list every sub-trade that will be contracted out and who pays them.
- Who is my daily contact, and how do you share updates and decisions?
- Which trades are your own staff and which are subcontracted, and will the contract name them? See subcontractors on a renovation: who does the work.
- Which licensed electrical contractor will do the wiring, what is its 7-digit ECRA/ESA number, and will it file the notification of work with the ESA?
- Who does the plumbing, and can I find them on the Skilled Trades Ontario Public Register?
- What are your site hours, and how will you protect floors, stairs and the rest of the house? The renovation dust control guide explains what good protection looks like.
Ask how the price was built
A well-prepared estimate answers most of these before you ask. Where it does not, these questions show you where the gaps are.
- Is this a fixed price, an estimate or cost-plus, and will the estimate be attached to the contract?
- Which lines are allowances, and what happens if my choices cost more or less than the allowance?
- What is excluded: permits, disposal, patching outside the room, painting, appliance hook-ups?
- How are changes priced, approved and recorded before the work is done? See renovation change orders.
- What deposit do you need, and what milestones trigger the payments after it?
- Does the total include the 13% HST?
Ask who handles permits, drawings and inspections
Ontario treats building permits as the homeowner's responsibility unless the contract hands them to the contractor. If the contractor will apply, the province advises writing that into the contract and not letting construction begin until you have seen the permit.
- Does this project need a building permit, and who will apply for it?
- Who prepares the drawings, and is that person listed in the province's QuARTS registry of qualified designers?
- Which inspections will the City carry out, and will you tell me as each one passes?
- If the walls reveal rot, old wiring or a sagging joist, how will you price and approve the extra work? Old house surprises behind the walls explains what tends to turn up.
Ask what happens after the last day
- What does your workmanship warranty cover, how long does it last, and does it start at completion or at final payment?
- Will you hand over the manufacturer warranty documents and help me register them?
- How do we record and close the deficiency list, and when is the final payment due?
- How will we handle the 10% holdback the Construction Act requires me to keep back?
- If we disagree, how will we resolve it, and can that process go into the contract? Ontario suggests settling this before you sign.
- If I cancel after work starts, what will I owe for labour and materials?
Answers that should make you pause
Most contractors answer these questions easily. A few replies deserve a follow-up question before you go any further.
| You hear | Why it matters | Ask next |
|---|---|---|
| You can pull the electrical permit yourself | The ESA lists this as a warning sign: the licensed electrical contractor files the notification | Which licensed contractor is doing the electrical work? |
| My cousin is a master electrician | The ESA says master and certified electricians cannot be hired directly for work in your home | Which licensed electrical contractor employs them? |
| Pay cash and we'll skip the tax | You lose proof of payment, and Ontario notes reputable firms charge and remit applicable taxes | Can you invoice with your HST number? |
| We need half up front for materials | Ontario recommends a down payment of no more than 10% | Can payments follow deliveries and milestones instead? |
| We'll work out the details as we go | If it is not written in the contract, you may not get it | Can those details go into the contract or a written schedule? |
| That job doesn't need a permit | It may be right for cosmetic work, but you carry the risk if it is wrong | Will you confirm that with the City, or may I? |
Questions
Should I ask every contractor the same questions?
Yes. Use one list and one written scope for every firm, and note each answer in a simple table. Differences in licensing, payment terms and warranty become obvious once the answers sit side by side.
Is it reasonable to ask for proof of insurance before a quote?
It is a normal request, and a professional firm can email a certificate quickly. Check that the insured name matches the company on the estimate and that the policy dates cover your project, then call the insurer or broker listed to confirm it is active.
What if a contractor will not put answers in writing?
Treat it as information. Ontario's consumer protection guidance is blunt: if something is not written in your contract, you may not get it. A firm that is confident in its answers usually has no trouble writing them into the estimate or contract.
Can I visit a project the contractor is working on now?
You can ask. The contractor needs the other homeowner's permission, so a polite no is normal. A refusal to provide any references at all, recent or older, is a different matter.
Sources and further reading
- Your rights when starting home renovations or repairs, Government of Ontario
- Hire a Licensed Electrical Contractor, Electrical Safety Authority
- Consumer Protection Act, 2002, S.O. 2002, c. 30, Sched. A
- Building Renovators licence, City of Toronto
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.