Renovations

Guides

Ribbed walnut floating vanity with a dark basin, illuminated mirror, vertical lights and marble-look walls

Older condos

Renovating a kitchen or bathroom in an older Toronto condo

A kitchen or bathroom in a Toronto condo built between the 1970s and the 1990s needs more investigation up front than one in a new tower. Have an electrician check for aluminum wiring, which ESA says may be present in homes built from the mid-1960s to the late 1970s; find out what the risers and valves are made of and whether the corporation plans to replace them; test textured ceilings, drywall compound and old floor tiles for asbestos before anything is disturbed; and read governing documents that may predate the current Condominium Act.

By the Purple Kitchen & Bath team · Updated · 6 min read · Photo: a Purple Properties project

What changes when the building is 30 to 50 years old

An older condo hides more of its history behind the finishes, and the surprises are predictable enough to check before design starts. The building's age shapes the wiring, the piping, the ceilings and even the paperwork, so each gets a question in the first weeks rather than a discovery during demolition.

What to check in a 1970s to 1990s Toronto condo before a kitchen or bathroom renovation
SystemWhat you may findWhat to do before design
Branch wiringAluminum wiring in buildings from the mid-1960s to late 1970s; a small suite panelAssessment by a Licensed Electrical Contractor experienced with aluminum, plus a load check for new appliances
Water supplyOriginal galvanized steel or copper piping, and valves that have not moved in decadesAsk management about riser material, repairs and any planned replacement; test the suite shut-off
DrainsOriginal branch drains and stacksAsk whether the stack has a history of backups; inspect the branch once the floor or wall is open
Ceilings and wallsTextured or stipple ceilings, older drywall joint compound and plasterAsbestos sampling before scraping, sanding, drilling or demolition
FloorsOlder floor tiles and their adhesives under newer flooringAsbestos sampling before removal
Governing documentsA declaration and rules written decades ago, amended over timeGet current copies, the standard unit by-law if any, and the renovation policy

Aluminum wiring: get it assessed before the walls open

If your building dates from the mid-1960s to the late 1970s, the Electrical Safety Authority says you may have aluminum wiring. ESA's position is that aluminum wiring is safe when proper connections and terminations are made without damaging the wire, and that only devices approved for aluminum should be used, installed under the Ontario Electrical Safety Code and the maker's instructions.

A kitchen or bathroom renovation is the right moment to deal with it, because every receptacle, switch and fixture in the room will be disconnected anyway. ESA recommends a Licensed Electrical Contractor with aluminum experience to assess, make the necessary repairs and have the work inspected by ESA, and to give you the Certificate of Acceptance. Keep it: ESA notes that some insurers will not provide or renew coverage on homes without an ESA inspection.

Ask for a load check at the same time. Older suites were not planned for an induction cooktop, a wall oven, a heated bathroom floor and a combination washer-dryer all at once, and the answer may change your appliance choices. See electrical upgrades in a kitchen renovation.

Risers, valves and drains that have been in service for decades

Old piping is the biggest unknown in an older condo bathroom, and the corporation usually knows more about it than you do. Galvanized steel pipe rusts from the inside out, building up deposits that reduce pressure and eventually lead to failure, and its life expectancy is often put at 40 to 50 years. Copper lasts longer but its valves and joints still age.

Ask management three questions before you finalize the bathroom: what the risers and suite branch lines are made of, whether there have been leaks on your stack, and whether riser replacement is in the corporation's plans. Corporations must conduct periodic reserve fund studies that look at the expected cost of major repair and replacement of the common elements, and if a riser project is coming, it is far better to time your bathroom around it than to finish new tile the building will open the following year.

While the water is off, replace what you can reach. The current Ontario Building Code requires a shut-off where the water supply enters each dwelling unit in a multi-unit residential building, but older suites may have valves that are hard to reach or no longer close fully. Replacing the suite valve and fixture stops during the renovation is the cheapest leak prevention there is. More detail is in condo plumbing: risers, shut-offs and leaks.

Asbestos: test before anyone scrapes, sands or demolishes

Health Canada says asbestos was mainly used before 1990 for insulating buildings and homes, and that older floor and ceiling tiles, drywall surface treatments such as putty and spackling compounds, and cement and plaster may contain it. Materials that are left undisturbed and in good condition pose no significant health risk; the risk comes when a renovation breaks them up. Health Canada's advice is to hire a professional to test before renovating and a qualified removal specialist if asbestos is found.

In an older condo, the materials to sample are the ones a kitchen or bathroom renovation disturbs: a textured or stipple ceiling where new lights or a bulkhead will go, drywall and joint compound coming out, and any older tile or adhesive under the existing floor. Leaving a textured ceiling in place and undisturbed is an option; drilling into it for a light fixture is not, until it has been tested.

Ontario's asbestos regulation for construction, O. Reg. 278/05, also involves the building. A building owner who knows or suspects asbestos-containing material must keep a record of where it is and give occupiers written notice of the information that relates to their area, and a contractor whose workers discover suspect material must tell the owner. Ask management whether the corporation has an asbestos record and whether it covers your suite. The regulation then sets the work procedure by quantity: removing less than one square metre of drywall with asbestos joint compound is Type 1 work, and one square metre or more is Type 2. For the wider picture, see asbestos and lead in older homes before you renovate.

Older governing documents, and the rules they still carry

An older corporation's paperwork can change who repairs and insures what, so read it before you sign a contract. Many Toronto corporations were registered before the Condominium Act, 1998 came into force on May 5, 2001, and section 89(5) carries a transition rule for them: a corporation created before that section came into force that was obliged to repair, after damage, improvements made to units before its declaration was registered keeps that obligation unless it has passed a by-law defining the standard unit. Ask management whether such a by-law exists, because the answer decides where the corporation's repair duty stops and your insurance has to start; see condo renovation insurance and liability.

Renovation rules in older buildings may also predate the products you plan to use. Induction cooktops, heated floors, smart leak valves and large-format porcelain may not be mentioned at all, which usually means management will want details rather than that anything goes. Newer law applies regardless of when the building was registered: section 117(2), in force since January 1, 2022, bars unreasonable noise that is a nuisance to others, and your flooring and working hours will be judged against it.

Older layouts: what can open up and what has to stay

Many older suites have a closed kitchen behind a wall, and opening it is often the change owners want most. Whether you can depends on what the wall is. Concrete walls and columns are structure and usually common elements, so they stay. A framed partition may be removable, but it can carry wiring, plumbing vents or ductwork that has to be rerouted, and in Toronto adding or removing walls requires a building permit, separate from the corporation's approval.

Bathrooms in older buildings tend to keep their footprint, because the drain stack and the slab fix where the toilet and tub can go. The upgrades that pay off are the ones that work within it: a tub to shower conversion over the existing drain, a continuous waterproofing membrane, better ventilation and modern fixtures with proper shut-offs.

Questions

How do I find out whether my condo has aluminum wiring?

Ask management whether the building has electrical records, then have a Licensed Electrical Contractor check the wiring at receptacles, switches and the suite panel. If aluminum is present, ESA recommends the contractor assess and repair it and have the work inspected, which gives you a Certificate of Acceptance.

Do I have to remove a textured ceiling during a kitchen renovation?

No. Health Canada says undisturbed materials in good condition pose no significant risk, so a ceiling you leave alone can stay. If the plan drills into it for lights or a bulkhead, have it tested first, and use a qualified specialist if it contains asbestos.

Who pays to replace an old riser behind my bathroom wall?

Where the declaration makes the riser a common element, the corporation maintains and repairs it. Restoring your finishes afterwards depends on the standard unit and your declaration; upgrades above the standard are usually yours to insure. Ask before you tile, especially if a riser project is planned.

Sources and further reading

  1. Electrical Safety Authority: Aluminum wiring
  2. Health Canada: Health risks of asbestos
  3. O. Reg. 278/05: Designated Substance, Asbestos on Construction Projects and in Buildings and Repair Operations
  4. Condominium Act, 1998, S.O. 1998, c. 19 (sections 89, 94, 117)
  5. City of Toronto: When do I need a building permit

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your condo renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.