Renovations

Guides

Renovation crew on a site walkthrough in a newly opened-up space

Hiring a contractor

How to choose a renovation contractor in Toronto

Choose a renovation contractor in Toronto by verifying before you compare. Confirm the City of Toronto Building Renovator licence, WSIB standing and liability insurance, and the licence numbers of the electrical and plumbing trades who will actually do the work. Call at least three references from similar jobs, collect three itemized written estimates after site visits, then sign a written contract that attaches the estimate and sets dates, a small deposit and the permit plan.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

Define the job before you call anyone

A contractor can only price what you describe, so the first step is a one-page scope. List the rooms, what stays and what goes, the finishes you have in mind, the budget you are comfortable with and the weeks that suit your household. Ontario's consumer protection guidance makes the same point: decide exactly what you want before hiring, because changing plans halfway through costs extra.

Bring that page to every consultation. Three contractors pricing three different ideas of your kitchen will give you three numbers you cannot compare. If the budget is still a guess, start with how to set a renovation budget and contingency, and for a fuller plan see how to plan a kitchen or bathroom renovation.

Seven steps from shortlist to signed contract

Work through these in order. Each step removes firms that should not reach the next one, so by the time you compare prices you are comparing only contractors you would actually let into your home.

The hiring sequence for a Toronto kitchen or bathroom renovation
StepWhat to doWhat it protects you from
1. Shortlist three to five firmsAsk neighbours who renovated a similar room, then read reviews spread over several yearsChoosing from advertising alone
2. Check licencesToronto Building Renovator licence, the 7-digit ECRA/ESA number of the electrical contractor, plumbers on the Skilled Trades Ontario registerUnlicensed work and failed inspections
3. Check coverageA current certificate of liability insurance and WSIB status (registered, or exempt under the home renovation rule)Gaps in coverage if something goes wrong on site
4. Call referencesAt least three, from jobs like yours, some recent and some a few years oldDefects that only show up after the first year
5. Collect written estimatesThree itemized estimates, each after a site visit, all pricing the same scopeLow numbers that leave out half the work
6. Interview the finalistsWho runs the site, who pulls permits, how changes are pricedSurprises after demolition
7. Sign a full written contractEstimate attached, start and finish dates, a small deposit, a 10% holdback, warranty termsDisputes over what was promised

What a Toronto renovator and its trades must hold

In Toronto, the renovation business itself needs a municipal licence. The City requires a Building Renovator licence for every business that repairs or renovates buildings, including any business that advertises renovation services, and applicants must pass a trade examination on business practice, by-laws and technical knowledge. Ask for the licence number and confirm it with the City's Municipal Licensing and Standards division. Outside Toronto, ask your own municipality whether it licenses renovators.

Licensing then follows the trades. In Ontario, only a Licensed Electrical Contractor, or an electrician employed by one, may be hired to do electrical work in your home, and that contractor files the notification of work with the Electrical Safety Authority (ESA). Plumbing is one of Ontario's 23 compulsory trades, so anyone doing it must hold a certificate of qualification, a provisional certificate or a registered training agreement. A general contractor coordinates these trades; it does not replace their licences.

If the project needs drawings for a building permit, check that whoever prepares them appears in the province's QuARTS registry of qualified designers, as ontario.ca advises. Licensed trades in Ontario: plumbers and electricians goes deeper on the trade rules, and do you need a permit for a kitchen renovation in Toronto covers permits.

Check the paperwork yourself, not from a brochure

Every credential on a contractor's website can be checked in under an hour. Ontario warns that one operator may run several businesses or change a business name, so search both the company name and the owner's name.

  • Consumer Beware List on ontario.ca: complaints and charges against businesses under Ontario's consumer laws, alongside recent convictions under the Consumer Protection Act.
  • ESA Find a Contractor tool: confirm the licence number printed on the estimate belongs to the electrical contractor named on it.
  • Skilled Trades Ontario Public Register: search a plumber by name or registration number.
  • WSIB online services: verify a clearance certificate number. Clearances last up to 90 days, so check the date.
  • The insurer or broker on the certificate of insurance: call to confirm the policy is active for your project dates.
  • Better Business Bureau, chambers of commerce and the City: any record they hold on the firm.

Compare fit and terms first, then price

Once the paperwork is clean, judge each firm on how it will run your job. Who is your daily contact? Who designs the space, and who answers for it if a drawing does not fit the room? How are changes priced and approved? What does the warranty cover, and for how long? Questions to ask a renovation contractor turns these into an interview.

Then compare money. Read the estimates line by line with how to compare renovation quotes; a low total often means a missing line rather than a better deal. Keep the deposit small, since Ontario's consumer protection office recommends no more than 10% down, and remember the Construction Act requires you to hold back 10% of each payment until lien rights expire. See renovation deposits and payment schedules for how to structure it.

Last, decide on the delivery model. A design-build firm carries design, permits and construction under one contract; a general contractor builds to drawings you bring. Design-build vs general contractor sets the two side by side.

Every guide in this hiring series

Each page below answers one question in the hiring process. Read them in this order if you are starting from scratch.

Questions

How many quotes should I get before hiring a renovation contractor?

Ontario's consumer protection guidance says to get written estimates from at least three contractors and never to accept one given over the phone or without a visit to the space. Three is usually enough to show a fair range. What matters more is that all of them price the same written scope.

Does a renovation company in Toronto need a licence?

Yes. The City of Toronto requires a Building Renovator licence for businesses that repair or renovate buildings or advertise renovation services, and applicants must pass a trade exam. Separately, electrical work must be done by a Licensed Electrical Contractor, and plumbing by someone authorized to work in that compulsory trade.

Should I simply hire the lowest bidder?

Only if its estimate covers the same scope, finishes and terms as the others. Low bids often leave out permits, disposal, electrical upgrades or realistic allowances, and those return later as extras. Ask each firm to explain the gap before deciding.

Do I need my own designer before I contact contractors?

No. A design-build firm handles design and construction together, while a general contractor builds to drawings you supply. If you already work with a designer, many builders will price and build their plans; see working with a kitchen designer and a contractor.

Sources and further reading

  1. Your rights when starting home renovations or repairs, Government of Ontario
  2. Building Renovators licence, City of Toronto
  3. Hire a Licensed Electrical Contractor, Electrical Safety Authority
  4. Work in the compulsory trades, Skilled Trades Ontario
  5. Questions and answers: Clearances, WSIB

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Hiring a renovation contractor

Every guide in this collection

HiringQuestions to ask a renovation contractorQuestions to ask a renovation contractor before hiring: licences, insurance, site crew, permits, pricing and warranty, plus replies that should worry you.
HiringHow to compare renovation quotesHow to compare renovation quotes and contractor estimates side by side: allowances, exclusions, HST, payment terms and Ontario's 10% estimate rule explained.
HiringRenovation contracts in Ontario: what to includeWhat a renovation contract in Ontario must include under the Consumer Protection Act, and the clauses that protect you: permits, changes, holdback, cooling-off.
HiringRenovation deposits and payment schedulesHow much deposit to pay a renovation contractor in Ontario, how to tie payments to milestones, and how the 10% holdback, credit cards and cash change your risk.
HiringHoldbacks on renovation projects in OntarioHow the Construction Act's 10% holdback works on a home renovation in Ontario: who keeps it, when to release it, lien timing and the 2026 rule changes.
HiringContractor insurance and WSIB coverageContractor insurance and WSIB coverage for Ontario homeowners: liability certificates, clearances, the home renovation exemption and how to check each.
HiringRenovation warranties in OntarioRenovation warranties in Ontario explained: the implied warranty in consumer law, contractor workmanship warranties, product registration and claim deadlines.
HiringDesign-build renovation explainedDesign-build renovation explained: how one firm carries design, permits and construction under one contract, the stages, what you approve and when it fits.
HiringRenovation contractor red flagsRenovation contractor red flags at every stage, from door-knock offers and phone estimates to cash deposits and missing licences, and what to do if you signed.
HiringHow to read contractor reviewsHow to read contractor reviews on Google and HomeStars: patterns that matter, signs of fake or paid reviews, owner replies, and turning reviews into references.
HiringWorking with a kitchen designer and a contractorWorking with a kitchen designer and a contractor: three ways to set up the team, who measures and orders, permit drawings, and one channel for every decision.

Plan your kitchen renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.