Renovations

Guides

Glass walk-in shower with white marble-look porcelain, twin black rain heads, two niches and a black bench

Bathroom layouts

Bathroom layout options for common room sizes

Most bathroom layouts come down to fitting three or four fixtures plus their clearances along the walls. A 5 by 8 foot room fits a 60-inch tub across one end with a toilet and a 30- to 36-inch vanity on the long wall, or a wider vanity on the opposite end. An 8 by 10 room adds a choice: a double vanity, a separate shower beside the tub, or one large walk-in shower. Ensuites from about 10 by 12 feet can add a freestanding tub or a separate toilet room.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

The clearances every layout below is built from

These are the National Kitchen & Bath Association (NKBA) planning figures. The tight column is the minimum NKBA cites from model building codes; the right column is what it recommends for daily comfort. The Ontario Building Code adds a few rules of its own that shape a house bathroom: a door on any room that contains a toilet, an exhaust air intake in every bathroom, and, above grade, a ceiling of at least 2,100 mm (about 6 ft 11 in) wherever a person would normally stand.

Fixture clearances used in the layouts on this page (NKBA)
Fixture and measurementTight minimumRecommended
Toilet centreline to wall, tub, vanity or other obstacle15 in18 in
Clear floor in front of toilet or sink21 in30 in
Sink centreline to side wall15 in20 in
Shower, inside dimensions30 x 30 in36 x 36 in
Clear floor at shower entry24 in30 in
Clear floor along a tub21 in30 in

Three ways to lay out a 5 by 8 foot bathroom

A 5 by 8 room (60 by 96 inches) fits a standard 60-inch tub wall to wall across its width. With a 30-inch-deep tub at one end, 66 inches of the long wall remain. Put the toilet centreline 18 inches from the tub, keep 18 inches beyond it, and a 30-inch vanity fits at the end; drop to the 15-inch minimums and the vanity can be 36 inches. Across the room, a 21-inch vanity leaves about 39 inches of floor in front of it.

Moving the vanity to the end wall opposite the tub changes the room. The toilet then sits alone on the long wall, with more than 20 inches to the tub and to the vanity, and the vanity can grow to 48 inches or the full 60-inch wall. The door then goes on the long wall facing the toilet, usually as a pocket door so its swing does not hit the bowl.

5 by 8 foot bathroom options
LayoutWhat goes whereTrade-off
A: one wet wallTub across the end; toilet and a 30 to 36 in vanity on one long wallAll drains in one wall, the simplest plumbing; smallest counter
B: shower instead of tubA 60 x 30 in shower in the tub's alcove, same toilet and vanitySame drain area; the house may lose its only tub
C: vanity on the end wallTub at one end, a 48 to 60 in vanity at the other, toilet betweenMore counter; the vanity drain moves to a different wall

Four plans for an 8 by 10 foot bathroom

At 96 by 120 inches, the room is wide enough for fixtures on both long walls with well over 30 inches of clear floor between a 21-inch vanity and the front of a toilet. That opens up arrangements a 5 by 8 cannot hold.

8 by 10 foot bathroom options
PlanFixturesHow it fits
Family bath60 in tub, 72 in double vanity, toilet, linen towerTub plus a 36 in tower across the 8 ft end; toilet on one long wall, vanity on the other
Tub and separate shower36 x 36 in shower, 60 in tub, 48 in vanity, toiletShower and tub fill the 8 ft end exactly (36 + 60 in); toilet 18 in from the shower, vanity beyond it
Large walk-in shower96 x 36 in shower, 72 in double vanity, toiletShower spans the whole end wall; vanity and toilet face each other
Shower plus laundry60 x 36 in shower, vanity, toilet, stacked washer-dryerThe stack takes the space a tub would; see bathroom and laundry combination layouts

What larger ensuites hold, foot by foot

Primary ensuites vary more than family bathrooms, so think in what each step up in size adds rather than in one standard plan. Ensuite bathroom renovation covers zoning the room; the footprints below show what fits.

  • About 8 by 12 feet: a 72-inch double vanity, a 60 by 36-inch walk-in shower and the toilet, with no tub. NKBA suggests a shower around 36 by 42 inches or larger lets you step out of the spray, and 60 inches deep controls splash better.
  • About 10 by 12 feet: room for a freestanding tub along one long wall beside a 48 by 36-inch shower, with the double vanity opposite. A 32-inch tub with a small wall gap and 30 inches of clear floor takes roughly 66 inches of the room's width; freestanding tub bathroom design explains the numbers.
  • About 12 by 14 feet and up: add a separate toilet room. NKBA recommends 36 by 66 inches inside such a compartment, with 30 by 60 as the minimum, and the Ontario Building Code requires it to have a door. Separate toilet rooms in a primary bathroom covers ventilation and doors.

Sloped ceilings and awkward rooms: put the sitting fixtures under the slope

The Code's 2,100 mm ceiling applies where a person would normally be standing in a bathroom above grade, so an attic or dormer bathroom can work under a sloped roof if the plan respects that. Place the tub, where you sit or lie, and the toilet under the low side; keep the shower head, the vanity and the path through the door where the ceiling is full height. A basement bathroom falls under different ceiling rules, covered in basement bathroom renovation.

Keeping the wet wall saves more than resizing

The cheapest layout change is the one that leaves the drains where they are. Swapping a tub for a shower in the same alcove, or a single vanity for a wider one on the same wall, keeps the plumbing close to the stack. Moving the toilet across the room means new drain runs, and in Toronto installing or modifying plumbing needs a building permit, while replacing a fixture in place does not. Toilet drains are 3 inches and run through floor joists, so a new location is checked against the framing before it is promised. Budget effects are in bathroom renovation cost in Toronto.

Questions

What is the smallest room that fits a full bathroom with a tub?

A 5 by 8 foot room is the practical minimum for a tub, toilet and vanity at NKBA spacing: the 60-inch tub spans the width and 66 inches of wall remain for the other two fixtures. Smaller rooms usually trade the tub for a shower.

Where should the bathroom door go?

Ideally it opens onto the vanity rather than the toilet, and its swing should clear every fixture. A pocket door frees the swing area in a tight room, and the Ontario Building Code requires a door on any room containing a toilet.

Can an 8 by 10 bathroom have both a tub and a separate shower?

Yes. A 36 by 36-inch shower beside a 60-inch tub fills the 8-foot end wall exactly, leaving the long walls for the toilet and a vanity of about 48 inches.

Does moving the toilet change the permit picture?

In Toronto, yes: relocating a toilet modifies the plumbing, which needs a building permit and inspections before walls and floors close. Replacing the toilet where it is does not.

Sources and further reading

  1. NKBA placement of bath fixtures (Supply House Times)
  2. Ontario Building Code, 9.5.3.1 ceiling heights (buildingcode.online reproduction)
  3. Ontario Building Code, 9.5.9.2 doors to rooms containing water closets (buildingcode.online reproduction)
  4. City of Toronto: When do I need a building permit?

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.