Renovations

Guides

Stainless gas range with double ovens, brass pot filler and oak-wrapped hood between sage shaker cabinets

Kitchen cabinets

Cabinet refacing vs replacing

Refacing keeps your existing cabinet boxes and replaces the doors, drawer fronts, hinges and hardware, then covers the visible frames and end panels to match. It costs a fraction of new cabinets and is usually done in under a week, but the layout, box sizes and any hidden damage stay exactly as they are. Replace the cabinets when you want a different layout, more drawers, new appliance sizes, or when the boxes are swollen, sagging or out of level.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

What refacing changes and what it leaves alone

Refacing is a new face on an old frame. Home Depot Canada, which sells refacing as an installed service, describes a typical job as brand new doors, cabinet boxes updated with engineered materials to match the new doors, new hinges and new hardware. The exposed parts of the boxes, meaning the face frames and the finished ends, are covered so they read as one new finish.

Everything behind the doors stays: the box sizes, shelves, drawer boxes unless you pay to replace them, the plumbing and wiring, and in most cases the countertop. On traditional face-frame cabinets there is a frame to cover; on frameless, European-style boxes the job is mostly new doors, drawer fronts and end panels, because there is no frame in front of the box.

Replacing means the old cabinets come out entirely. It opens the walls and floor behind them, allows a new layout, and almost always brings new counters and backsplash with it.

Refacing and replacement compared

The two options solve different problems. Refacing fixes how the kitchen looks; replacement fixes how it works.

Cabinet refacing and full replacement side by side
RefacingReplacing
What changesDoors, drawer fronts, hinges, pulls, visible frames and end panelsBoxes, interiors, doors, usually counters and backsplash
LayoutStays exactly as it isCan be redrawn from scratch
Typical cost$5,000 to $12,000 depending on size and scope (Home Depot Canada)Set by cabinet level and linear footage; see the custom cabinet cost guide
Time the kitchen is out of useUsually under a week for refacing alonePart of a full renovation, most of which take 6 to 16+ weeks in the GTA
CountertopsUsually kept; new tops are an extraUsually replaced
Hidden problems behind the boxesStay hiddenExposed and fixed
New appliance sizes or panel-ready appliancesOnly like-for-like swapsOpenings sized for any appliance
Material sent to landfillOld doors and drawer frontsEvery box, door and counter

When the boxes rule refacing out

Refacing only makes sense on boxes worth keeping. Before you price new doors, open every cabinet and check these points, because a new face on a failing box is money spent twice.

  • The sink base: swollen, crumbling or stained panels from past leaks mean the box should be replaced, not covered. Swollen particleboard does not shrink back.
  • Sagging shelves and racked boxes: if doors never closed square, new doors will not either.
  • Level and plumb: run a level along the countertop and the base fronts. Floors that have settled in older Toronto houses can leave runs that refacing cannot correct.
  • Appliance plans: a wider fridge, a 36-inch range, a built-in microwave or panel-ready dishwasher needs openings the old layout may not have.
  • Layout complaints: a refaced kitchen keeps the same work zones, the same blind corners and the same number of drawers. If the layout is the problem, refacing is the wrong fix.
  • Ceiling height: uppers that stop well short of the ceiling stay that way; extending them is closer to replacement than refacing.

What refacing costs, and what pushes it up

Home Depot Canada puts cabinet refacing at $5,000 to $12,000 depending on the size and scope of the kitchen, and quotes a national average of $6,500 for new doors, boxes updated to match, new hinges, hardware and labour, before taxes. Quality wood veneer and high-end hardware raise the price, and new countertops are charged separately.

Those figures are for refacing on its own. Many homeowners pair it with a new counter, sink and faucet, a new backsplash and under-cabinet lighting, which narrows the gap to a partial renovation. Your own estimate depends on the number of doors and drawers, the finish you choose and the condition of the boxes. Detailed ranges from several sources are on kitchen cabinet refacing cost, and new-cabinet pricing by level is on custom kitchen cabinet cost.

The middle options between refacing and a full tear-out

The choice is not strictly one or the other. Three in-between routes are worth pricing.

Painting the existing doors is the cheapest refresh, but finishes brushed or sprayed in a kitchen wear faster than factory coatings; the trade-offs are on painted kitchen cabinets.

Refacing the perimeter and replacing the island keeps sound wall cabinets while giving you a new island with seating, drawers or a sink, built to current sizes.

Replacing selected boxes such as the sink base or a corner unit, then refacing the whole run so everything matches, fixes a single damaged area without a full tear-out. Ask the refacer whether replacement boxes can be built to match the existing depth and height.

Refacing or replacing: the verdict

Use the condition of the boxes and your satisfaction with the layout as the two deciding tests.

  • Choose refacing if the boxes are dry, solid and level, the layout already works for how you cook, you are keeping your appliances, and the goal is a new look in days rather than weeks.
  • Choose replacement if you want to move the sink, range or fridge, add an island or pantry, gain drawers, take uppers to the ceiling, fit integrated appliances, or the boxes show water damage or sag.
  • Price both if you are unsure: a refacing quote plus new counters, lighting and backsplash sometimes lands close enough to a replacement to tip the decision.

Questions

Can I get new countertops when I reface?

Yes. New counters are usually quoted as an extra on a refacing job. Have the boxes checked for level first, because stone and quartz are templated on the cabinets underneath them and will show any dip in the run.

Do refaced cabinets get soft-close hinges and drawers?

New hinges are normally part of refacing, and soft-close hinges are a common choice. Soft-close drawers are different: they need new drawer glides and often new drawer boxes, so ask whether those are included or priced separately.

Can frameless European-style cabinets be refaced?

Yes. With no face frame to cover, refacing a frameless kitchen is mainly new doors, drawer fronts and finished end panels, plus new hinges. The box edges must be in good condition, since they show between the doors.

Is it worth refacing cabinets before selling a house?

It can be, if the boxes and layout are sound and the doors are what makes the kitchen look dated, because refacing changes the look quickly without opening walls. If the kitchen has water damage or a layout buyers will want to change, refacing only covers the problem.

Sources and further reading

  1. Home Depot Canada: Cabinet refacing services
  2. Home Depot Canada: How to reface kitchen cabinets
  3. Wikipedia: Kitchen cabinet (face-frame and frameless construction)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your kitchen renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.