
Toronto house types
Kitchen renovation in a semi-detached Toronto house
A kitchen renovation in a semi-detached Toronto house is planned around the house first: a narrow lot, one shared party wall that must keep its fire rating, a kitchen at the back of a long main floor, joists that limit where pipes can run, and wiring and water lines that may be decades old. Measure the clear width before choosing a layout, keep anything you add to the party wall on its own furred-out layer, and budget for service upgrades before finishes.
What a semi changes about a kitchen plan
The house sets the limits before the design does. Toronto's older semis sit on narrow, deep lots: Wikipedia's summary of the city's bay-and-gable houses, built mostly from the 1860s to the 1890s and often as semi-detached pairs, puts typical lot widths at 12 to 25 feet and the average lot at about 18 by 129 feet. After the side path and the walls, the kitchen is narrower still, so measure plaster to plaster first.
| Feature | Effect on the kitchen | What to plan |
|---|---|---|
| Narrow lot, long main floor | Width, not length, decides the layout | A layout chosen from the clear width |
| Shared party wall | No windows on that side; a fire separation | Cabinets and services on a new layer in front of it |
| Side wall near the lot line | New windows may be restricted | Check the limiting distance before promising light |
| Kitchen at the back | Gas, drains and the hood duct travel far | Keep the sink near the existing stack where possible |
| Older services | Wiring and water service may predate modern loads | Electrical and plumbing scope priced before cabinets |
Which layout fits the width you have
Work out the clear width, then pick the layout that fits it with real aisles. The figures use 25 inches for a base cabinet with its counter, 12 inches for a shallow pantry run at wall-cabinet depth, and the National Kitchen & Bath Association (NKBA) clearances: a 42-inch work aisle for one cook, 48 inches for two and 36 inches for a walkway.
In many semis the kitchen is also the route from the dining room to the back door. If traffic passes through the work aisle, use the 48-inch figure even for one cook, or move the door. The shapes are compared in kitchen layout options and two-run kitchens in galley kitchen renovation.
| Layout | Arithmetic | Clear width |
|---|---|---|
| One wall, work aisle in front | 25 + 42 in | 67 in (5 ft 7 in) |
| One wall plus a 12-inch pantry run opposite | 25 + 42 + 12 in | 79 in (6 ft 7 in) |
| Galley, one cook | 25 + 42 + 25 in | 92 in (7 ft 8 in) |
| Galley, two cooks or through traffic | 25 + 48 + 25 in | 98 in (8 ft 2 in) |
| One wall, work island, walkway beyond | 25 + 42 + 25 + 36 in | 128 in (10 ft 8 in) |
The party wall: build in front of it, not into it
Treat the shared wall as something the kitchen leans on, never something it cuts into. Under the 2024 Ontario Building Code, a party wall on a property line is normally a firewall; where it separates two side-by-side dwelling units with no unit above another, Article 9.10.11.2 allows a fire separation with at least a 1-hour fire-resistance rating instead, continuous from the top of the footings to the underside of the roof deck. Slots for pipes, recessed outlet boxes and holes for a hood duct all weaken it.
The practical answer is a strapped or furred-out layer in front of the party wall: services run in the new cavity, cabinets fasten to it and the original wall stays whole. If you insulate that layer, the Code's target for walls between dwelling units, a sound transmission class (STC) of 50 or an apparent STC of 47 under 9.11.1.1, is a useful benchmark. The layer costs a few inches, so use the width measured after it in the layout table above.
- Tell your neighbour before demolition: drilling and hammering on a shared wall carries straight through to their side.
- Plan solid blocking in the new layer for wall cabinets loaded with dishes, rather than anchors in old plaster.
Joists decide where the sink can move
Find out which way the floor joists run before you move the sink, because a drain that runs along the joists is easy and one that crosses them is not. From the basement, the joist direction also tells you which walls carry the floor above, which matters if you plan to open the kitchen to the dining room; see removing a load-bearing wall for an open kitchen.
The Building Code limits what can be cut. Under 9.23.5.1, a hole through a floor joist can be no larger than a quarter of its depth and must stay at least 50 mm from the edges; under 9.23.5.2, a notch must sit on the top edge, within half the joist depth of the bearing, and be no deeper than a third of the joist. In a modern 2x8, about 184 mm deep, the largest permitted hole is about 46 mm, smaller than the outside of a 1 1/2-inch plastic drain pipe (about 48 mm). Older, rough-sawn joists are often deeper, but the rule scales with their depth.
So a sink that moves across the joists usually means a drain run below them, boxed into the basement ceiling, or a layout that keeps the sink near the stack.
Windows and light on a wall close to the neighbour
A new window in the side of a semi is often not allowed, so check before you design around one. The Building Code limits openings by the wall's limiting distance, usually measured to the lot line. Under Table 9.10.15.4, a wall less than 1.2 m (about 4 feet) from the line can have 0 per cent glazed openings, and at 1.2 m only about 7 to 8 per cent; openings of 130 square centimetres or less are exempt. The Code's appendix confirms this applies to semi-detached houses.
In Toronto, a new window or door where there was none, or an enlarged or moved opening, needs a building permit; replacing a window in the same opening in a semi does not. When the side wall cannot take glass, light comes from the back: a wider rear opening or patio door, glass uppers on a yard-facing wall, and good electric light, covered in kitchen lighting design.
Old wiring and water lines in a Toronto semi
Assume the services need work until the walls prove otherwise. Knob-and-tube wiring was common in North America from the 1880s into the 1940s; it has no ground conductor, usually too few circuits for a modern kitchen, and must not be buried in blown-in or foam insulation. Some insurers decline coverage until it is replaced or certified.
In Ontario, electrical work done for hire must be carried out by a Licensed Electrical Contractor, who files a notification with the Electrical Safety Authority (ESA), separate from the City building permit. The City of Toronto also notes that houses built before the mid-1950s may still have a lead water service pipe, so check the pipe at your water meter while the plumbing is open. Circuits and panel capacity are covered in electrical upgrades in a kitchen renovation.
When the kitchen needs a rear addition
If the clear width is simply too narrow, the space usually comes from the back of the lot, and that is a bigger project. Toronto requires a building permit for an addition, and the plans go through zoning review first; if the addition cannot meet the zoning by-law, the owner can apply to the Committee of Adjustment for a minor variance, which adds time. Other GTA municipalities run their own processes, so confirm the steps with your city.
Questions
Can I move my kitchen from the back of a semi to the middle of the house?
Often, but the drain decides it. A sink far from the existing stack usually needs a drain run below the joists and boxed into the basement ceiling, and a vented hood needs its own route outside. Plan both before the design is final.
Do I need my neighbour's permission to renovate beside the party wall?
Building on a new layer in front of the wall leaves the shared wall itself untouched, which keeps the question simple; still tell them before demolition, because noise carries through. Anything that would cut into or through the shared wall raises fire-separation and shared-ownership questions, so get advice first.
Can I put a window in the side wall of my semi?
Only if the wall is far enough from the lot line. A wall less than 1.2 m from the line can have no glazed openings under the Building Code, and at 1.2 m only about 7 to 8 per cent. A new opening also needs a Toronto building permit.
Does knob-and-tube wiring mean rewiring the whole house?
Not necessarily, but the kitchen circuits should be new and your insurer may ask about the rest. A Licensed Electrical Contractor can tell you what is still live while the kitchen walls are open.
Sources and further reading
- 2024 Ontario Building Code compendium, Part 9: Housing and Small Buildings
- City of Toronto: When do I need a building permit
- City of Toronto: Plan review process (zoning review and minor variances)
- Wikipedia: Bay-and-gable (Toronto lot widths and dates)
- Electrical Safety Authority: Hiring a Licensed Electrical Contractor
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





