Renovations

Guides

Bright ensuite with a white freestanding tub, hexagon mosaic floor and a glass shower beside the bedroom door

Luxury bathrooms

Luxury bathroom renovations in Toronto

A luxury bathroom in Toronto is set apart less by price than by five upgrades that change how the room is built: slab or large-panel walls with few grout lines, a steam shower, heated floors, custom frameless glass and layered lighting. Each one adds a trade, structural or electrical work, and lead time. RenovationFind's 2026 Toronto guide puts large ensuite or luxury bathrooms at $30,000 to $45,000 or more, against $15,000 to $22,000 for a basic renovation that keeps the existing layout.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

Slab and large-panel walls trade grout lines for planning

Porcelain panels and quartz or stone slabs can cover a shower wall in one or two pieces, so veining runs unbroken and there are far fewer grout joints to scrub. The catch is everything around the install: walls must be flat and plumb, cut-outs for the valve, niche and shower head are measured to the millimetre, and each piece has to travel from the truck to the bathroom. Measure the stairwell turns, hallway corners and, in a condo, the service elevator before choosing panel sizes.

A slab is still a finish, not the waterproofing. The Ontario Building Code requires moisture-resistant backing behind tile around tubs and showers and a waterproof finish at least 1.8 m up the walls of a shower stall, and a bonded membrane goes on before the panels. Natural marble brings its own care routine because it etches with acids and needs sealing; marble bathrooms covers that trade-off.

A steam shower is a sealed room, not a shower with a generator

Steam only works in an enclosure that holds it. Delta's planning guidance suggests a low ceiling, about 7 feet and no more than 8, and if the ceiling is sloped to shed condensation, at least 1 inch of slope per foot. The glass is sealed on both sides and across the top, often with an operable transom, and every wall and ceiling surface gets waterproofing and vapour control rather than ordinary shower backing.

The generator needs its own water line and a dedicated power line, and Delta notes it can sit up to 70 feet from the control in a dry, non-freezing space such as a vanity or closet, where it can be serviced. NKBA adds a separate ceiling fan near the transom to clear the steam afterward. The full sequence is on the steam shower installation page.

Heated floors and custom glass are the comfort and the clarity

Electric floor heating is laid as cable or mat in a thin layer under the tile, runs on its own thermostat and, per NKBA guidance, gets GFCI protection like every other bathroom circuit. It has to be decided before the floor goes down; see heated bathroom floors.

Custom glass is measured after the tile is finished, from tile face to tile face, so it is one of the last items on the schedule. The Ontario Building Code requires shower and bathtub enclosures to use Class A safety glazing under CAN/CGSB-12.1. Frameless panels are commonly 3/8-inch tempered glass, with 1/2-inch or a header brace considered for wide or tall panels. Low-iron glass reduces the green cast visible along the edge of ordinary clear glass, which matters next to white marble or pale porcelain. For a steam shower the glass runs to the ceiling.

Lighting is what makes slab and brass look expensive

NKBA's planning guidelines give lighting real numbers. Wall sconces on each side of the mirror sit around 60 inches off the floor, adjusted to eye level. A mirror with built-in lighting should be dimmable and deliver at least 50 footcandles (538 lux) to the face. A light goes over the front edge of the toilet, and a hard-wired, motion-activated night light below eye level handles late trips.

The rule that catches luxury plans: NKBA keeps decorative fixtures such as chandeliers and pendants at least 36 inches horizontally from the edge of a bathtub and 96 inches above its rim, and out of the shower entirely. Anything over the tub or inside the shower must be rated for damp locations.

What each luxury upgrade adds to the build
UpgradeExtra work it bringsDecide by
Slab or large porcelain panelsFlat, plumb walls; precise cut-outs; delivery routeDesign, before framing is finished
Steam showerSealed glass to ceiling, vapour control, generator, dedicated powerDesign, before plumbing and electrical rough-in
Heated floorHeating cable or mat, thermostat, GFCI protectionBefore the floor is tiled
Custom frameless glassClass A safety glazing, measured after tileOrder once tile is complete
Layered lightingSconces, lit mirror, toilet light, night light, damp-rated fixturesBefore drywall

Two Toronto bathrooms that show the difference

In a downtown condo, the penthouse bathroom renovation rebuilt two bathrooms from the ground up with floating vanities, large-format porcelain, and a glass walk-in shower with a bench and black fixtures beside floor-to-ceiling windows. Condo work like this is also shaped by the building's rules and timelines, which set when trades can work and how materials come in.

In High Park, the herringbone bathroom renovation combines a polished herringbone floor with slab surfaces, brushed gold fixtures, a navy double vanity and a backlit mirror. Neither room relies on one showpiece; the finish level comes from many decisions made early.

How Purple Kitchen & Bath builds a high-end bathroom

A luxury bathroom has more selections and more trades to sequence, which is where one team handling design, selections, permits and construction pays off. Projects start with a complimentary consultation with Rowan Henry and the design team, who can also work alongside your own designer. Purple Kitchen & Bath is a licensed general contractor, fully insured, with more than 250 five-star homeowner reviews and HomeStars Best of the Best badges for 2022, 2023 and 2024. Every renovation carries a one-year workmanship warranty, and the team helps you register the manufacturer warranties on items like a steam generator or heated-floor system. See more finished rooms in the bathroom renovation gallery.

Questions

Does a steam shower need an electrical upgrade?

It needs a dedicated power line, and the steam room should not be so large that the generator's power draw exceeds what the home's electrical service can supply. Generator size depends on the room's volume and wall materials, so an electrician checks panel capacity during design, not after the tile is up.

Porcelain panels or natural stone slab for shower walls?

Porcelain panels are non-porous and need no sealing, which makes them easy to live with in a shower. Natural stone such as marble gives one-of-a-kind veining but is porous, needs periodic sealing and can etch. Spa bathroom design at home covers how the materials combine.

Can a chandelier hang over a freestanding tub?

Under NKBA's guidelines, a decorative fixture stays at least 36 inches horizontally from the tub's edge and 96 inches above its rim, which usually rules out a low chandelier over the bath. In a tall room it can work at the right height, and any fixture above a tub should be rated for damp locations.

How long does a luxury bathroom renovation take?

Most GTA renovations take 6 to 16 weeks or more depending on scope, complexity and change orders. Slab fabrication and custom glass, which is only measured once tile is finished, add steps to the schedule, so selections are best finalized before demolition.

Sources and further reading

  1. RenovationFind: Bathroom Renovation Cost in Toronto (2026 Guide)
  2. NKBA Kitchen & Bath Planning Guidelines, 4th edition (summary)
  3. Delta Faucet: How to build a steam shower

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.