Renovations

Guides

Powder room with an oak vanity, brass faucet, ten-sided mirror, glass pendants and patterned floor tile

Powder room costs

Powder room renovation cost

A powder room renovation in Toronto typically costs $8,500 to $14,500 in 2026, according to HomeStars, for a two-piece room with a new toilet, vanity, flooring, lighting and wall finishes. A lighter refresh that keeps the existing toilet and drains costs less, while building a new powder room where none exists runs $8,000 to $25,000. What moves the figure most is whether any plumbing moves and how far you take the finishes.

By the Purple Kitchen & Bath team · Updated · 3 min read · Photo: a Purple Properties project

Why a two-piece room still costs five figures

A powder room is small, but it needs most of the trades a full bathroom does: removal of the old fixtures, a plumber, an electrician, a flooring or tile installer, and a painter or paperhanger. Each visit carries a minimum cost however few square feet are involved, and the work has to happen in sequence.

What a small room does change is the cost of finishes. A 4 x 5 ft powder room has 20 sq ft of floor, so even marble, at $20 to $45 per sq ft installed in Toronto (HomeStars), comes to roughly $400 to $900. Premium choices cost far less here than in any other room in the house.

Finish-by-finish price list

These are the material and fixture ranges HomeStars publishes for powder rooms, with its Toronto installation figures where they apply. They show which choices move your total and which barely register.

Powder room finish and fixture costs, 2026. Sources: HomeStars, Powder Room Costs, and HomeStars, Bathroom Renovation Costs in Toronto (both updated August 2026).
ItemPrice rangeWhat moves it
Vanity and sink$1,000 to $5,000Brand and size
Faucet and fixtures$200 to $1,500Style and finish
Toilet, fixture only$200 to $800Model and style
Toilet installation, Toronto$800 to $1,200Labour and basic connection
Mirror and lighting$500 to $2,000Number and type of fixtures
Paint and finishes$1,000 to $2,500Room size and paint quality
Wallpaper hanging, GTA$800 to $1,200, labour onlyPaper type and pattern matching
Floor tile, material$5 to $35 per sq ftMaterial and quality

Refresh, renovation, addition or conversion

Four different projects go by the name powder room renovation, and they sit in different price bands:

  • Refresh. New paint or wallpaper, vanity, faucet, mirror and light, with the toilet and drains left alone. HomeStars puts the average powder room project in Canada at about $5,000, a fair marker for this kind of lighter job.
  • Full renovation. New floor, toilet, vanity, lighting and wall finishes: $8,500 to $14,500 in Toronto (HomeStars, 2026).
  • Adding a powder room. Building one inside existing space runs $8,000 to $25,000 (HomeStars), because it needs a new drain, vent and supply, wiring and usually a building permit, with Toronto's 2026 minimum permit fee at $214.79. The guide to adding a powder room on the main floor covers where one fits. The family kitchen renovation in North Toronto added a new powder room alongside the kitchen work.
  • Converting to a full bathroom. Adding a shower makes it a different project: $15,000 to $35,000 or more (HomeStars).

Where powder room money goes furthest

Guests see the powder room more than any other bathroom, and its surfaces are small, so it is where a bold finish costs the fewest dollars.

  • A feature wall. Hanging wallpaper costs $800 to $1,200 in the GTA (HomeStars). The wallpapered bathrooms in Toronto pair bold patterned paper with deep blue tile; where bathroom wallpaper works covers paper types for humid rooms.
  • A floating vanity and a wall-hung toilet. Both show more floor and make a tight room feel larger, but a wall-hung toilet needs an in-wall carrier framed into the wall, which adds plumbing and carpentry; see wall-hung toilets with in-wall carriers.
  • Lighting. A backlit mirror or a pair of sconces flanking the mirror lights a face evenly, which a single ceiling fixture cannot.
  • The toilet where it is. HomeStars puts moving a toilet at $2,500 to $4,000, money better spent on the vanity, the lighting or a feature wall.

Questions

Is adding a powder room worth it at resale?

HomeStars cites Canadian real estate estimates that a powder room addition returns about 70% to 90% of its cost. Plan it first for daily use and guests, and treat the resale return as a bonus.

What would it cost to add a shower to my powder room later?

HomeStars puts converting a powder room into a full bathroom at $15,000 to $35,000 or more, with the shower and glass enclosure alone at $5,000 to $10,000 or more. If a future shower is likely, ask whether a drain can be roughed in during the current work.

Is it cheaper to renovate the powder room at the same time as the kitchen?

Often, yes. The plumber, electrician and finishers are already on site, and one design and permit process can cover both rooms. Doing them separately means paying for each trade to come back.

Sources and further reading

  1. HomeStars: How Much Do Renovations Cost in Toronto in 2026?
  2. HomeStars: Powder Room Costs, Additions, Conversions and Design Upgrades
  3. HomeStars: Bathroom Renovation Costs in Toronto
  4. City of Toronto: Building Permit Fees (2026)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.