
Bathroom costs
Small bathroom renovation cost
A small bathroom of about 5 x 7 ft typically costs $9,000 to $22,000 to renovate in Toronto in 2026, according to HomeStars, before 13% HST. Per square foot it is the dearest room in the house to renovate, because the plumber, electrician and tile setter each charge for a visit however few square feet they cover. Keeping the toilet, tub and vanity drains where they are holds a small room near the bottom of that range; your estimate depends on what sits behind the walls.
Why a small bathroom costs more per square foot than a large one
Divide HomeStars' 2026 Toronto ranges by floor area and the smallest room comes out three to four times dearer per square foot than a large ensuite. The reason is fixed cost: demolition, a toilet, a vanity, a shower valve, an exhaust fan and the trades who install them arrive whether the room is 35 or 196 sq ft.
Minimum charges add to the effect. Builders Ontario, which publishes Central Ontario prices, bills tile work and electric heated floors at a $900 minimum each, so its 5 x 8 ft bathroom floor tile, which works out to $793, is billed at $900.
| Room | Floor area | HomeStars range | Per sq ft of floor |
|---|---|---|---|
| Small, 5 x 7 ft | 35 sq ft | $9,000 to $22,000 | About $257 to $629 |
| Average, 10 x 10 ft | 100 sq ft | $12,000 to $30,000 | About $120 to $300 |
| Large ensuite, 14 x 14 ft | 196 sq ft | $14,000 to $40,000 | About $71 to $204 |
What each piece of a 5 x 8 ft hall bathroom costs
A typical small main bathroom holds a 60 in. tub with a tiled surround, a toilet and a single vanity. Builders Ontario's October 2026 price sheets cover most of its parts at Simcoe County and Central Ontario prices; the same guides put GTA trades 15% to 25% higher, so read them as a floor for a Toronto quote.
The surround figure is arithmetic: three walls of a 60 x 30 in. alcove, tiled from the tub rim to an 8 ft ceiling, come to about 68 sq ft. HomeStars' Toronto figures add $2,500 to $5,000 to install a bathtub and $800 to $1,200 for a toilet.
| Item | Small-room figure | What it assumes |
|---|---|---|
| 36 in. mid-grade vanity with quartz top | $3,000 to $3,800 | Installed in the same spot, plumbing reconnected |
| Builder-grade vanity with moulded top | About $1,500 to $2,000 | Prefabricated cabinet and sink, same spot |
| Floor tile, 40 sq ft | $900 minimum charge | 12 x 24 in. tile and membrane over plywood |
| Tub surround tile labour | About $1,020 | About 68 sq ft of wall at $15 per sq ft; tile extra |
| Electric heated floor, about 24 heated sq ft | $900 minimum charge | Mat, thermostat and electrician |
| Vanity drain or supply moved a few inches | $650 to $1,800+ | Same wall, short move |
| Fixture moved to a new wall | From about $1,800 | New drain run; may need a permit |
Three scopes of small bathroom work, three price points
Small bathroom projects split by how much of the room comes out.
- Surface refresh. New vanity, toilet, mirror, light fixture and paint, with the tub and wall tile kept. At Builders Ontario's builder-grade vanity price and HomeStars' toilet installation figure, the two largest lines come to roughly $2,300 to $3,200, before the toilet itself, paint, lighting and the mirror.
- Full renovation in the same layout. Everything back to the studs: new waterproofing, tub, tile, vanity, toilet, fan and lighting, with every drain left where it was. This is the work HomeStars' $9,000 to $22,000 range describes.
- Layout change. Replacing the tub with a shower or moving the toilet adds plumbing and often a permit. RenoQuotes puts a Canadian bathtub-to-shower replacement at $5,000 to $12,000 on its own; see tub to shower conversion cost.
Where small bathrooms in older GTA houses hide extra cost
In a small bathroom, the surprises are usually under the floor or inside the wet wall, and they can cost as much as the finishes. Condo bathrooms have different constraints, covered in condo bathroom renovation cost.
- Soft subfloor at the toilet. A slow leak at the toilet seal rots the plywood. Builders Ontario prices replacing damaged sheathing at about $6 per sq ft of the area replaced, on top of the tile that has to come up with it.
- Floors out of level. Older joists sag, and tile needs a flat base. Self-levelling compound at an average depth of 1/4 in. runs about $3 per sq ft in the same guide.
- Old supply and drain lines. Galvanized steel supplies and cast-iron drains turn up in older Toronto houses, and replacing exposed runs while the walls are open costs less than reopening new tile later; see plumbing upgrades during a bathroom renovation.
- The shower valve. Builders Ontario cites Article 7.2.10.7 of the Ontario Building Code: a new shower or tub needs an automatic compensating valve with the outlet capped at 49°C, so an old two-handle valve is replaced, not reused. Confirm current rules with your municipality.
Premium tile costs little in a small room; the vanity costs more
A tiny floor makes tile upgrades cheap. Over a straight 12 x 24 in. lay, Builders Ontario adds about $3 per sq ft for large-format tile, $4 for herringbone and $5 for mosaic, roughly $120 to $200 across a 40 sq ft floor.
The vanity moves faster. The same guides price a 36 in. cabinet alone at $1,100 mid-grade and $3,200 luxury before its top, and a floating cabinet adds about 15% plus about $300 for wall blocking. Going from mid-grade to luxury costs more than a heated floor and a herringbone floor together. For layouts that make the most of a tight room, see small bathroom renovation ideas.
Questions
Is a heated floor worth adding to a small bathroom?
In a small room the cost is usually the installer's minimum: Builders Ontario bills a 5 x 8 ft bathroom, with about 24 heated sq ft, at $900. It then costs a few cents an hour to run; see heated bathroom floor cost.
Does a small bathroom renovation need a permit in Toronto?
Replacing fixtures in the same spot usually does not; adding or moving fixtures and drains does, according to Builders Ontario, and rules vary by municipality. See do you need a permit for a bathroom renovation in Toronto.
How long does a small bathroom renovation take?
Purple Kitchen & Bath puts most GTA renovations at 6 to 16+ weeks, depending on scope, complexity and change orders. Plumbing moves, inspections and custom glass or vanities lengthen a small job; how long a bathroom renovation takes breaks down the stages.
Sources and further reading
- HomeStars: Bathroom Renovation Costs in Toronto
- Builders Ontario: Bathroom Vanity Cost in Ontario (2026)
- Builders Ontario: Tile Installation Cost in Ontario (2026)
- Builders Ontario: Bathroom Plumbing Rough-In Cost (2026)
- Builders Ontario: Subfloor Levelling Cost in Ontario (2026)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





