
Renovation living
Living without a kitchen during a renovation
Set up a temporary kitchen in another room before demolition: the old fridge if it can move, a microwave, a kettle and one or two countertop cookers spread across different circuits, plus a laundry tub or other sink for dishes. Cook and freeze meals ahead, keep food sealed away from construction dust, and expect the setup to last most of the build, because the sink and dishwasher only come back once the countertops are installed.
Expect to be without a kitchen for most of the build
By Purple Kitchen & Bath's own estimate, most GTA renovations take 6 to 16+ weeks, and in a kitchen renovation the room is out of service from demolition until the counters are in and the sink, dishwasher and appliances are reconnected. That last step comes later than people assume: stone is templated only after the cabinets are installed and levelled, and fabricators commonly need 5 to 14 days after the template is approved. The full breakdown is in how long does a kitchen renovation take.
| Stage of the work | What you can use |
|---|---|
| Demolition through drywall | Nothing in the kitchen; temporary kitchen only |
| Cabinets installed | Still no sink or dishwasher, because the counters aren't in |
| Countertops installed | Sink and dishwasher reconnected; the fridge can come back |
| Backsplash, appliances and finishing | Mostly usable, with trades still coming and going |
Where to set up the temporary kitchen
Pick a spot close to water, away from the work zone and off the path the trades use. A basement with a laundry tub works well: the tub is deep enough for pots and the room is usually clear of the worst dust. A dining room with folding tables works if a bathroom is close by for filling jugs, but a bathroom vanity is a poor place to wash dishes.
- Out of the doorway the trades use to carry materials.
- Close to receptacles on at least two different circuits.
- Counter-height surfaces: folding tables, a plywood top on sawhorses, or an old base cabinet kept back for the purpose.
- Food and dishes in lidded plastic bins rather than on open shelves.
- In a condo, a corner of the living room; see renovating a condo while living in it.
What to put in it, and how to avoid tripping breakers
A standard 15-amp, 120-volt household circuit supplies about 1,800 watts in total. A kettle or toaster oven can use well over half of that on its own, so two heating appliances on one circuit is the usual reason a breaker trips in a temporary kitchen. Check the wattage on each label, plug heaters straight into the wall rather than through a power bar, and spread them across different circuits.
| Appliance | Good for | Watch for |
|---|---|---|
| Refrigerator (the old one, or a bar fridge) | Fresh food, milk, leftovers | Keep it at 4°C or colder after the move |
| Microwave | Reheating frozen meals | Shares a circuit badly with a kettle |
| Induction hot plate | Pasta, eggs, stir-fries | Needs magnetic cookware |
| Slow cooker or multicooker | One-pot meals ready when you get home | Long run times; give it a stable, clear surface |
| Toaster oven or air fryer | Small roasts, vegetables, toast | High draw; run it alone on its circuit |
| Electric kettle | Drinks, oatmeal, hot water for washing up | High draw for a few minutes at a time |
| Outdoor barbecue | Grilling in any season | Outdoors only, never in a garage or indoors |
Plan meals around no sink and a small fridge
The hard part isn't cooking, it's cleaning up without a sink. Plan meals that need one pot or none, and do the heavy cooking while you still have a kitchen. Health Canada's food storage guidance supplies the temperatures to work to.
- Batch-cook and freeze two or three weeks of dinners before demolition, in a freezer at -18°C or colder.
- Keep the fridge at 4°C or colder; a fridge thermometer is worth having after a move.
- Refrigerate leftovers within two hours, and reheat them to at least 74°C.
- Shop smaller and more often, because a bar fridge fills fast.
- Set up a washing station: two tubs (wash and rinse), a drying rack and a small bin for scraps.
- Use reusable plates on easy days and disposables on the busiest ones.
- Budget for takeout on the noisiest, dustiest days.
Keep construction dust away from food and dishes
Dust is the other enemy of a temporary kitchen. Health Canada recommends sealing off a work area to limit how far dust and fumes travel, cleaning hard surfaces with a damp cloth or mop, and using a vacuum with a HEPA filter. It also says a home built before 1960 probably contains lead-based paint, which makes keeping demolition dust away from food more important in older Toronto houses. See renovation dust control and asbestos and lead in older homes.
- Keep the temporary kitchen on the far side of the dust barrier.
- Store food, dishes and utensils in lidded bins.
- Wipe surfaces before you prepare food, not only after.
- Ask whether furnace returns near the work area will be covered, and change the furnace filter after the dustiest phases.
Make the routine work for kids, pets and long weeks
A few habits make the weeks easier: a snack shelf children can reach without crossing the work zone, pet food and water moved well away from the trades' door, and a fixed time each week to check the schedule, so a longer stretch without a sink is never a surprise. If someone at home is very young or has breathing problems, staying elsewhere for the demolition days may be worth it. More in renovating with kids and pets at home and preparing your home for renovation day one.
Questions
Can I keep my fridge running during a kitchen renovation?
Usually, by moving it to another room before demolition, onto a level floor near a receptacle. Let it cool down and confirm it reads 4°C or colder before restocking fresh food. If the old fridge is being replaced, keep it until the new one is installed.
Is it worth moving out during a kitchen renovation?
For most households, no: a temporary kitchen gets them through. Staying elsewhere makes sense for the dustiest demolition days, or when someone at home has asthma, a newborn or a medical need for a clean, quiet space.
How do I wash dishes without a kitchen sink?
A laundry tub is the best stand-in. Without one, fill two tubs (one soapy, one rinse) from a bathtub tap and empty the wastewater down a tub or toilet rather than leaving it standing. Disposable plates during the busiest weeks cut the load.
Will the water and power be off in the rest of the house?
Only briefly, for specific connections: the plumber may shut off the main water while tying in new lines, and the electrician turns off circuits while working at the panel. Ask for those dates ahead of time; in a condo, water shut-offs are arranged with building management.
Sources and further reading
- Safe food storage (Health Canada)
- Food safety tips for leftovers (Health Canada)
- Reduce your exposure to lead (Health Canada)
- Chemical safety for DIY projects and renovations (Health Canada)
- Measuring, fabrication and installation: the countertop process (RTI Cabinets)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides



