What happens during a bathroom renovation, week by week
A bathroom renovation runs single file: demolition, plumbing and electrical rough-in, inspections, backer board and waterproofing, a flood test, tile and grout, then the vanity, toilet, trim and shower glass. Purple Kitchen & Bath puts most GTA renovations at 6 to 16+ weeks. The eight-week example below follows a main bathroom that gets a new tiled shower, and explains why some days look quiet even though the job is moving.
Settle the household plan before the toilet comes out
On day one the bathroom stops being usable, and it stays that way until the fixtures go back in near the end. Decide now which toilet, sink and shower the family will use, how mornings will work with one fewer bathroom, and where towels and toiletries will live.
Ask the crew which days the water to the whole house will be off. Most of the time only the bathroom's own lines are shut, but connecting to the main supply or the stack can mean a short house-wide shut-off. The fixture and finish decisions that must be locked before this point are listed in the bathroom renovation checklist.
An eight-week bathroom, from the hallway
The example below is a typical sequence, not a promised schedule. A basement bathroom, a curbless shower, a condo or what turns up under the old floor can each add time; a powder room with no shower can take less.
| Week | Work in the room | Your part |
|---|---|---|
| 1 | Fixtures, tile, drywall and old floor removed; subfloor, joists and stack exposed | Approve any repairs found, in writing |
| 2 | Framing for niche and bench, blocking for glass and grab bars, new drains, vents and supply, valve body, fan, lights and floor-heat circuit | Confirm valve, shower head, niche and vanity heights before anything closes |
| 3 | City plumbing rough-in inspection where a permit applies, ESA rough-in inspection, then insulation and board | Provide access; expect short visits and long waits |
| 4 | Waterproofing membrane on shower walls, floor, niche and bench; flood test; heating mat and floor levelling | Ask to see the flood test or a photo of it |
| 5 | Floor and wall tile set | Wet saw noise; a final check on tile layout and trim pieces |
| 6 | Grout, sealant at corners and changes of plane, paint; glass measured once tile is done | Approve grout colour; confirm glass hardware finish |
| 7 | Vanity, toilet, valve trim, faucets, mirror, lights and accessories installed | Wait out the grout maker's cure before the first shower |
| 8 | Shower glass installed when it arrives, final inspections, deficiency fixes, walkthrough | Test everything and sign off |
Week one is about what the floor and walls reveal
Demolition takes a day or two; reading what it exposes takes longer. Common finds are a soft subfloor around the old toilet, joists notched for earlier plumbing, a drain line that can't take a new connection, or wiring that needs replacing. Each becomes a decision: what to repair, at what cost, and how many days it adds. Get those answers in writing before work continues.
Older houses add another layer. Plaster, joint compound, old floor tiles and pipe insulation may need testing before they are disturbed, which is why that check belongs before week one; see asbestos and lead in older homes and old house surprises behind the walls.
The rough-in is the bathroom's point of no return
Week two fixes almost everything you can't change later: where the drains sit, how high the shower valve and head go, where the niche and bench are, and where the fan and lights land. The valve body you chose goes into the wall now; see thermostatic and pressure-balanced shower valves.
Then the walls wait for inspectors. Toronto lists a plumbing rough-in inspection of the water supply, drains, waste and vents once they are complete and ready for testing, and inspects within two business days of a request. ESA inspects the new wiring before it is hidden and says no wiring is to be concealed until an inspector authorizes it. Toronto adds that work covered before inspection must be uncovered, so a closed wall here costs days, not hours.
Waterproofing and the flood test: a quiet day that protects the rest
Behind the tile, a membrane does the real work of keeping water out of the walls and floor. Once it is on, the drain is plugged and the shower floor is flooded to prove it holds before a single tile goes down. Shower waterproofing systems compares the membrane types.
How long the membrane must cure before that test depends on the product and the room. LATICRETE's Hydro Ban data sheet allows flood testing about 2 hours after the final coat at 21°C or warmer and 50% humidity, but typically 24 hours at 10°C to 21°C and 70% humidity. A cool bathroom in November can therefore lose a day that a warm one in July doesn't. If the test fails, the membrane is repaired and tested again, which is exactly why it happens before tile.
Tile and grout weeks: noise first, then waiting
Tile weeks are loud while the wet saw runs, then quiet while mortar and grout cure. Floors and walls are often tiled in stages so each surface can set before the next is worked on, and large tiles and patterns with many cuts take longer.
Grout sets the date of your first shower. MAPEI's data sheet for its Keracolor S sanded grout restricts use of residential showers for 24 to 48 hours after grouting, 14 days for steam showers, and says the grout needs 21 days to cure fully before regular cleaning. Other grouts have different numbers, so ask which product went in and follow its sheet rather than a rule of thumb.
Fixtures, glass and the handover
The room comes back quickly once tile is done: vanity, toilet, valve trim, faucets, mirror, lights and accessories can go in within a few days. Frameless shower glass usually lags, because it is made to measurements taken from the finished tile and can't be cut once tempered; frameless glass shower doors explains the options. A temporary curtain can bridge the gap if the shower is ready first.
Closing out has two official steps. Toronto's final plumbing inspection comes at the completion of fixture installation, and the property owner must book it to close the permit. ESA's final inspection follows once all devices and cover plates are in, and whoever filed receives the Certificate of Acceptance. Then the walkthrough: run every tap, flush the toilet, check the fan, look at the tile in raking light and list anything that needs attention.
Questions
Why is nobody working in my bathroom on some days?
Usually because something is curing or waiting for an inspector: the membrane before the flood test, mortar before grout, grout before fixtures. Those pauses are built into the sequence, and rushing them is how leaks and cracked grout start.
When can I take the first shower in my new bathroom?
When the grout maker says so. MAPEI's Keracolor S, for example, restricts residential showers for 24 to 48 hours after grouting, while other grouts ask for longer. Ask your installer which product was used.
What happens if the shower fails its flood test?
The leak is found, the membrane is repaired and the test is repeated until it holds. It costs a day at most, because no tile has gone on yet.
Can two trades work in the bathroom at the same time?
Rarely. A bathroom is small and the work is stacked: the plumber's pipes must be inspected before the board goes up, and the membrane must cure before the tiler starts. That single-file order is why a small room still takes weeks.
Sources and further reading
- LATICRETE HYDRO BAN product data sheet
- Keracolor S technical data sheet (MAPEI Canada)
- When to call for inspection of small buildings (City of Toronto)
- Notifications and inspections (Electrical Safety Authority)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.