
Kitchen appliances
Induction cooktops in a kitchen renovation
An induction cooktop heats the pan itself through a magnetic field, so planning one in a renovation is mostly about the electrical supply, the counter cut-out and your cookware. Expect a dedicated 208/240-volt circuit sized to the model (one widely sold line lists a 30-amp breaker for its 30-inch cooktop and 50 amps for its 36-inch), enough panel capacity, an ESA-notified installation by a licensed electrical contractor, and pans a magnet sticks to. It still needs a ducted hood.
How an induction cooktop heats, and which pans work
Under the glass-ceramic top, each zone has a copper coil carrying high-frequency alternating current. Its magnetic field induces eddy currents in the base of a ferromagnetic pan, and the pan's own resistance turns that current into heat. The glass warms only from contact with the hot pan, which is why spills rarely bake on and why ENERGY STAR notes the surface is not hot to the touch without a pan on it. Efficiency against gas is set out in gas vs induction cooktops; this page is about fitting one into a renovation.
Cookware needs a magnetic base. ENERGY STAR's test is simple: if a fridge magnet sticks to the bottom, the pan will work.
- Works: cast iron, enamelled cast iron, carbon steel and most magnetic stainless steel, including clad pans with a stainless outer layer over an aluminum core.
- Does not work on its own: plain aluminum, copper and glass. An induction disk under the pan is possible but much less efficient than a magnetic pan.
- Flat bottoms matter: the field weakens quickly with distance, so a warped or round-bottomed pan heats poorly.
- No aluminum foil on the glass: cooktop makers prohibit it, because thin foil heats quickly and can melt.
Circuit size comes from the model, not the width
Induction cooktops are hard-wired to a dedicated 208/240-volt circuit, and the breaker size is printed on the spec sheet or in the installation guide. Within one widely sold brand, the published figures look like this:
Why can a 7.2 kW cooktop sit on a 30-amp breaker when its zones on boost add up to more? Power management. On that 30-inch model, boost runs on only two zones at a time, which caps the total draw. Requirements vary between brands and models, so size the circuit from the exact installation guide, never from the width or a neighbour's kitchen. These cooktops also ship with a 37-inch cord and no plug, so the junction box has to sit within reach in the cabinet below.
| Cooktop | Rated power | Breaker | Counter cut-out |
|---|---|---|---|
| 30-inch, four zones | 6.24 kW | Per installation guide | 28 7/8 x 20 in |
| 30-inch, flexible zones | 7.2 kW | 30 A | 28 7/8 x 20 in |
| 36-inch, flexible zones | 12 kW | 50 A | 34 7/8 x 20 in |
Panel capacity and service upgrades in GTA homes
Before quoting, the electrician runs a load calculation under the Ontario Electrical Safety Code using everything the house already powers. Replacing an old electric range can sometimes reuse its 240-volt circuit if the rating matches the new model; switching from gas adds a large new load. The calculation leads to one of three answers.
A service upgrade is the slow one. Builders Ontario's October 2026 guide puts a 100-amp to 200-amp overhead upgrade at about $3,800 before HST, in a range of $2,500 to $5,000, and an underground service with a trench at $5,000 to $7,000 and up. A panel swap at the same amperage, about $1,500 to $3,000, adds no capacity. These are typical Ontario market ranges, not quotes; your house sets the real number.
Timing matters more than price. Toronto Hydro describes its service upgrade request as a ten-step process with an ESA inspection before it reconnects, and says service connections can take from a few weeks to several months, so start the request during design rather than after demolition. In a condo, the suite panel and the building's supply are shared concerns: ask management what an added 240-volt load requires before you choose the cooktop.
| Finding | Typical fix | Who is involved |
|---|---|---|
| Capacity and a free breaker space | A new dedicated circuit from the panel | Licensed electrical contractor; ESA notification |
| Capacity, but no free space | A subpanel or a new panel at the same amperage | Licensed electrical contractor; ESA notification |
| Not enough capacity | A service upgrade, for example 100 A to 200 A | Electrical contractor, ESA and the local utility, such as Toronto Hydro or Alectra |
Permits: the ESA notification and who may do the work
In Ontario, hired electrical work in your home must be done by a Licensed Electrical Contractor (LEC), who files a notification, in effect the electrical permit, with the Electrical Safety Authority before starting. When the work passes, the contractor receives an ESA Certificate of Acceptance. Keep a copy: insurers can ask for it, and it helps at resale. Master and certified electricians cannot be hired directly; they work under a licensed contracting business. ESA also lists one more warning sign: anyone who says a panel change or service upgrade does not involve the utility.
ESA's own fee for a service change on a single dwelling is $86 for a licensed contractor, subject to its $92 minimum, according to Builders Ontario; a larger permit line on a quote is mostly the contractor's time to file and meet the inspector. If a gas range is coming out, capping the line is fuels work for a TSSA-registered contractor, not the electrician. Circuits, panels and permits for the whole room are covered in electrical upgrades in a kitchen renovation.
Cut-out, countertop and what can sit underneath
The cooktop drops into a rectangle cut in the counter and its body hangs below: 4 1/8 inches on the models above, with a 20-inch-deep cut-out set at least 2 1/4 inches from the counter front and 2 inches from the back wall. That depth decides what goes underneath. The installation guide sets the clearance to anything below, such as a drawer or an oven, and some brands publish a separate detail for installing a cooktop above a wall oven. If your combination is not shown, do not assume it is allowed.
The counter needs planning too. Stone and quartz fabricators reinforce the area around a cut-out and round its inside corners, and thin porcelain or sintered slabs have their own rules for how close a cut-out may sit to the edge; kitchen countertop thickness and overhangs explains how slab thickness changes those limits. Template the counter only once the cooktop is on site or its final installation guide is in hand.
Ventilation, noise and the glass top
Induction removes combustion, not cooking fumes. Steam, grease and smoke still come off the food, so plan a ducted hood sized for the cooktop; range hood venting for a kitchen renovation covers ducts and make-up air in Ontario. What you will notice is less heat: ENERGY STAR says more of the energy goes into the pan and less into the room, which helps keep a kitchen cooler. Some cooktops can also switch on a matching hood automatically, which is worth asking about if both come from one brand.
Expect a little sound. The electronics are cooled by a fan, and at high power some pans give off a high-pitched hum, especially clad pans with loose handles or poorly bonded layers. The glass-ceramic top is tough but not indestructible: ENERGY STAR advises against scouring sponges, which can scratch it, and warns that heavy cookware dropped or dragged across the surface can crack it. Lift cast iron rather than sliding it.
Questions
Can an induction cooktop go above a wall oven?
Sometimes. The cooktop's body needs room below the counter, and makers list which ovens and clearances are approved; one brand publishes a separate installation detail for its cooktops above wall ovens. If the guide does not show your combination, plan another layout.
Will my existing range circuit handle a new induction range?
If you are replacing an electric range, the 240-volt circuit is often reusable, but only if its rating meets the new model's requirement. A licensed electrical contractor compares the breaker and wire size with the installation guide and files the ESA notification for any change.
Why does my induction cooktop buzz or hum?
Two sounds are normal: the cooling fan, and a high-pitched hum from some pans at high power. Pans with welded-in cladding and solid rivets are less likely to hum than pans with loose parts or layers that are not well bonded.
How long does an electrical service upgrade take in Toronto?
Toronto Hydro says service connections can take from a few weeks to several months, depending on complexity. Once the electrical work passes ESA inspection and everything is in order, it schedules the upgrade itself within about five business days for services of 750 volts or less.
Sources and further reading
- ENERGY STAR: Electric cooking products (induction, cookware and care)
- Bosch Benchmark 30-inch induction cooktop NITP069UC spec sheet (Canada)
- Toronto Hydro: Service upgrade request
- Electrical Safety Authority: Hire a Licensed Electrical Contractor
- Builders Ontario: Electrical panel upgrade cost in Ontario (October 2026)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





