Bathroom renovation in an older Toronto home

A bathroom in an older Toronto house, especially one built before the mid-1950s, usually hides some of the same things: a lead water service, galvanized steel supply pipe, a cast-iron drain stack, knob-and-tube wiring and plaster walls in a room that is no longer square. None of them stops a renovation, but each changes the scope. Check for them before the design is final, and carry the likely fixes as allowances in the budget rather than discovering them mid-demolition.

By the Purple Kitchen & Bath team · Updated · 6 min read · Photo: a Purple Properties project

What an older Toronto bathroom usually hides

Houses from the early and middle 20th century were plumbed and wired with the materials of their day, and many still carry some of them. The table lists the usual suspects and how to spot them; a walk through the basement, where pipes and wiring are often exposed, answers most of the questions.

Common materials in older Toronto houses and their effect on a bathroom renovation
What you may findEraHow to spot itWhat it means for the bathroom
Lead water service pipeHomes built before the mid-1950s (City of Toronto)Pipe into the water meter is grey, scratches easily and does not sound hollow when tappedReplace the private side; the City can replace its side
Lead solder on copper jointsBefore 1990 (City of Toronto)Not identifiable by eye; a water test shows leadNew supply piping in the work area removes it
Galvanized steel supply pipeCommon in early 20th-century plumbingGrey threaded pipe; weak pressure or rusty waterReplace back to sound pipe, not only inside the bathroom
Cast-iron drain and vent stackTypical of older housesHeavy black pipe with bell-and-spigot jointsAssess its condition; connect to it or replace sections
Knob-and-tube wiringEarly 1900s to 1940s (ESA)Porcelain knobs and tubes in the attic or basement; two-pin outletsAssessment by a licensed electrical contractor; new bathroom circuits
Plaster on wood lathBefore drywall became standardHard, thick walls with wood strips behindDust control and careful joins between old and new walls

Start with the water service: lead pipe and the City's replacement program

The City of Toronto says a house built before the mid-1950s may have a lead water service pipe. The pipe has two owners: the City owns the section from the watermain to the property line, and the homeowner owns the section from the property line into the house. To check, look at the pipe entering the water meter, ask a licensed plumber, or call 311 to have staff search City records, which can take up to 30 business days. The City also offers free lead testing.

If the pipe is lead, the City's Priority Lead Water Service Replacement Program will replace the City-owned section on a priority basis for owners who commit to replacing their own. You can have the City's contractor do both sides at once, paying for your side, or hire your own contractor for your side first and then apply with proof. Applications can take up to two weeks to process, and once one is approved the City aims to replace its section within 12 weeks. Toronto Public Health recommends replacing both sides at the same time, because cutting only one can cause a temporary spike in lead levels.

A bathroom renovation is a natural moment to do it, since new supply lines are being run anyway. Until then, the City advises running the cold tap for at least five minutes when water has sat for hours, using cold water for drinking and cooking, and considering a filter certified to NSF-053 for lead.

Galvanized supply lines and cast-iron drains: replace, or connect with care

Galvanized steel pipe rusts from the inside out. The scale it builds up narrows the bore, which shows up as weak pressure at the shower and discoloured water, and pieces can flake off into the water. Its typical life expectancy is commonly put at about 40 to 50 years, so any galvanized pipe left in a pre-war house is long past it. When the bathroom is opened, replacing the supply lines back to the point where they meet newer pipe, often in the basement, avoids connecting a new shower valve to a restricted old line.

Cast-iron drain stacks are different: many are still sound. Older ones were joined with bell-and-spigot joints packed with oakum and sealed with poured lead. A stack that is cracked, rusted through or weeping at a joint is replaced in sections; a sound one is kept and new drains are tied into it with approved fittings. Ontario's Building Code (Article 11.3.4.1) applies the full plumbing rules of Part 7 to the plumbing in the part of the house being altered and to any plumbing the work adversely affects, so the old system cannot simply be extended as it is. One more change: a new toilet in a house must use no more than 4.8 litres per flush (Table 7.6.1.6.-B).

Knob-and-tube wiring: what the Electrical Safety Authority says

Knob-and-tube was used in homes from the early 1900s to the 1940s. According to ESA, existing knob-and-tube may stay in place if it is protected by a 15 A fuse or breaker, no outlets have been added that would overload the circuit, and the conductors look sound where visible. The installation rules were deleted from the Ontario Electrical Safety Code in its 2021 edition, but the code is not retroactive.

For a bathroom, the practical answer is that the room gets new wiring regardless. ESA's guidance says new bathroom receptacles must have ground fault protection and new outlets must follow the current code, meaning a grounded branch circuit. Any change to existing wiring should be done by a licensed electrical contractor with a notification filed with ESA. If knob-and-tube runs through the walls you are opening, that is the cheapest time to replace it; knob and tube wiring and renovations covers the whole-house question.

Plaster walls, out-of-square rooms and tired floors

Plaster on wood lath is thicker and harder than drywall: narrow lath strips nailed across the studs, then a scratch coat, a rough brown coat of about half an inch and a smooth finish coat. Where a new drywall or backer-board wall meets old plaster, the two surfaces rarely line up, so the framing is shimmed or furred to bring them flush. Demolishing plaster is dusty work that needs containment, and some older materials can contain asbestos, so test anything suspect before demolition; see asbestos and lead in older homes.

A century of settling leaves rooms out of square and floors out of level, and straight tile lines make both obvious. Large-format tile and long grout lines need flat, plumb walls and a flat floor, which can mean furring walls straight and levelling the floor before tile. Old board subfloors are usually overlaid or replaced, because tile systems specify a panel subfloor; Schluter's handbook, for its curbless tiled showers in Canada, calls for at least 5/8-inch tongue-and-groove plywood or OSB over joists no more than 16 inches apart, with 3/4-inch recommended.

Not everything old has to go. The Building Code (Article 11.3.3.1) allows renovation work that keeps a building's character or heritage value by reusing the same or similar materials, as long as fire separations and early warning and evacuation systems are not adversely affected. Original trim, doors and mouldings can often stay.

Plan the budget and schedule around what the walls may hold

The surprises in an old house are predictable as a category, if not in detail. Carry allowances for the likely items, such as supply-line replacement, a section of drain stack, new circuits and subfloor work, so they become decisions rather than emergencies, and test the water and inspect the main drain before the design is final.

Schedules stretch too. Most GTA renovations take 6 to 16 weeks or more depending on scope, complexity and change orders, and older houses sit toward the longer end when the plumbing or wiring is replaced. The Victorian kitchen and bathroom renovation in Milton is the extreme case: a heritage Victorian-Gothic house rebuilt from the studs, with a primary ensuite, powder rooms and wood-look tile showers, while keeping its period character.

Questions

Does the City of Toronto pay to replace a lead water pipe?

The City pays for and replaces its own section, from the watermain to the property line. The homeowner pays for the private section into the house. Owners who commit to replacing their side can apply to the Priority Lead Water Service Replacement Program, and some households with a child under six or a pregnant resident and lower incomes qualify for a faucet filter rebate.

Do I have to remove all the knob-and-tube wiring to renovate a bathroom?

Not by electrical code, which is not retroactive: ESA allows existing knob-and-tube to remain under conditions. The bathroom itself gets new grounded circuits with ground fault protection, and many homeowners replace any knob-and-tube in walls already open. ESA notes that many insurers will not provide or renew coverage on homes with it, so check your policy.

Should the cast-iron drain stack be replaced during a bathroom renovation?

Only if it is failing. A sound stack can stay, with new drains connected to it. Cracks, rust holes or leaking joints call for replacing the damaged sections, and it is far easier to do while the wall beside it is open.

Sources and further reading

  1. City of Toronto: Lead and drinking water
  2. City of Toronto: Priority Lead Water Service Replacement Program
  3. Electrical Safety Authority Flash 22-16-FL: Knob and tube wiring in residential installations
  4. 2024 Ontario Building Code compendium, Part 11: Renovation (Articles 11.3.3.1 and 11.3.4.1)
  5. 2024 Ontario Building Code compendium, Part 7: Plumbing (Table 7.6.1.6.-B)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.