Condo costs

Condo renovation cost in Toronto

Industry guides put a full condo renovation in Toronto at about $85,000 to $110,000 or more in 2026, with a single room commonly $15,000 to $35,000 (HomeStars). A mid-range Toronto kitchen runs $25,000 to $75,000 and a standard bathroom refresh $15,000 to $30,000. Condos add costs a house does not have: application fees, elevator bookings and damage deposits of roughly $1,000 to $4,000 before work starts, and $1,300 to $4,500 for debris removal and storage. These are market ranges, not quotes for your unit.

By the Purple Kitchen & Bath team · Updated · 3 min read · Photo: a Purple Properties project

What Toronto condo renovations cost by scope

Two HomeStars cost guides updated in August 2026 give the clearest Toronto figures. They do not agree perfectly, which is a reminder that a range describes the market, not your suite.

Typical Toronto market ranges, 2026
ScopeTypical rangeSource
Full condo renovation$85,000 to $110,000+HomeStars condo cost guide
Full condo renovation, mid-range, all unit sizes$18,000 to $160,000HomeStars Toronto renovation guide
Condo renovation per square foot$100 to $300HomeStars Toronto renovation guide
Single room in a condo$15,000 to $35,000HomeStars condo cost guide
Kitchen: counters and backsplash refresh$15,000 to $20,000HomeStars Toronto renovation guide
Kitchen: mid-range (cabinets, counters, appliances, lighting, plumbing)$25,000 to $75,000HomeStars Toronto renovation guide
Bathroom: three-piece refresh, no plumbing moves$15,000 to $30,000HomeStars Toronto renovation guide
Powder room$8,500 to $14,500HomeStars Toronto renovation guide

The condo-only costs most first quotes leave out

These line items do not exist in a detached house. HomeStars' Toronto guide warns they are not always in a first quote, so ask for them to be listed.

ItemTypical rangeNotes
Application fees, elevator booking fees and damage deposits combined$1,000 to $4,000 before work beginsHomeStars condo cost guide
Refundable damage deposit$1,000 to $5,000HomeStars Toronto guide; returned under the building's terms after its post-inspection
Elevator booking$200 to $500 per dayHomeStars Toronto guide
Debris removal and material storage$1,300 to $4,500HomeStars condo cost guide; hauling waste down a tower takes longer than filling a driveway bin
Temporary housing$2,000 to $6,000 per monthOnly if you move out; HomeStars condo cost guide
Scanning before coringVariesOnly if a drain moves; CCI Toronto notes x-ray scanning can require evacuating several floors

Where a condo kitchen budget goes

Labour typically takes 40% to 50% of a Toronto renovation budget and materials 30% to 40%, according to HomeStars. In a condo kitchen, the largest material lines are cabinetry and the countertop.

  • Cabinetry: custom runs $500 to $1,200 per linear foot and semi-custom $200 to $400 (HomeStars Toronto guide). A full wall of millwork, like the 12-foot run in the city-view condo kitchen, is where a per-foot rate adds up; see custom kitchen cabinet cost.
  • Quartz: $80 to $160 per square foot installed (HomeStars condo cost guide); see quartz countertop cost.
  • Plumbing relocation: $2,500 to $5,000 (HomeStars Toronto guide), before any condo scanning, coring or ceiling repair in the unit below.
  • Flooring, if replaced: engineered hardwood $8 to $18 and luxury vinyl plank $5 to $12 per square foot installed (HomeStars condo cost guide), plus whatever acoustic underlay the building requires.

Five decisions that move a condo budget most

  • Plumbing in place or moved. Leaving the sink, toilet and shower over existing drains avoids coring, scanning and work in the suite below.
  • One project or several. HomeStars notes that renovating several rooms at once can reduce costs, because contractors bundle labour and material orders and set up the site once.
  • The age of the building. Older units can hide asbestos, mould or subfloor problems that HomeStars prices at $1,500 to $15,000 to fix; see renovating in an older Toronto condo.
  • Finish level. HomeStars says the gap between builder-grade and premium kitchen or bathroom selections can swing a budget by tens of thousands of dollars.
  • Contingency. Both HomeStars guides recommend holding 15% to 20% of the budget for surprises.

How to read a condo renovation quote

Check four things before comparing two quotes side by side.

First, tax: 13% HST applies in Ontario, and renovation prices are often shown before it; see HST on renovations in Ontario. Second, the building costs in the table above: listed, or left for you to discover. Third, permits, inspections and any engineer's letter: included or extra. Fourth, the allowances: what the quote assumes for tile, faucets or appliances you have not chosen yet. When two quotes differ by thousands, check these four points before assuming the work itself differs.

Questions

Is it cheaper per room to renovate the kitchen and bathrooms together?

Often, yes. HomeStars notes that bundled projects can cost less because labour and material orders are combined and the site is set up once. In a condo you may also need only one approval process and one round of building logistics.

Do I need to update my insurance after renovating a condo?

Usually. The corporation's insurance does not cover improvements beyond the standard unit (section 99(4) of the Condominium Act, 1998), so tell your insurer about new cabinets, stone and tile. See condo renovation insurance and liability.

Are condo renovations cheaper in Etobicoke or North York than downtown?

HomeStars' Toronto guide says projects in the core carry premium pricing, partly because of traffic, parking restrictions and narrower access, and that the same scope in Scarborough, Etobicoke or North York generally comes in 10% to 20% lower.

Sources and further reading

  1. HomeStars: How Much Does a Condo Renovation Cost in Canada in 2026?
  2. HomeStars: How Much Do Renovations Cost in Toronto in 2026?
  3. iFinance: Bathroom renovation cost in Canada, 2026
  4. CCI Toronto, CondoVoice Fall 2024: Post-Tensioning (Thompson and New)
  5. Condominium Act, 1998, S.O. 1998, c. 19 (Ontario e-Laws)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.