
Bathroom tile
Grout types: cement, epoxy and urethane
Cement grout is the familiar standard: inexpensive, forgiving to install and easy to repair, but porous, so it can stain unless it is kept clean and sealed. Epoxy grout is a two-part resin that resists stains and chemicals with no sealer, but it sets quickly and takes skill to install cleanly. Urethane and other ready-to-use grouts come pre-mixed, need no sealing and resist stains well, but they need roughly three to seven days to cure before the shower is used.
The three grout families at a glance
The figures below come from current Canadian and North American data sheets for widely sold products in each family. Other brands differ, so the data sheet for the exact grout you choose is the one that counts.
| Detail | Cement (sanded) | Epoxy | Urethane and ready-to-use |
|---|---|---|---|
| Standard | ANSI A118.6 | ANSI A118.3 | Varies by product |
| Example joint range | 1/8 to 5/8 inch | 1/16 to 3/8 inch | 1/16 to 1/2 inch on floors, 1/4 inch on walls |
| Mixing | Powder plus water | Two parts mixed on site | None: open the pail |
| Sealer | Not required; optional penetrating sealer | Not required | Not required |
| Back in use | Shower restricted 24 to 48 hours; full cure 21 days | No foot traffic for 24 hours; 10 to 14 days before immersion or chemical exposure | 3 to 7 days before a shower floor is used |
| Main limit | Porous; stains if neglected | Short working time; haze if not washed off on schedule | Not for steam showers or continuously wet areas |
Cement grout: sanded, unsanded and polymer-modified
Cement grout is portland cement, sand in the sanded versions, pigment and, in many modern bags, added polymers. Joint width decides which kind: the Tile Council of North America (TCNA) says joints narrower than 1/8 inch should generally get unsanded grout, joints of 1/8 inch and wider sanded grout, and joints over 3/8 inch a more heavily sanded mix. Narrow joints between large porcelain tiles are why unsanded and resin grouts show up so often in modern bathrooms.
Its strengths are price, a long working time and easy repair, since a stained or cracked joint can be ground out and regrouted. Its weakness is porosity. MAPEI's data sheet for one polymer-modified sanded grout says sealing is not required but a penetrating sealer may still be applied, asks for showers to stay out of use for 24 to 48 hours, and puts full cure at 21 days. It also warns that cleaning with too much water causes efflorescence, discoloration and soft, powdery joints, the patchy look some new bathrooms get.
Epoxy grout: stain-proof in practice, demanding to install
Epoxy grout is a two-part resin and filler system with no water in the mix, so the cured joint is dense and does not absorb spills. MAPEI's 100%-solids epoxy, certified to ANSI A118.3, lists high stain resistance and resistance to chemicals and cracking, with no sealer required. That makes it the usual pick for shower floors, white grout in a busy family bathroom and joints around a vanity top.
The trade-off is workability. The same data sheet calls for the tile and substrate to sit between 16°C and 32°C while grouting and for 72 hours after, a final wash within 15 to 20 minutes to remove the film, no walking on the floor for 24 hours, and 10 to 14 days at room temperature before immersion or exposure to chemicals. Grout haze left too long is hard to remove. It also warns against using that epoxy on white or translucent marble, which brings us to matching grout to the tile.
Urethane and ready-to-use grouts: no mixing, longer cure
Ready-to-use grouts, the family urethane grouts belong to, come pre-mixed in a pail with a resin binder instead of cement. The exact chemistry varies by brand, so read the data sheet rather than the label. Their appeal is consistency: the colour is mixed at the factory rather than on site, and nothing needs sealing afterwards.
LATICRETE's ready-to-use grout data sheet shows the typical rules. It suits joints from 1/16 to 1/2 inch, with a maximum of 1/2 inch on floors and 1/4 inch on walls; it must never have water added; it is not for steam showers, pools or other continuously wet areas; and in intermittently wet areas such as shower floors it should cure for seven days before use. MAPEI's advice for its ready-to-use grout is to wait three days before using the shower, longer in humid, cold or poorly ventilated conditions. That cure time is the real cost of the convenience, because the shower stays out of service while it hardens.
Matching grout to the tile and the room
Start from the tile and how the space is used, then pick the grout family.
- Shower floor: epoxy for the best stain and water resistance, or a ready-to-use grout if you can leave the shower unused for its full cure.
- Steam shower: a grout rated for continuously wet conditions, typically epoxy; most ready-to-use grouts are excluded. See steam shower installation.
- Large-format porcelain with narrow joints: unsanded cement, epoxy or ready-to-use grout, since sanded grout needs 1/8 inch or more; see large-format porcelain tile in bathrooms.
- Mosaics: many joints, so stain resistance pays off; mosaic tile in bathrooms covers layouts.
- Polished marble and glossy glazes: MAPEI cautions that some glazed tiles and marble can be scratched, stained or dulled by pigmented, sanded or epoxy grouts; white grout generally suits white or light marble. Test on a spare piece first; marble bathrooms explains why.
- Bathroom floor outside the shower: any family works; epoxy or ready-to-use if you want light grout to stay light.
Where grout should not go: movement joints
Grout is rigid, so it cracks where surfaces move against each other. Inside corners where walls meet, the joint where a wall meets the floor or tub, and the perimeter of a large floor get a flexible sealant matched to the grout colour instead. Grout data sheets point to TCNA method EJ171 and, in Canada, to the Terrazzo, Tile and Marble Association of Canada (TTMAC) specification guide for where those movement joints belong.
A cracked grout line at an inside corner is usually a missing movement joint, not bad grout. Ask to see where the sealant joints are on the tile layout before the grout is chosen, and treat them as maintenance items that get renewed when they wear.
Questions
Do I need to seal cement grout in a shower?
Many modern polymer-modified cement grouts do not require it, but a penetrating sealer slows staining and is worth applying once the grout has cured. Epoxy and ready-to-use grouts are not sealed.
Why does my new cement grout look blotchy?
Uneven colour usually comes from too much water during cleanup or uneven drying, which can leave efflorescence, a whitish haze, or light patches. Grout makers warn against flooding the joints while cleaning, so raise it with the installer before trying any remover.
Is epoxy grout worth using in the whole bathroom?
It usually costs more and takes longer to install, so many homeowners use it where stains and water are worst, the shower floor and around the vanity, and cement grout elsewhere. Keep the colour the same in both so the change does not show.
Can sanded grout scratch tile?
It can scratch polished marble, polished stone and some soft glazes. Grout makers recommend testing on a spare tile first, and using unsanded, epoxy or ready-to-use grout where the surface is delicate.
Sources and further reading
- MAPEI Canada: Keracolor S sanded grout technical data sheet
- MAPEI Canada: Kerapoxy CQ epoxy grout technical data sheet
- LATICRETE: READY-TO-USE pre-mixed grout data sheet
- MAPEI Canada FAQ: How long after grouting with Flexcolor CQ should I wait to use my shower
- Tile Council of North America: Grout FAQ
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides




