Renovations

Guides

Kitchen with a quartz waterfall island, sage cabinets, brass pendants and white oak floors

Kitchen renovations in Toronto

Custom kitchen renovations designed around how you cook, gather and live.

Request a quote

The whole kitchen, handled

From structural changes and new layouts to cabinetry, countertops, lighting and finishes, we handle every part of your kitchen renovation with precision and transparency. Whether you want a chef’s kitchen, better flow for family life or a space for entertaining, one team plans, permits and builds it.

Not sure where the budget should go? At the complimentary consultation, Rowan and the design team help you plan the layout, storage and surfaces around how you cook and live.

“Where design, function, and investment meet.”

Floor-to-ceiling oak panel wall concealing built-in appliances

Custom kitchens & layout changes

Layouts reworked for how your household uses the room, from opening up sightlines to creating open-concept kitchens.

  • A dated two-way fireplace removed to open a North Toronto main floor
  • Vaulted ceilings introduced in a Toronto open-concept renovation
  • A full oak appliance wall built into a Vaughan family kitchen
Tall blue shaker pantry cabinets around a stainless refrigerator

Cabinetry & millwork

Custom cabinetry and millwork built to the ceiling, with the storage planned in from the start.

  • 12-foot custom millwork in a Toronto condo
  • Glass-front display uppers
  • Integrated, panel-ready appliances
Waterfall quartz island with an undermount sink and black faucet

Countertops & surfaces

Quartz and stone counters, waterfall islands and full-height slab backsplashes, finished with clean, continuous lines.

Navy kitchen island with wooden stools under enamel pendants

Islands

Islands sized to the room, from compact condo islands to family islands with seating, with the sink, storage or cooktop where it works best.

Everything else that goes into it

One team plans, permits and builds it, and keeps you informed from start to finish.

  • Backsplashes

    Full-height quartz slab, glossy stacked tile, or a stone feature wall behind the range.

  • Lighting

    Designer pendants, under-cabinet lighting and pot lights, layered for cooking and evenings.

  • Flooring

    White oak that runs continuously through the main floor, or porcelain tile where it works harder.

  • Storage

    Pantry walls, lift-up cabinets, floating shelves and drawers planned around what you keep.

  • Appliances

    Built-in and integrated appliance packages, planned into the cabinetry from day one.

  • Open-concept kitchens

    Walls and beams reworked to open the kitchen to living space, with permits and inspections handled for you.

Kitchen reveals

Filmed on our own job sites. Select a video to watch with sound.

From the gallery

See all 104 photos

More kitchen guides

Common questions

How much does a kitchen renovation cost?

It depends on the size of the kitchen, the layout and the finishes you choose, so we don’t publish fixed prices. Your initial consultation is complimentary, and we’ll give you a personalized estimate.

How long does a kitchen renovation take?

Most renovations in the GTA take 6 to 16+ weeks, depending on the scope, complexity and any change orders.

Can you change my kitchen layout?

Yes. We regularly rework layouts, from removing a dated two-way fireplace to open up a North Toronto main floor to a structural reconfiguration with vaulted ceilings in Toronto. We handle the permits and inspections.

Do you provide custom cabinetry?

Yes. Custom cabinetry and millwork are part of most of our kitchens, from 12-foot millwork in a Toronto condo to a full oak appliance wall in Vaughan.

Do I need a permit for my renovation in Ontario?

Most kitchen and bathroom renovations that move walls, plumbing or wiring need permits, and structural changes always do. We handle all permit applications and inspections for you.

Do you renovate condo kitchens and bathrooms?

Yes. We understand condo board requirements and the realities of vertical living, from tight timelines to complex plumbing coordination. Recent condo projects include a penthouse with two new bathrooms in downtown Toronto and a full condo renovation in The Beaches.

What warranty do you offer?

Every renovation comes with a one-year workmanship warranty.

We also help you receive and register the manufacturer warranties on installed products such as appliances, fixtures and materials, so you’re protected long after the project is done.

Plan your kitchen renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.