Kitchen and bathroom renovation costs in Toronto

Toronto market guides for 2026 put a full kitchen renovation at about $20,000 to $100,000 or more and a full bathroom at about $15,000 to $55,000 or more, according to HomeStars' August 2026 Toronto cost guide. Most mid-range kitchens fall between $25,000 and $75,000, and most bathrooms that keep their plumbing where it is fall between $15,000 and $30,000. These are typical GTA market ranges before 13% HST, not quotes: the real figure depends on your home's layout, age and finishes.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

What each kitchen and bathroom cost topic runs in 2026

One headline figure for every cost question, each tied to the guide that publishes it. Every range is a typical Toronto or Ontario market figure, not any one contractor's price.

Typical 2026 figures by cost topic, before HST. Sources: HomeStars Toronto cost guides (updated August 2026), RenoQuotes (September 2026), Home Depot Canada Ontario countertop pricing, Builders Ontario (October 2026, Central Ontario prices) and the Canada Revenue Agency.
Cost guideTypical 2026 figureSource
Kitchen renovation cost in Toronto$25,000 to $75,000 mid-range; $15,000 to $20,000 for counters and backsplash onlyHomeStars
Bathroom renovation cost in Toronto$15,000 to $30,000 with fixtures left in place; $55,000+ luxuryHomeStars
Ensuite renovation cost$18,000 to $26,000 for a mid-range 5 x 8 ft ensuiteHomeStars
Powder room renovation cost$8,500 to $14,500HomeStars
Small bathroom renovation cost$9,000 to $22,000 for a 5 x 7 ft roomHomeStars
Custom kitchen cabinet cost$500 to $1,200 per linear foot; semi-custom $200 to $400HomeStars
Quartz countertop cost$57 to $130 per sq ft installedHome Depot Canada
Walk-in shower cost$8,000 to $15,000 for a shower installationHomeStars
Kitchen renovation budget breakdownCabinetry takes 30% to 40% of a mid-range budgetRenoQuotes
How to set a renovation budget and contingencyHold 15% to 20% in reserveHomeStars
HST on renovations in Ontario13% on labour and materialsCanada Revenue Agency
Renovation financing options in CanadaNo single figure: the cost is the rate and term you qualify forLender terms
High-end kitchen renovation cost in Toronto$100,000 and up for custom work with layout changesHomeStars
Kitchen island costMoving the sink into an island adds $2,500 to $5,500RenoQuotes
Heated bathroom floor costAbout $14 per heated sq ft, $900 minimum, electricBuilders Ontario
Tub to shower conversion cost$5,000 to $12,000RenoQuotes
Steam shower costNo reliable 2026 GTA benchmark; priced per projectQuoted per project
Backsplash installation cost$800 to $2,500 for backsplash and tilingRenoQuotes
Kitchen cabinet refacing cost$6,000 to $15,000RenoQuotes
Cost to remove a load-bearing wall in Toronto$2,000 to $10,000 including engineering and permitsHomeStars
Accessible bathroom renovation cost and grants in OntarioFederal tax credit on up to $20,000 of eligible work a yearCanada Revenue Agency
Kitchen renovation return on investment60% to 80% of a mid-range kitchen's cost recoveredHomeStars
Where to save and where to splurge in a kitchen renovationAppliances, the most controllable line, run $3,000 to $15,000+RenoQuotes

Why two cost guides rarely agree, and how to read them

Published ranges differ because each guide defines its tiers differently and counts different things. HomeStars calls $25,000 to $75,000 a mid-range Toronto kitchen; RenoQuotes, a Canadian quote-matching platform, puts a mid-range kitchen in Toronto and the GTA at $40,000 to $75,000. The overlap is the safer planning band for a typical house kitchen.

Before you hold any figure up against a quote, check four things:

  • Tax. Most published ranges and most contractor quotes show prices before HST, which adds 13% in Ontario.
  • Inclusions. RenoQuotes notes that many kitchen quotes leave appliances out unless they are chosen at the design stage, and HomeStars' Toronto bathroom range excludes extras such as a new tub or custom cabinetry.
  • Region. Some Ontario guides price Central Ontario labour, which runs below the GTA. Builders Ontario, for example, notes its figures come from Simcoe County and Central Ontario.
  • Date. Some cost tables still online carry 2021 prices. Look for the update date on any table before you rely on it.

Where the money goes in a kitchen versus a bathroom

A kitchen budget is driven by what you buy; a bathroom budget is driven by who has to come. In a kitchen, cabinetry is the largest single line, 30% to 40% of a mid-range budget in RenoQuotes' breakdown, with countertops and appliances near 15% each. Change the cabinet tier and the whole budget moves with it.

A bathroom is small, but nearly every trade passes through it: demolition, plumbing, electrical, waterproofing, tile and glass. HomeStars puts labour at 40% to 60% of a Toronto bathroom budget, which is why a 5 x 7 ft room can still cost $9,000 to $22,000. The kitchen cost guide and the bathroom cost guide go line by line through each room.

Costs every Toronto renovation carries, whatever the room

A handful of line items appear on almost every project and are the easiest to forget in a first budget.

  • HST at 13%. A $40,000 project becomes $45,200 once tax is added.
  • Permit fees, where the work needs a permit. Toronto Building's 2026 schedule has a $214.79 minimum, charges $11.53 per square metre for interior alterations in a house and $23.20 per plumbing fixture in a single-family dwelling. When a permit applies is covered for kitchens and for bathrooms.
  • Contingency. HomeStars recommends 15% to 20% of the budget for what opens up behind walls.
  • Trade time. HomeStars' 2026 Toronto rates put general contractors at $75 to $120 an hour, plumbers at $80 to $150 and electricians at $90 to $140.

Neighbourhood, house age and the 2026 market

The same scope does not cost the same everywhere in the city. HomeStars finds work in Scarborough, Etobicoke and North York generally runs 10% to 20% below central Toronto, where jobs more often involve tight access and pre-war houses; old house surprises behind the walls lists what those houses hide.

Condos carry their own costs, from damage deposits to elevator bookings, and are priced separately in condo renovation cost in Toronto and condo bathroom renovation cost.

For the wider market, Altus Group's 2026 Canadian Cost Guide insights (April 2026) report that Toronto's overall construction costs stabilized in 2025 and that residential building costs declined as fewer new projects started and trades bid competitively. That report tracks new construction rather than renovations, so treat it as background, not as a price for your kitchen.

Turning a published range into a number for your home

A range tells you whether a project is realistic; a site visit tells you what it will cost. Before meeting a contractor, list what must change and what can stay, photograph the room with rough dimensions, and set a spending ceiling that already includes HST and contingency. Then compare written estimates line by line, as set out in how to compare renovation quotes: estimates that differ by thousands usually differ in what they include.

Questions

Are renovation costs in Toronto higher than elsewhere in Ontario?

Generally, yes. RenoQuotes estimates that trade rates in Toronto and Vancouver run 25% to 40% above the national average, and material prices vary less between regions than labour does. The gap is widest on labour-heavy rooms such as bathrooms.

Do published cost ranges include HST?

Usually not. Home Depot Canada's Ontario countertop prices and Builders Ontario's 2026 guides are stated before tax, and most contractor quotes show HST as its own line. Add 13% to any range before you set your budget.

How much contingency should I add for an older Toronto house?

HomeStars recommends 15% to 20% of the budget. Lean towards the top of that band for an older house, where opening walls can reveal outdated wiring, old supply pipes or framing that needs repair. The budget and contingency guide shows how to size it.

Is a kitchen or a bathroom the better investment at resale?

Both recover part of their cost. HomeStars cites 60% to 80% for a mid-range Toronto kitchen and 70% to 85% for a bathroom. Neither pays for itself on sale alone, so plan the work around how long you will live with it; more in kitchen renovation return on investment.

Sources and further reading

  1. HomeStars: How Much Do Renovations Cost in Toronto in 2026?
  2. HomeStars: Bathroom Renovation Costs in Toronto
  3. RenoQuotes: Kitchen Renovation Cost in Canada in 2026
  4. City of Toronto: Building Permit Fees (2026)
  5. Altus Group: Cautious in 2026, optimistic for 2027, Cost Guide insights

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Renovation costs

Every guide in this collection

CostsKitchen renovation cost in TorontoKitchen renovation cost in Toronto for 2026: refresh, mid-range and high-end ranges, cost by kitchen size, trade rates, permit fees and what quotes leave out.
CostsBathroom renovation cost in TorontoBathroom renovation cost in Toronto for 2026: full-room ranges by finish level, prices for tubs, showers, toilets and tile, plumbing moves and permit fees.
CostsEnsuite renovation costEnsuite renovation cost in Toronto and the GTA: 2026 ranges by size and finish, and what frameless glass, a heated floor, a bench or a freestanding tub adds.
CostsPowder room renovation costPowder room renovation cost in Toronto for 2026: a full two-piece reno, a lighter refresh, adding a new one, and what vanities, toilets and wallpaper cost.
CostsCustom kitchen cabinet costCustom kitchen cabinet cost in Toronto for 2026: price per linear foot by level, what plywood, inset doors and drawers add, and custom vs semi-custom totals.
CostsQuartz countertop costQuartz countertop cost for Toronto kitchens in 2026: installed price per sq ft by tier, a full-kitchen example, and extras like cut-outs and waterfall ends.
CostsWalk-in shower costWalk-in shower cost in Toronto for 2026: tiled shower ranges, a layer-by-layer cost breakdown, curbless upgrades, glass, linear drains and valves explained.
CostsSmall bathroom renovation costSmall bathroom renovation cost in the GTA for 2026: why a 5 x 7 room runs $9,000 to $22,000, the minimum charges behind it, and where small rooms hide cost.
CostsKitchen renovation budget breakdownKitchen renovation budget breakdown by category: the share cabinets, counters, appliances, trades and contingency take, and how the split shifts in the GTA.
CostsHow to set a renovation budget and contingencySet a renovation budget you can hold: start from your ceiling, take out 13% HST, size a 10% to 20% contingency by house age, and plan for older-home surprises.
CostsHST on renovations in OntarioHST on renovations in Ontario is 13% on labour and materials: how it shows on quotes, why the new housing rebate skips kitchen and bath work, and tax credits.
CostsRenovation financing options in CanadaRenovation financing options in Canada for 2026: HELOCs, home equity loans, refinancing, personal loans, Toronto's HELP, and which federal loans have closed.
CostsHigh-end kitchen renovation cost in TorontoHigh-end kitchen renovation cost in Toronto: what pushes a kitchen past $100,000, from built-in appliances and stone slab to structural work and power upgrades.
CostsKitchen island costKitchen island cost in Ontario for 2026: a 6 ft island runs about $7,000 to $10,000, plus what a sink, cooktop, waterfall end and lighting add to the price.
CostsHeated bathroom floor costHeated bathroom floor cost in Ontario: about $14 per heated sq ft installed for an electric mat, a $900 minimum, and what it costs per hour at 2026 hydro rates.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.