
Condo bathroom costs
Condo bathroom renovation cost
A full condo bathroom renovation in Toronto commonly costs $15,000 to $30,000 when the toilet, vanity and shower stay where they are, according to 2026 guides from HomeStars and iFinance, and HomeStars puts most mid-range Toronto jobs near $17,000. Larger or higher-end bathrooms run $30,000 to $50,000 or more. Moving a drain through the concrete slab, custom glass and premium tile push the number up, and the building adds its own fees and deposits. Treat every figure as a market range, not a price for your unit.
Four condo bathroom budgets compared
Condo bathrooms are usually compact, so the scope matters more than the square footage. These are the four budgets most condo owners are choosing between.
- HomeStars prices a small Toronto bathroom of about 5 by 7 feet at $9,000 to $22,000 depending on scope.
- iFinance prices a full gut of a 5-by-8-foot bathroom with the same layout at $15,000 to $30,000 in Ontario.
| Scope | What it usually includes | Typical range | Source |
|---|---|---|---|
| Cosmetic refresh | New vanity, toilet, tile and paint; no plumbing moves | $8,000 to $15,000 | iFinance, 2026 |
| Full gut, same layout | Stripped to the studs and slab; new waterproofing, tile, fixtures and lighting | $15,000 to $30,000 | HomeStars Toronto; iFinance |
| Tub to walk-in shower | Tub removed and replaced with a walk-in shower | $8,000 to $15,000 | iFinance (Ontario) |
| Larger or premium bathroom | Heated floor, frameless glass, premium fixtures, layout changes | $30,000 to $50,000; luxury $55,000+ | HomeStars Toronto renovation guide |
Line by line: what a Toronto bathroom estimate is made of
Labour is 40% to 60% of a Toronto bathroom budget, with plumbers and electricians billing $100 to $200 an hour, so anything that adds trade hours, like a drain move or a complex tile pattern, shows up fast. These are HomeStars' 2026 Toronto figures for the individual pieces.
| Item | Typical Toronto cost |
|---|---|
| Demolition | $800 to $1,500 |
| Shower installation, including floor, wall tile and accessories | $8,000 to $15,000 |
| Bathtub installation | $2,500 to $5,000 |
| Toilet installation | $800 to $1,200 |
| Porcelain tile, installed | $12 to $22 per sq. ft. |
| Electrical: pot lights, outlets and a ventilation fan | $1,000 to $2,500 |
| Relocating a toilet or drain line | Adds $2,000 to $5,000 or more |
Condo costs to add on top of the bathroom itself
The ranges above price the room. A condo adds its own layer, and these items belong in the budget before the first quote arrives:
- Building charges. HomeStars' condo guide puts board application, elevator booking and damage-deposit costs at $1,000 to $4,000 before work begins.
- Coring and scanning, if the drain moves. CCI Toronto notes that scanning a slab can be expensive and disruptive, and that x-ray scanning can mean evacuating several floors.
- Repairs in the suite below. If the trap or new pipe can only be reached from your neighbour's ceiling, that ceiling has to be opened, closed and refinished.
- Insurance for the upgrade. Finishes above the building's standard unit are yours to insure. And if you, a tenant or someone living in the unit causes damage to it, section 105 of the Condominium Act, 1998 adds the lesser of the repair cost and the corporation's deductible to your common expenses.
Where to save in a condo bathroom, and where not to
- Save: keep the fixtures over the existing drains. HomeStars calls this the single most effective way to keep a bathroom within budget, and in a condo it also avoids coring and the unit below.
- Save: do the whole room at once. HomeStars notes a complete renovation is more cost-efficient than the same tasks spread over several years.
- Save: standard vanity widths and glass sizes, which avoid custom fabrication.
- Don't save: waterproofing. A failed shower in a tower damages someone else's home; compare shower waterproofing systems.
- Don't save: ventilation. A quiet, properly sized fan protects new finishes from moisture; see condo bathroom ventilation.
Questions
Why does a condo bathroom often cost more than the same bathroom in a house?
HomeStars attributes higher Toronto condo costs to labour rates, stricter building requirements and high-rise logistics. In practice that means booked elevators, protected hallways, shorter working hours and debris carried down a tower, all before any condo-specific plumbing issues.
Are these prices before or after HST?
Usually before. iFinance notes Ontario renovation prices are typically quoted before 13% HST, so check whether a quote includes it before comparing two contractors.
Who pays if my new shower leaks into the unit below?
It depends on your declaration, by-laws and insurance, and on what caused the leak. The corporation insures against water escape as a major peril, but a by-law under section 105 can charge deductibles back to owners in some situations. Carry unit-owner insurance; see condo renovation insurance and liability.
Is a tub-to-shower conversion cheaper than a full condo bathroom?
Usually. iFinance puts a conversion at $8,000 to $15,000 in Ontario, against $15,000 to $30,000 for a full gut of a small bathroom. In a condo, the drain location decides how far that holds; see condo tub to shower conversion.
Sources and further reading
- HomeStars: Bathroom Renovation Costs for Toronto in 2026
- HomeStars: How Much Do Renovations Cost in Toronto in 2026?
- iFinance: Bathroom renovation cost in Canada, 2026
- HomeStars: How Much Does a Condo Renovation Cost in Canada in 2026?
- Condominium Act, 1998, S.O. 1998, c. 19 (Ontario e-Laws)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





