
Condo approvals
Getting condo board approval for a renovation
To get condo board approval for a renovation, ask management for the building's renovation rules and application form, then submit a complete package: a scope of work and drawings, your contractor's insurance certificate and WSIB clearance, a schedule inside permitted hours, and any deposit. Management reviews it, sometimes with the building's engineer, and approves it with conditions such as inspections and elevator bookings. If the work touches common elements, a section 98 agreement must also be signed and registered on title.
Step 1: Get the building's own process in writing
Every corporation runs approvals differently, so start with your management office rather than a template from the internet. Ask for:
- the current renovation or alteration application form and any renovation policy the board has adopted;
- the rules on working hours, elevator bookings, deposits and debris removal;
- flooring and acoustic underlay requirements, if any floor is changing;
- the declaration, including Schedule C, which shows where your unit ends;
- any list of approved or required trades, such as a building sprinkler contractor.
Step 2: Sort the work into in-suite and common-element changes
Split your scope into two piles. The first is work entirely inside the unit: new cabinets, tile, a vanity in the same spot. The second is anything that touches structure, shared pipes or an exclusive-use area, such as coring a new drain through the slab or changing a terrace.
The first pile goes through the building's ordinary renovation application. The second takes the longer route in step 5, because section 98 of the Condominium Act, 1998 governs owner changes to common elements. Knowing which pile each item sits in before you design saves a redesign later.
Step 3: Build the package management expects
Send everything at once. A package that comes back for one missing certificate goes back to the end of the queue. A typical Toronto application includes most of the following.
- WSIB does not require a homeowner to collect a clearance for their own home renovation, but condo corporations commonly ask for one. Anyone can download a contractor's clearance from WSIB's website without an account; check that it will not expire mid-job.
- More on what a certificate should show is in contractor insurance and WSIB coverage.
| Item | What it shows management | Who usually supplies it |
|---|---|---|
| Application form | Unit, scope, dates and the owner's signature | Owner |
| Scope of work and drawings | Layout, plumbing and electrical changes, flooring build-up, anything near structure | Contractor or designer |
| Certificate of insurance | Commercial general liability coverage; HomeStars reports Toronto buildings typically ask for $2 million or more | Contractor |
| WSIB clearance | That the business is registered with WSIB and up to date; clearances are valid for up to 90 days | Contractor |
| Trade licences | Licensed plumbers and electricians on that part of the work | Contractor |
| Schedule | Start and finish dates, daily hours, elevator and shut-off requests | Contractor |
| Deposit and fees | A refundable damage deposit, which HomeStars puts at $1,000 to $5,000 in Toronto, plus elevator fees | Owner |
| Permit, scan or engineer's letter | Required where the City or the building asks, for plumbing changes, coring or structural work | Contractor or engineer |
Step 4: Expect questions, conditions and inspections
Management or the board reviews the package, and plumbing, structural or flooring items may go to the building's engineer. The Condominium Authority of Ontario notes that some corporations require approved contractors, limit work to certain hours, ask for contractor insurance information and carry out inspections before and after the work.
Approval often arrives with conditions attached. Read them before signing a contract with dates in it: hallway and elevator protection, where debris goes, which days are off-limits, and who to call before any water shut-off. The CAO's guidance to owners also stresses booking the elevator in advance and keeping work outside quiet hours.
Step 5: Sign a section 98 agreement when common elements change
If the work alters a common element, approval is a legal agreement as well as a letter. The board approves by resolution, and you sign an agreement that allocates the cost and sets out repair, maintenance and insurance duties. It takes effect only when the corporation registers it against your unit's title, and it binds future owners of the unit.
Leave time for this in the schedule: a board resolution waits for a board meeting, and registration is a step the corporation completes on title. The law behind it is in condo renovation rules in Ontario.
Step 6: Keep the approval valid until the deposit comes back
Approval depends on how the job runs. Section 119 of the Act requires owners to take all reasonable steps to make sure their agents and employees, which includes the renovation crew, follow the declaration, by-laws and rules. Habits that keep a file clean:
- book every elevator slot in advance, including the final debris run;
- give management notice before any riser shut-off;
- photograph hallways, doors and the elevator cab before and after;
- ask for the post-inspection as soon as the work is done.
Why condo renovation applications get sent back
- An expired or missing insurance certificate or WSIB clearance.
- Drawings that do not show plumbing or electrical changes.
- No underlay specification for new floors; see condo flooring and acoustic underlay rules.
- A schedule that includes days or hours the rules prohibit.
- A new drain location with no scan or engineer's review.
- Work the CAO lists as unlikely to be approved: changes that affect the building's structural integrity, contravene the governing documents or affect other owners' safety.
Questions
When should I submit my condo renovation application?
Once your layout and main selections are settled, and before you commit to delivery dates for custom cabinetry or stone. Review time varies by building and by how often the board meets, so ask management how long their reviews usually take.
Can my building require me to use its approved contractors?
Some corporations do, according to the CAO. Rules have to be reasonable and consistent with the Act, the declaration and the by-laws (section 58(2)), and owners can amend or repeal a rule at a meeting called for that purpose.
Do I get the damage deposit back?
It is a refundable deposit, returned under the building's terms once the post-inspection finds no damage to hallways, elevators or other common areas. Read the terms before you pay and keep your own dated photos.
Does the board's approval let my contractor into the suite below?
No. Working from a neighbour's ceiling needs that owner's cooperation, and management usually coordinates it. If a drain or trap can only be reached from below, say so in the application so access can be planned.
Sources and further reading
- Condominium Authority of Ontario: Condo renovations
- Condominium Authority of Ontario: Condo Owners' Guide (July 2023)
- WSIB: Questions and answers, clearances
- HomeStars: How Much Do Renovations Cost in Toronto in 2026?
- Condominium Act, 1998, S.O. 1998, c. 19 (Ontario e-Laws)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





