Renovation contracts in Ontario: what to include

A renovation contract in Ontario must be in writing and, under the Consumer Protection Act, 2002, set out both parties' names and contact details, a fair description of the work and materials, itemized prices with taxes, the total, payment terms, and the start and completion dates. Beyond that minimum, a good contract attaches the estimate, names the sub-trades, assigns permits, sets a written change process, reserves the 10% Construction Act holdback and spells out the warranty.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

Why Ontario law requires a written renovation contract

Most kitchen and bathroom renovations are what the Consumer Protection Act, 2002 (CPA) calls future performance agreements: deals where the work, delivery or full payment happens after you sign. Above $50, these must be in writing, delivered to you, and contain the information listed in the Act's general regulation, O. Reg. 17/05. If you never receive a copy that meets those requirements, the Act lets you cancel within one year of entering the agreement.

Ontario has passed a replacement law, the Consumer Protection Act, 2023, which will repeal the 2002 Act on a date the province has not yet proclaimed. Until it takes effect, the 2002 Act and its regulation govern your contract, so check ontario.ca for the current rules before you sign.

The information Ontario requires in the contract

Section 24 of O. Reg. 17/05 lists what a future performance agreement must set out. Translated into renovation terms:

Required contents of a future performance agreement, applied to a renovation
Required itemWhat it looks like in a renovation contract
Your name, and the contractor's name and business nameThe legal company and its trade name, if they differ
The contractor's phone number and business address, plus other contact detailsA street address, not only a mobile number
A fair and accurate description of the goods and servicesRooms, scope, materials, models and finishes, or the drawings and specifications by reference
An itemized list of prices, including taxesSeparate lines for labour, materials, allowances and HST
Each additional charge that applies or may applyDisposal, permit fees or delivery, if billed on top
The total amount payableOne figure that matches the estimate
Terms and methods of paymentDeposit, milestones and accepted payment methods
Dates for commencement, ongoing performance and completionA start date and a completion date or schedule
Where the work is done and by whomYour address, and the name of any other firm the contractor says will perform part of the work
Restrictions, limitations and conditionsExclusions, site access, working hours
The date of the agreementSigned and dated copies for both sides

The regulation sets a floor. Ontario's own consumer guidance recommends more, and a well-run contractor will usually already include most of it.

  • The estimate, attached. Once an estimate is part of the agreement, the CPA stops the contractor charging more than 10% above it.
  • Permits. Who applies, who pays the fee, and a promise that construction will not start until the permit is issued.
  • Drawings and selections. Listed by date and revision, so 'what was agreed' always has an answer.
  • Sub-trades. Every trade contracted out and who pays it, plus the ECRA/ESA licence number of the electrical contractor.
  • Changes. Written, priced and signed before the work is done. See renovation change orders.
  • Payments. Deposit, milestone payments and the 10% holdback, with the trigger for each.
  • Insurance and WSIB. Certificates attached or referenced, with policy dates.
  • Site rules. Working hours, floor protection, dust control, parking and, in condos, elevator bookings.
  • Cleanup. Who removes debris during the job and at the end.
  • Warranty. Length, start date, what it covers and how to report a defect.
  • Disputes and early termination. How disagreements are escalated, and what each side owes if the contract ends early.

Signed at your kitchen table? You may have 10 days to cancel

Where you sign changes your rights. A contract negotiated or concluded in person anywhere other than the contractor's place of business, such as your home during an estimate visit, is a direct agreement under the CPA. For direct agreements over $50, you can cancel for any reason from the day you sign until 10 days after you receive your written copy, without a cancellation fee. Ontario notes that if work started during that window, you can still cancel but owe reasonable compensation for work and materials already provided.

Direct agreements also carry extra paperwork. They must be signed by both parties, show the date and place of signing and the names of the people who solicited, negotiated and concluded the deal, and include a prescribed statement of your cancellation rights near the front. Without a compliant copy, your right to cancel extends to one year. A contract signed at the contractor's own office is not a direct agreement, so this cooling-off right does not apply there.

What the Construction Act adds to any contract

Ontario's Construction Act applies whether your contract mentions it or not. Each payer on a contract under which a lien may arise must retain a holdback of 10% of the price of work and materials as they are supplied, until lien rights expire. An owner who keeps that holdback limits their exposure if the contractor fails to pay its subcontractors. Write the holdback and its release date into the payment schedule; holdbacks on renovation projects in Ontario explains the timing.

The Act's prompt payment rules shape invoicing too. Unless the contract says otherwise, the contractor issues proper invoices monthly, and the owner must pay within 28 days of receiving one or give a notice of non-payment, in the prescribed form, within 14 days. Since January 1, 2026, an invoice missing required details counts as proper unless the owner flags the deficiency in writing within seven days. Agree on an invoice schedule that suits a kitchen or bathroom job.

A last check before you sign

  • The estimate total and the contract total match, and HST is shown.
  • The deposit is modest; Ontario's consumer protection office recommends no more than 10%.
  • Start and completion dates are written in. If a contractor does not begin within 30 days of the agreed start date, the CPA lets you cancel before work begins.
  • Every drawing and selection sheet is listed by date.
  • Payment milestones are tied to work you can see, and the deposit and payment schedule leaves the holdback in place.
  • For major work, Ontario suggests having a lawyer review the contract before you sign.

Questions

Can a contractor charge more than the estimate in Ontario?

Not by more than 10%, if the estimate is part of your agreement. If the bill goes higher, the CPA lets you require the work at the estimated price. The exception is new or different work you ask for, which you and the contractor can price as an amendment.

Is a string of emails enough to count as the contract?

The CPA requires a written agreement containing the prescribed information and delivered to you. A scattered email thread rarely contains all of it, and it invites arguments later. Ask for one signed document that gathers the estimate, scope, dates and terms.

What if the contractor never shows up to start?

Under section 26 of the CPA, if the contractor does not begin within 30 days after the start date in the agreement, or a later date you agreed to in writing, you may cancel before work begins. If no start date was written in, the 30 days run from the date of the agreement.

Do I need a lawyer to review a renovation contract?

It is not required, but Ontario's consumer guidance recommends it for major renovation work. A lawyer can explain the payment, holdback and termination clauses and confirm that the cancellation rights are stated correctly.

Sources and further reading

  1. Consumer Protection Act, 2002, S.O. 2002, c. 30, Sched. A
  2. O. Reg. 17/05: General, under the Consumer Protection Act, 2002
  3. Construction Act, R.S.O. 1990, c. C.30
  4. Your rights when starting home renovations or repairs, Government of Ontario
  5. Better for Consumers, Better for Businesses Act, 2023 (Consumer Protection Act, 2023)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your kitchen renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.