A renovation in Ontario carries up to three layers of warranty. The Consumer Protection Act, 2002 deems every contractor to warrant that its services are of reasonably acceptable quality, and no contract clause can waive that. On top of it sit the contractor's written workmanship warranty, whose length and scope the contract sets, and the manufacturers' warranties on installed products, which often require registration. Tarion's new-home warranty does not cover renovations.

By the Purple Kitchen & Bath team · Updated · 4 min read · Photo: a Purple Properties project

Three layers of warranty on one renovation

When a tile cracks or a drain weeps a year after the job, the first question is which layer applies. Each comes from a different source and has its own time limit.

The warranties that can apply to a kitchen or bathroom renovation in Ontario
LayerWhere it comes fromWhat it coversTime limit
Statutory quality warrantyConsumer Protection Act, 2002, s. 9Services of reasonably acceptable quality; goods supplied carry the Sale of Goods Act's implied conditions and warrantiesA claim generally within 2 years of discovering the problem (Limitations Act, 2002)
Workmanship warrantyYour contractInstallation and workmanship defects, as the contract defines themThe period written in the contract, such as one year from completion
Manufacturer warrantyThe product maker's termsDefects in the product itselfSet by the maker, sometimes conditional on registration or proper installation

What Ontario law guarantees whatever the contract says

Section 9 of the Consumer Protection Act, 2002 deems the supplier under a consumer agreement to warrant that its services are of a reasonably acceptable quality. For goods supplied under the agreement, such as a vanity or a faucet the contractor provides, the implied conditions and warranties of the Sale of Goods Act apply. Any term that tries to negate or vary those protections is void, so a 'no warranty' or 'as is' line in a renovation contract does not remove them.

The Act does not put a number of years on 'reasonably acceptable quality'; it is judged on the facts of the work. What does carry a clock is the right to sue. Under Ontario's Limitations Act, 2002, the basic limitation period is two years from the day a claim is discovered, with an ultimate limit of 15 years from the act or omission behind it. Report defects in writing as soon as you find them.

Tarion does not cover renovations

Many Ontario homeowners know Tarion from buying a new home. Its warranty program applies to new homes, and Tarion states that the plan does not cover renovations to previously constructed components of a home. There is no government-backed warranty fund behind a kitchen or bathroom renovation, so a contractor's written warranty is only as strong as the business standing behind it.

Ontario's consumer guidance makes the same point plainly: check warranties carefully, but remember that a contractor's reputation and length of time in business matter more than the warranty itself.

What a written workmanship warranty should spell out

A one-line promise to 'stand behind our work' is hard to enforce. Ask for a clause that answers each of these:

  • Start date: the completion date or final walkthrough, not the date of final payment, which can drift.
  • Length: stated in months or years.
  • What is covered: workmanship and installation, described plainly.
  • Exclusions: normal wear, misuse, later alterations by others, and product defects that belong to the manufacturer.
  • How to claim: in writing, to a named contact, with an expected response time.
  • Product failures: who deals with the manufacturer when an installed product fails.
  • Transfer: whether the warranty passes to a buyer if you sell.

Register product warranties and keep one renovation file

Appliances, faucets, shower valves, toilets, cabinets and some tile and waterproofing systems come with their own warranties, and some makers require registration, proof of purchase or installation to their instructions before they will honour a claim. Read each warranty card while the boxes are still on site.

Then build one file, paper or digital: the signed contract and change orders, drawings, a selections list with model and serial numbers, receipts, permit and inspection records, and the ESA Certificate of Acceptance for the electrical work. Add the care instructions for each finish; caring for new finishes after a renovation explains why that matters for both looks and warranty.

Questions

Is a longer contractor warranty always better?

Only if the business will be there to honour it. Ontario's consumer guidance says a contractor's reputation and time in business matter more than a warranty or guarantee. Read what a long warranty actually covers before giving it weight.

Can a contract say the work comes with no warranty?

It can say so, but it will not remove the Consumer Protection Act's deemed warranty that services are of reasonably acceptable quality. Section 9 makes any term that tries to negate or vary that protection void.

Does a renovation warranty transfer when I sell the house?

Only if its terms allow it. Some contractor and manufacturer warranties follow the home and others end with the original owner. If a sale is likely within a few years, ask before you sign and keep the documents in a file you can pass to the buyer.

What should I do when I find a defect?

Write to the contractor promptly with photos, the date you noticed it and what you have done so far, such as shutting off water. Keep a copy, allow access for an inspection, and note the date: the basic limitation period in Ontario runs two years from discovery.

Sources and further reading

  1. Consumer Protection Act, 2002, section 9 (quality of services and goods)
  2. Limitations Act, 2002, S.O. 2002, c. 24, Sched. B
  3. Tarion 2024 Annual Report (what the new home warranty plan covers)
  4. Your rights when starting home renovations or repairs, Government of Ontario

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.