Renovations

Guides

Floating ribbed walnut vanity with black counter and faucet, lit mirror and marble-look walls and floor

Bathroom ventilation

Bathroom exhaust fans and ventilation

In an Ontario house, every bathroom needs mechanical exhaust: either an intake for the home's principal ventilation fan, or a supplemental fan rated at no less than 25 L/s (about 53 cfm) under Building Code Article 9.32.3.7, on a manual switch in the room. Size the fan at 1 cfm per square foot up to 100 square feet, duct it to the outdoors and never into the attic, and add a timer or humidity control so it runs long enough.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

Ontario's Building Code rules for bathroom exhaust

These rules sit in Section 9.32 of Ontario's 2024 Building Code, the part that covers houses and small buildings, so they apply most directly to detached houses, semis and townhouses. Condo towers fall under other parts of the code and the building's own system. For a renovation, ask your municipality how much of the current standard applies to the work you are doing.

Bathroom ventilation requirements in Ontario's 2024 Building Code
ArticleRequirement
9.32.3.7A supplemental exhaust fan rated at no less than 25 L/s in each bathroom or water-closet room that has no intake for the principal ventilation fan
9.32.3.7That fan is controlled by a manual switch in the room; if a dehumidistat or other automatic control is added, the manual switch must still start the fan whatever the control's setting
9.32.3.10Fan capacity rated to CSA C260 or HVI 916, measured at 25 Pa (0.1 inch of water column) for a fan ducted on one side
9.32.3.10A bathroom fan with less than 1 m of duct between it and the room: no louder than 2.5 sones under CSA C260, or 3.5 sones under HVI 915
9.32.3.11Ducts serving only a bathroom may be combustible if reasonably airtight and impervious to water, and exhaust ducts must not discharge into heated or unheated enclosed spaces
9.32.3.11Ducts through unheated space insulated to at least RSI 0.5; joints sealed with mastic, metal foil duct tape or the maker's sealant; ducts supported so they do not sag or crush

How many CFM your bathroom fan needs

HVI, the body that certifies fan ratings, gives two sizing methods. Up to 100 square feet of floor, allow 1 cfm per square foot, roughly eight air changes an hour under an 8-foot ceiling. Above 100 square feet, add up the fixtures: 50 cfm each for a toilet, a shower and a standard tub, and 100 cfm for a jetted tub. In Ontario, use whichever is larger, the HVI figure or the code minimum of 25 L/s, about 53 cfm.

Eight air changes an hour only works out with an 8-foot ceiling, so a 10-foot or vaulted ceiling needs proportionally more air. In a big ensuite, two smaller fans, one over the shower and one in the toilet room, often clear the air better than one large fan in the middle of the ceiling.

Sizing examples using the HVI method and the Ontario minimum
BathroomHVI calculationFan to specify
Powder room, about 20 sq ft20 x 1 = 20 cfmAt least 53 cfm; the code minimum governs
5 x 8 ft main bathroom, 40 sq ft40 x 1 = 40 cfmAt least 53 cfm; the code minimum governs
8 x 10 ft ensuite, 80 sq ft80 x 1 = 80 cfm80 cfm or more
Ensuite over 100 sq ft with tub, shower and enclosed toilet3 fixtures x 50 = 150 cfm150 cfm total, often split between shower and toilet room
Ensuite with a jetted tub and a separate shower100 + 50 = 150 cfm150 cfm or more

Ducting decides whether the fan actually performs

A fan's rating is true only at the static pressure it was tested at, 0.1 inch of water column for most bathroom fans. Long runs of flexible duct, crushed sections, extra elbows and a restrictive wall cap all add resistance, and real airflow can fall well below the box rating. The duct deserves as much attention as the fan.

  • End the duct outdoors at a wall or roof cap with a backdraft damper, never in the attic, a soffit cavity or a joist space.
  • Keep the duct at the full diameter of the fan's outlet, and the run as short and straight as the house allows; smooth rigid or semi-rigid duct moves more air than corrugated flex.
  • Insulate any run through a cold attic to at least RSI 0.5, about R-2.8. An uninsulated duct condenses moisture in winter and drips it back out of the grille.
  • Seal every joint with mastic or metal foil tape, not cloth duct tape, and hang the run so it cannot sag into a low spot that holds water.
  • Put the intake over or near the shower or tub and away from the door, so air is drawn across the room.

Humidity controls, timers and how long to run the fan

Most moisture damage in bathrooms comes from switching the fan off too soon. HVI suggests running it for about 20 minutes after a shower, and Health Canada advises keeping indoor relative humidity between 30% and 50%. A countdown timer switch or a humidity-sensing fan does this without anyone having to remember.

The code allows those automatic controls as long as the manual switch in the room can still start the fan regardless of the sensor. Many newer houses have a heat recovery ventilator whose exhaust intake sits in the bathroom; where it does, the code does not require a separate supplemental fan, though a dedicated fan over the shower can still clear steam faster.

A quiet fan gets used. Stay well inside the code's sone limit for an ensuite, and choose a fan whose airflow and sone figures come from HVI certification or CSA C260 testing rather than an unverified claim on the box.

Condos, basements and older houses need their own plan

In many Toronto condos the bathroom fan connects to the building's exhaust system or a shared shaft, and the condominium corporation controls changes to it. Ask the property manager before changing the fan's size or the duct, and expect approval to be needed for any new opening through an exterior wall. Condo bathroom ventilation and condo renovation rules in Ontario explain the approvals.

A basement bathroom usually vents through the rim joist to a wall cap; keep the run short and insulate it where it crosses cold space. In older Toronto houses with plaster ceilings and no fan at all, the route is the planning question: up through the attic to a roof cap, or along the joists to an exterior wall. Either way, settle the fan before tile and paint go up, because humidity does its damage behind the finishes first, and mirrors are part of the same problem; see fog-free bathroom mirrors.

Questions

Can a bathroom fan vent into the attic?

No. Ontario's Building Code says exhaust ducts must not discharge into heated or unheated enclosed spaces, and an attic is one. Warm, wet air released there condenses on the roof sheathing in winter. The duct has to end outside at a wall or roof cap.

Is an openable window enough without a fan?

Not in an Ontario house built to current Part 9 rules. A window with at least 0.09 m² of opening counts as natural ventilation outside the heating season, but heating-season ventilation must be mechanical, and nobody opens a bathroom window in January. Treat the window as a bonus.

Why does my bathroom fan drip water?

Usually it is condensation. Warm air cools inside an uninsulated duct running through a cold attic, and the water runs back to the grille. Insulating the duct to at least RSI 0.5, shortening the run and removing low spots normally cures it.

Does an enclosed toilet room need its own fan?

Yes. Ontario's code treats a water-closet room like a bathroom: if it has no principal ventilation intake, it needs its own fan rated at 25 L/s or more. HVI likewise calls for a fan or an openable window in an enclosed toilet room.

Sources and further reading

  1. Ontario 2024 Building Code Compendium, Part 9 (Section 9.32, Ventilation)
  2. HVI: Bathroom ventilation
  3. HVI: How much ventilation do I need?
  4. Health Canada: Reduce humidity, moisture and mould in your home

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.