
Bathroom renovations in Toronto
From powder rooms to full ensuite transformations, bathrooms that balance function, comfort and lasting style.
Every detail, from plumbing to the last tile
We handle the whole bathroom, from plumbing and permits to custom vanities, tilework and lighting. Whether you’re modernizing a tired ensuite, making the most of a powder room or turning a main bath into a retreat, the result is a space built for comfort and everyday function.
Smaller rooms leave less margin for error. Careful tile alignment, clean transitions and integrated storage are what make a bathroom feel finished.
“Function, beauty, and ROI — regardless of the size or space.”

Ensuite bathrooms
Primary ensuites with room to breathe: freestanding tubs, glass showers, double vanities and good light.

Showers & tubs
Walk-in and curbless showers, built-in benches and niches, frameless glass, and tub-showers finished in slab or large-format tile.
- Custom glass enclosures
- Rain heads and hand showers
- Steam showers

Vanities & storage
Custom and floating vanities, integrated basins, medicine cabinets and linen storage, sized to the room.

Powder rooms
Small rooms with big personality: feature wallpaper, statement mirrors and wall-hung fixtures that make the most of every inch.
Everything else that goes into it
One team plans, permits and builds it, and keeps you informed from start to finish.
Tile & flooring
Herringbone floors, large-format porcelain and slab walls, laid with careful alignment.
Fixtures
Brushed gold or matte black faucets, shower systems, smart toilets and accessories.
Lighting
Backlit mirrors, vanity lights and pot lights for a calm, even glow.
Plumbing & permits
New lines and drains, with permits and inspections handled for you, including in condos.
Comfort & accessibility
Curbless entries, built-in benches and grab bars, planned in without looking clinical.
Basement bathrooms
New bathrooms below grade, from powder rooms to steam showers.
Bathroom reveals
Filmed on our own job sites. Select a video to watch with sound.
Projects
From the gallery
Bathroom renovations guides
Know before you renovate your bathroom






More bathroom guides
- Curbless shower design
- Walk-in shower ideas
- Steam shower installation
- Freestanding tub bathroom design
- Double vanity bathroom layouts
- Bathroom layout options for common room sizes
- Accessible bathroom renovation
- Kids' bathroom renovation
- Basement bathroom renovation
- Bathroom lighting design
- Bathroom storage ideas
- Shower niche design
- Shower bench design
- Bathroom wallpaper: where it works
- Spa bathroom design at home
- Modern bathroom design
- Bathroom renovation in an older Toronto home
- Adding an ensuite to a bedroom
- Adding a powder room on the main floor
- Bathroom tile ideas
- Large-format porcelain tile in bathrooms
- Shower waterproofing systems
- Heated bathroom floors
- Bathroom exhaust fans and ventilation
- Bathroom vanity buying guide
- Floating vanities
- Wall-hung toilets with in-wall carriers
- Smart toilets and bidet seats
- Thermostatic and pressure-balanced shower valves
- Frameless glass shower doors
- Linear shower drains
- Grout types: cement, epoxy and urethane
- Marble bathrooms: what to know before you choose marble
- Bathroom faucet finishes: brushed gold, matte black and chrome
- Rain shower heads and hand showers
- How to keep a glass shower clean
- Bathroom flooring options
- Bathroom countertop materials
- Bathroom sink types: undermount, vessel and integrated
- Backlit bathroom mirrors
- Mosaic tile in bathrooms
- Wood-look tile in bathrooms
- Bathroom renovation cost in Toronto
- Every renovation guide
Common questions
Do you charge for consultations?
No. Our initial consultations are complimentary, and we’ll help you map out the best approach for your space.
How long does a bathroom renovation take?
Most renovations in the GTA take 6 to 16+ weeks, depending on the scope, complexity and any change orders. Condo bathrooms can also be shaped by building timelines.
Do I need a permit for my renovation in Ontario?
Most kitchen and bathroom renovations that move walls, plumbing or wiring need permits, and structural changes always do. We handle all permit applications and inspections for you.
Do you renovate condo kitchens and bathrooms?
Yes. We understand condo board requirements and the realities of vertical living, from tight timelines to complex plumbing coordination. Recent condo projects include a penthouse with two new bathrooms in downtown Toronto and a full condo renovation in The Beaches.
Do I need to move out during the renovation?
It depends on the scope of your project. We’ll talk it through with you during your consultation.
What warranty do you offer?
Every renovation comes with a one-year workmanship warranty.
We also help you receive and register the manufacturer warranties on installed products such as appliances, fixtures and materials, so you’re protected long after the project is done.

Plan your bathroom renovation
Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.


