
Shower design
Linear shower drains
A linear shower drain is a long, narrow channel, usually set along a wall or across the shower entry, that lets the whole floor slope one way instead of funnelling to a centre point. That single plane is what allows large-format tile or a stone slab on a shower floor and makes curbless entries practical. A standard channel connects to a 2-inch waste line and handles about 9 US gallons (34 litres) a minute.
One slope instead of four
A centre drain turns the shower floor into a shallow bowl, with four sloped triangles meeting at the grate. A linear drain tilts the floor like a ramp toward one edge. The usual fall is the same either way: Schluter's 2024 shower installation handbook slopes the mortar bed 1/4 inch (6 mm) per 12 inches (305 mm).
The numbers are easy to work out. In a shower 48 inches deep with the drain against the back wall, the entry end sits 1 inch higher than the drain; at 60 inches deep, 1-1/4 inches. Along the side walls the floor rises at that same rate, so the bottom row of wall tile is cut on a slight taper, or the wall tile stops above a base course that follows the slope. Decide which look you want before the tile is cut.
Where to put it: back wall, entry or fixture wall
Infinity Drain's specification course calls the back wall the most popular location, but each position solves a different problem. With a curb, a linear drain can run along any side of the shower.
- Back-wall and entry placement change how the floor is built in a curbless shower; curbless shower design walks through the height budget. In a condo, the depth of the concrete slab and the building's coring rules often decide the location; see condo tub to shower conversion.
| Location | Why choose it | Watch for |
|---|---|---|
| Back wall | Water runs away from the door; the drain is out of sight under the spray | In a curbless shower the floor must drop toward it, so the subfloor is recessed |
| Shower entry | Catches water before it reaches the bathroom floor | Drainage openings should span the full width of the entrance; the drying area may need secondary drainage |
| Fixture wall, where a tub drained | Can reuse the old drain location in a tub-to-shower conversion | Confirm the outlet can be reached without moving joists |
| Wall to wall in a wet room | The whole room floor falls to one line | Waterproofing has to cover every area the water can reach |
Sizing: length, flow and outlet
Size the drain for the water you plan to run, not the shower's footprint. Infinity Drain lists standard linear drains at up to 9 US gallons a minute on a 2-inch waste line, and high-flow versions at about 21 gallons a minute on a 3-inch line. One rain head and one hand shower running together at Canada's new federal cap of 7.0 L/min each add up to 14 L/min, about 3.7 gallons a minute, well inside a standard drain. Body-spray systems are where the sums start to matter; rain shower heads and hand showers covers flow per outlet.
Length comes two ways. Site-sizable channels are cut on site to fit wall to wall, while fixed-length channels arrive welded and pre-pitched and will not stretch if a wall lands out of position. Running the channel wall to wall keeps the floor a true single plane; a shorter channel leaves corners that need extra shaping to drain.
Tile-in or metal grate
The grate is the only part you see, and there are four common kinds. Infinity Drain describes them this way, and notes that every type lifts out for cleaning.
- Tile insert: a tray that takes the floor tile itself, up to 3/4 inch thick, leaving a 1/4-inch gap along the edges for water. The drain almost disappears.
- Wedge wire: grade 316 stainless steel slots, rated up to 5,000 lb.
- Perforated: grade 304 stainless steel with a hole pattern; usually the least expensive.
- Solid: a plain cover with a 1/4-inch gap on all sides, available in glass.
How the waterproofing connects to the drain
The drain is where most shower leaks start, so how the membrane meets it matters more than the grate. Older clamping drains sandwich a pan liner between two mortar beds, the traditional water-in, water-out method. Bonded systems give the channel a flange, typically about 1 inch wide on all four sides, that a sheet or liquid membrane bonds to, with the tile set directly on top; there is no liner to clamp, so a coupling joins the outlet to the waste pipe.
Either way, test before tiling. Schluter's handbook strongly recommends a water test, waiting at least 24 hours after the membrane is installed. Shower waterproofing systems compares the membranes themselves, and the drain's single slope is what lets large-format porcelain tile run across the shower floor uncut.
Questions
Is a linear drain harder to clean than a centre drain?
Not usually. The grate lifts out and hair collects in the channel or its strainer, where it is easy to reach. A tile-insert grate hides the drain best but needs the same occasional lift-and-rinse.
Can a linear drain go in a shower with a curb?
Yes. A curb lets the drain run along any side, and the single slope still allows large tile on the floor. Curbless showers simply depend on it more.
How long should a linear drain be?
For entry and curbless placements, as long as the opening is wide, ideally wall to wall. Against the back wall, wall to wall is still the cleanest choice because it keeps the floor in one plane.
Does a linear drain need a bigger pipe?
A standard channel connects to a 2-inch waste line, which handles a typical head and hand shower. High-flow body-spray systems may call for a high-flow channel on a 3-inch line, which the plumber confirms at rough-in.
Sources and further reading
- Infinity Drain via BNP Media: Linear drain system specification 101
- Schluter-Shower System Installation Handbook (10/2024)
- Energy Efficiency Regulations, 2016 (SOR/2016-311): showerheads
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





