
Kitchen appliances
Gas vs induction cooktops
Induction heats the pan itself, delivering about 85% of its energy to the cookware against roughly 32% for gas, and it adds no combustion by-products to your kitchen air. Gas offers a visible flame, works with any pot and suits open-flame techniques such as charring. In an Ontario renovation the house often decides: induction usually needs a dedicated 240-volt circuit of 40 or 50 amps, while gas piping must be installed by a TSSA-registered contractor.
Gas and induction compared point by point
Both cook well in skilled hands. The differences that matter in a renovation are energy use, indoor air, cookware and the service each one needs behind the wall.
| Question | Gas cooktop | Induction cooktop |
|---|---|---|
| Share of energy reaching the pot | About 32% | About 85% |
| Effect on indoor air | Burns fuel; gas stoves are a source of nitrogen dioxide | No combustion; cooking fumes still need a hood |
| Cookware | Any pot or pan | Must have a magnetic base |
| Who installs the supply | TSSA-registered contractor with a certified gas technician | Licensed Electrical Contractor, with an ESA permit |
| Typical supply | Gas line sized to the appliance | Dedicated 240 V circuit, commonly 40 or 50 A |
| Heat-up speed | Fast, with a flame you can see | Reaches temperature more quickly |
| Heat lost to the room | A lot, around the pan | Little, since the pan is the heat source |
| During a power outage | Depends on the model: check the manual for manual lighting | Will not work |
Efficiency and speed: what the numbers mean
Induction wastes far less heat. The U.S. ENERGY STAR program, in its award for residential induction cooktops, puts conventional gas cooktops at about 32% efficiency and electric resistance elements at 75% to 80%, while induction transfers energy at about 85% because the cookware itself is warmed by the magnetic field.
Two practical effects follow. Water boils faster, and ENERGY STAR notes that induction reaches temperature more quickly and shortens cook times. Less heat also spills into the room, which reduces the load on air conditioning in summer, a real difference in a compact condo kitchen.
Running cost is a separate question from efficiency, because it depends on what you pay for natural gas and for electricity, which change over time. Efficiency tells you how much energy is wasted; your utility bills decide what that energy costs.
Indoor air: a gas cooktop needs a hood that vents outside
Health Canada lists gas appliances, including stoves, among the main sources of nitrogen dioxide in homes, a gas that can reduce lung function and make asthma worse. Its advice is specific: make sure a gas stove has a range hood fan that vents to the outside, run it while cooking, and cook on the back burners, which helps direct nitrogen dioxide and other gases toward the exhaust.
Induction removes the combustion part of the problem but not cooking fumes. Searing, frying and boiling still release grease, moisture and particles, so a properly ducted hood is worth planning with either cooktop. Duct routes, fan capacity and make-up air are covered in range hood venting for a kitchen renovation. Condo kitchens that cannot duct outside face their own limits; see recirculating range hoods for condo kitchens.
Ontario rules: gas work and electrical work are licensed separately
In Ontario, neither cooktop is a do-it-yourself hookup for a contractor without the right licence. Gas is regulated by the Technical Standards and Safety Authority (TSSA): under Ontario law, work on fuel-fired appliances must be carried out by TSSA-registered contractors, who are required to employ TSSA-certified gas technicians. TSSA offers an online lookup tool to check that a heating fuel contractor is registered. Running a new line to an island, moving a range or capping a line when you switch to induction all count as gas work.
Electrical work is regulated by the Electrical Safety Authority (ESA). By law, only a Licensed Electrical Contractor (LEC) can be hired to do electrical work on a home in Ontario, and the LEC should file the electrical permit as part of the job; ESA advises asking for it to be listed on the estimate. ESA also points out that general contractors are not licensed to do electrical work themselves, so ask any renovator who their licensed electrician is.
Electrical capacity: the hidden question with induction
The cooktop is rarely the expensive part of switching to induction; the circuit can be. Manufacturers' installation instructions for 30- and 36-inch induction cooktops commonly call for a dedicated 240-volt circuit of 40 amps, and some models specify 50 amps. Always size the circuit to the exact model's manual.
In a house with an older or smaller electrical service, the electrician will need to confirm the panel has the capacity and the space for that circuit alongside everything else a new kitchen adds: dishwasher, microwave, wall oven and island receptacles. If it does not, a panel or service upgrade joins the scope. Panel capacity, dedicated circuits and the ESA process are explained in electrical upgrades in a kitchen renovation.
Cooking style: who tends to prefer each
Cooks who prefer gas usually value the visible flame, instant visual feedback, round-bottomed woks and charring peppers or tortillas directly over a burner. Gas also works with every pot you own.
Induction suits cooks who want fast boiling, very low steady simmers and a flat glass top that wipes clean; spills are less likely to bake on, because the glass warms only through contact with the pan. Cookware must be magnetic: if a fridge magnet sticks firmly to the base, it will work. Cast iron, enamelled cast iron and many stainless steel pans qualify; plain aluminium, copper and glass do not.
The absence of an open flame is one reason some households with young children choose induction. More on planning induction into a new kitchen is on induction cooktops in a kitchen renovation.
The verdict: induction or gas?
Let your cooking habits pick the technology, then let the house confirm it can supply it.
- Choose induction if you want the most efficient cooktop, cleaner indoor air, a top that wipes clean, fast boiling, or there is no gas supply to the kitchen, as in condo suites without gas service.
- Choose gas if you cook with a wok or open flame, want to keep every pan you own, the house already has gas at the range, and you will install and use a hood that vents outdoors.
- Check before you decide: panel capacity for induction, and the gas line route for a range moving to an island.
Questions
Do I need a permit to switch from a gas range to induction?
The new 240-volt circuit is electrical work, so a Licensed Electrical Contractor should file an ESA permit for it. Disconnecting and capping the old gas supply is gas work and must be done by a TSSA-registered contractor. Your renovation contract should say who arranges each.
Will my cast-iron pans work on an induction cooktop?
Yes. Cast iron and enamelled cast iron are magnetic and work very well on induction. Lift them rather than sliding them, since a rough base can scratch the glass top.
Does a gas cooktop need a stronger range hood than induction?
A gas cooktop adds combustion gases to normal cooking fumes, which is why Health Canada specifically advises a hood that vents outdoors and is run while cooking. Hood size depends on the cooktop's output and layout, so plan it with the appliance, not after.
Can I run a gas line to a new kitchen island?
Usually, if the gas pipe can be routed through the floor below the island. The work must be done by a TSSA-registered contractor, and the island will need a ventilation plan, such as a ceiling-mounted hood, before the gas cooktop is chosen.
Sources and further reading
- ENERGY STAR: 2021 Emerging Technology Award, residential induction cooking tops
- Health Canada: Nitrogen dioxide in indoor air
- TSSA: Repeat offender convicted of unlicensed gas appliance work in Ontario homes
- Electrical Safety Authority: Get a permit
- Electrical Safety Authority: Working with general contractors
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides




