Do you need a permit for a bathroom renovation in Toronto

Not if the bathroom keeps its layout. The City of Toronto exempts repairing and replacing plumbing fixtures, so a new vanity, toilet, tub and tile in the same positions need no permit. Moving a toilet or drain, adding a shower or a second sink, building a new ensuite or powder room, or putting a bathroom in the basement is new plumbing, and that needs a permit with a rough-in and a final inspection. In a one- or two-unit house the fee is charged per fixture, and a plumbing permit needs no drawings.

By the Purple Kitchen & Bath team · Updated · 4 min read · Photo: a Purple Properties project

Which bathroom projects need a permit in Toronto?

Ask one question first: is any drain or fixture moving, or being added? The City's own exemptions and triggers sort common bathroom scopes like this.

Bathroom scopes and the Toronto permit each one needs
Bathroom projectPermit?Why
Retile, new vanity, new toilet on the same flangeNoReplacing plumbing fixtures is exempt
New tub or shower over the existing drainUsually noFixture replacement, if the drain, trap and vent stay as they are
Toilet moved, shower relocated, or a tub swapped for a shower on a new drainYesInstalling or modifying plumbing
Second sink added to make a double vanityYesA new fixture on the drain and supply
New ensuite or powder roomYesNew plumbing, and usually new walls
Basement bathroomYesBasement finishing is exempt only with no new plumbing
Backwater valve addedYes: a standalone drain permitNo plans needed in a one- or two-unit house
Heated floor, lighting or fan wiringNot a City permit itemFile an ESA notification for the electrical work

Same layout, new finishes: the City stays out of it

A refresh that keeps the toilet on its flange, the vanity on its drain and the tub or shower in its alcove is fixture replacement, and Toronto exempts it. Two jobs that often ride along are exempt too in a house: adding or replacing insulation, and replacing a window in its existing opening without changing its size or support.

The grey zone is the tub-to-shower conversion. A shower base set over the old tub drain is close to fixture replacement; moving the drain to the centre of a new base, or changing the trap and vent, is modifying the plumbing system. Settle which one you have before the tub comes out. Tub-to-shower conversion covers the design side, and condo owners should read condo bathroom renovation in Toronto, since the corporation's rules and shared risers apply first.

Moved drains and added fixtures: what the plumbing permit covers

Every new or relocated fixture needs a trap, a drain sized and sloped to the stack, and a vent that protects the trap seal, all under Part 7 of the Ontario Building Code. That is why a toilet moved two feet is rarely a two-foot job: the new drain may have to cross floor joists, and its vent has to join the existing system before the walls close.

Toronto's 2026 fee schedule charges $23.20 per plumbing fixture in a single-family dwelling and $30.94 in other buildings, and the City's minimum fee of $214.79 applies to all work. For a one- or two-unit house, the City's Plumbing Data Sheet replaces drawings: no plans are required unless the project includes a reverse-sloping driveway. Plumbing upgrades during a bathroom renovation explains drains, venting and supply in detail.

Two plumbing inspections bracket the work

Toronto lists a rough-in inspection of the water supply, drains, waste and vents, called when the piping is complete and ready for testing, and a final inspection once the fixtures are installed. Inspectors attend within two business days of a request.

The rough-in carries the most weight in a bathroom because everything after it hides the pipes: backer board, membrane, tile. A tile setter booked for the morning after rough-in, before the inspection has happened, is a common way for a bathroom schedule to slip. At the end, the owner books the final inspection, which closes the permit.

A new ensuite or powder room is a building permit, not only plumbing

Carving an ensuite out of a bedroom, or a powder room out of a closet, adds walls as well as fixtures, and adding or removing walls is on the City's permit list. The plumbing permit then follows as a related permit, applied for after the building permit submission.

A new bathroom also needs exhaust. Section 9.32 of the Ontario Building Code governs mechanical ventilation in houses, and Toronto points applicants whose projects include HVAC elements to its Residential Mechanical (HVAC) guide. The wiring for the fan, lights and any heated floor is filed separately with the Electrical Safety Authority. Design detail is in adding an ensuite to a bedroom and adding a powder room on the main floor.

Basement bathrooms add a drain permit question

The City exempts basement finishing only when there is no new plumbing, so a basement bathroom always needs a permit. If the plan includes a backwater valve, that needs its own standalone drain permit in a one- or two-unit house, with no plans required, and the City notes that a valve designed to sit normally closed is prohibited in a building drain or sewer.

When a backwater valve and sump pump go in, the City also asks for a Consent to Enter form, which Toronto Water uses to determine eligibility for its Basement Flooding Protection Subsidy Program. See basement bathroom renovation for layout and drainage options.

Questions

Do I need a permit to swap my old tub for a new one?

Not if the new tub goes into the same alcove on the same drain, because Toronto exempts replacing plumbing fixtures. A freestanding tub whose drain lands somewhere new is new plumbing and needs a permit.

How much does a bathroom plumbing permit cost in Toronto?

In 2026 the City charges $23.20 per fixture in a single-family dwelling, but its $214.79 minimum fee applies to all work, so a three- or four-fixture bathroom is billed at the minimum. Fees are adjusted each year, so check the current schedule.

What does the inspector check at the plumbing rough-in?

The new water supply, drain, waste and vent piping, while it is still exposed and ready for testing. Nothing gets covered until it passes. The final inspection follows once the fixtures are in.

Does the City need drawings for a bathroom plumbing permit?

Not for a one- or two-unit house, unless the project includes a reverse-sloping driveway; the Plumbing Data Sheet is enough. Other residential buildings need drawings of the plumbing layout on each floor, and a new bathroom that adds walls needs building permit drawings as well.

Sources and further reading

  1. When do I need a building permit? (City of Toronto)
  2. Standalone plumbing and drain permits (City of Toronto)
  3. When to call for inspection of small buildings (City of Toronto)
  4. Backwater valve permit guide (City of Toronto)
  5. Interior alterations: application guide (City of Toronto)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.