
Countertop costs
Quartz countertop cost
Installed quartz countertops cost about $57 to $130 per square foot in Ontario on Home Depot Canada's published price list, and $75 to $150 across entry, mid and premium tiers in Builders Ontario's October 2026 survey. RenoQuotes' 2026 guide runs higher, at $110 to $180, and puts a typical kitchen with 30 to 40 sq ft of counter at roughly $3,300 to $7,200 installed. Cut-outs, edge upgrades, waterfall ends and 13% HST come on top.
Three current price sources for installed quartz
Quartz is quoted per square foot of finished top, templated, fabricated and installed. Three current Canadian sources bracket the market, and the differences mostly come from what each counts in the base price. Builders Ontario's figures come from a Southern Ontario fabricator, the same regional market that serves Toronto kitchens.
| Source | Installed per sq ft | What the base price includes |
|---|---|---|
| Home Depot Canada, Ontario pricing | $57 to $130 | Countertop, labour, edging, one sink and one faucet cut-out; removal of the old top extra |
| Builders Ontario, October 2026 | $75 to $150 across three tiers | 2 or 3 cm quartz, eased edge, sink cut-out, templating and delivery from a Southern Ontario fabricator |
| RenoQuotes, September 2026 | $110 to $180 | Measurement and installation |
What moves quartz from entry to premium pricing
The pattern on the slab is the biggest single factor. Builders Ontario's October 2026 tiers:
- Entry, $75 to $90 per sq ft: solid colours and fine-grain patterns, often from importers and house brands.
- Mid-tier, $95 to $115: subtle veining and popular whites from major brands.
- Premium, $120 to $150: marble-look, book-matched and heavily textured slabs.
- Thickness: 2 cm quartz costs about 15% to 20% less per foot, but it needs a plywood sub-top or a built-up edge, which uses most of the saving; 3 cm is the usual default.
- Layout: a long island or a matched-vein layout can need an extra slab or a carefully placed seam, and Builders Ontario lists premium seam matching at $150 to $300.
Extras that sit outside the per-foot price
Quotes that look alike per foot can end up a thousand dollars apart once the extras are added. A full-height quartz backsplash, like the one behind the professional range in the Old Milton Victorian kitchen, is priced per square foot like the counter itself; see full-height slab backsplash.
| Extra | Typical charge |
|---|---|
| Undermount sink cut-out and polish (one usually included) | $150 to $300 |
| Cooktop cut-out | $100 to $200 |
| Faucet, soap dispenser or outlet hole | $25 to $50 each |
| Edge profile upgrade | $10 to $40 per linear foot |
| Waterfall end on an island | $900 to $2,000 each |
| 4 in. quartz backsplash strip | $25 to $40 per linear foot |
| Removal and disposal of old tops | $250 to $600 |
| Overhang support brackets | $60 to $150 each |
| Minimum job charge | $1,200 to $2,000 |
A whole kitchen, priced: a worked example
Builders Ontario prices an L-shaped kitchen with an island, 58 sq ft of mid-tier 3 cm quartz, at $6,090 for the counters alone. Add an edge upgrade on the island, a prep sink cut-out, four holes, a 4 in. backsplash strip, removal of the old laminate and overhang brackets, and the total reaches $7,990 before HST, about $9,030 with 13% HST. The plumber's disconnect and reconnect, $250 to $500, is usually billed separately.
To estimate your own square footage, remember a standard counter is about 25.5 in. deep, so every 10 ft of run is roughly 21 sq ft; add the island's length times its width. Waterfall ends, like the islands in the sage green kitchen and the Old Milton kitchen, add their own line; see waterfall kitchen islands.
How quartz compares on price with other countertops
On Home Depot Canada's Ontario installed price list, quartz sits in the middle of the stone-look options:
- Laminate: $23 to $26 per sq ft
- Solid surface: $51 to $99
- Natural stone (granite, marble, quartzite): $51 to $114
- Quartz: $57 to $130
- Ultra-compact surfaces such as Dekton: $81 to $149
Questions
Why do quartz quotes for the same kitchen differ so much?
Usually because of the tier of slab, the thickness and the extras each quote includes. One shop may include removal, two cut-outs and an upgraded edge while another lists them separately. Ask each to price the same slab, thickness, edge and cut-outs before comparing.
Does the countertop price include the sink and faucet?
No. The price normally includes cutting and polishing the opening, not the fixtures. The sink and faucet are bought separately, and Builders Ontario notes that the plumbing disconnect and reconnect, $250 to $500, is usually done by others.
What does quartz cost for a single bathroom vanity?
More per square foot than in a kitchen, because fabricators charge a minimum. Builders Ontario puts the typical minimum at $1,200 to $2,000, so a small vanity top rarely gets the per-foot rate. Using an offcut or adding the vanity to a kitchen order can help.
Sources and further reading
- Home Depot Canada: Cost to Install a Kitchen Countertop
- Builders Ontario: Quartz Countertop Cost in Ontario (2026)
- RenoQuotes: Kitchen Renovation Cost in Canada in 2026
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





