Renovations

Guides

Marble-look porcelain shower with two black hand showers, rain heads and a black bench beside a toilet

Paying for a renovation

Renovation financing options in Canada

Most Canadians pay for a kitchen or bathroom renovation from savings, a home equity line of credit (HELOC), a home equity loan or refinance, or an unsecured personal loan or line of credit. A HELOC can reach 65% of your home's appraised value and usually carries a lower rate than unsecured credit, but the house secures it. Personal loans run $100 to $50,000 over 6 to 60 months. The federal Canada Greener Homes Loan closed to new applications in October 2025.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: a Purple Properties project

The main ways to finance a renovation, side by side

Each option trades cost against speed, flexibility and risk. The limits below come from the Financial Consumer Agency of Canada (FCAC) and the City of Toronto; rates change often, so compare current offers in writing before you sign anything.

Renovation financing options in Canada, 2026. Sources: FCAC home equity, HELOC, mortgage and personal loan pages (October 2025); City of Toronto HELP (November 2026); Builders Ontario (November 2026).
OptionHow muchRate and repaymentSet-up costs and risk
Home equity line of credit (HELOC)Up to 65% of the home's appraised valueUsually variable, based on the lender's prime rate; interest-only payments allowedAppraisal, legal, title search and admin fees; the home secures the debt
Home equity loanLump sum of up to 80% of the home's valueFixed payments on a set scheduleSimilar fees; cannot be re-borrowed once repaid
Second mortgageUp to 80% of appraised value, minus the mortgage balanceFixed or variable, generally above first-mortgage ratesTwo mortgage payments to carry
Refinance, or blend-and-extendA new or extended mortgage on the same homeBreaking a closed mortgage early usually means a penaltyAdmin, appraisal, reinvestment and discharge fees
Personal loan$100 to $50,000 over 6 to 60 monthsDepends on credit; legal cap of 35% a year including feesSecured or unsecured; quick to arrange
Unsecured line of creditLimit set by income, debts and credit scoreHigher than a HELOC, sometimes by several pointsNo claim on the house; fast set-up
Toronto Home Energy Loan ProgramUp to $125,000, capped at 10% of assessed valueFixed 3.83% over 5 years to 5.12% over 20 years, on the property tax bill2% admin charge; energy and water upgrades only

Borrowing against your home: HELOC, loan or refinance

Home equity is the home's value minus what you still owe on it. FCAC sets out the thresholds: a standalone HELOC needs more than 35% equity, a HELOC combined with a mortgage needs 20%, and you must pass the lender's stress test.

Example: on a $1,000,000 Toronto house with $550,000 left on the mortgage, an 80% ceiling on total borrowing is $800,000, leaving up to $250,000 of room above the mortgage. A $70,000 kitchen fits inside that limit easily; the real question is whether the payment fits your income.

A HELOC suits a renovation paid in stages, because you draw only what each stage needs and pay interest only on what you have drawn. FCAC's warnings apply in full: lenders can change the rate at any time and must tell you in writing within 30 days, interest-only payments never reduce the debt, and failing to repay can cost you the house.

Refinancing makes the most sense at renewal. Breaking a closed mortgage mid-term usually triggers a prepayment penalty that FCAC says can cost thousands of dollars, plus administration, appraisal, reinvestment and discharge fees. A blend-and-extend, which blends your current rate with a new term's rate, typically avoids the penalty. Homeowners usually 55 or older can also use a reverse mortgage, up to 55% of appraised value less the mortgage balance, though FCAC notes its rates are generally higher than a HELOC's and interest keeps accumulating.

Personal loans and lines of credit: faster, smaller, dearer

Unsecured borrowing is quicker to arrange and leaves the house out of it, but it costs more. FCAC's own example shows how much the rate matters on a $2,000 loan repaid over 36 months:

  • At 8.99%: $2,304 repaid in total
  • At 19.99%: $2,700
  • At 34.99%: $3,312

Choosing between a loan and a line for the job in front of you

Scale FCAC's example to $25,000 over the same three years and the gap between 8.99% and 19.99% is about $5,000 in interest. Personal loans top out around $50,000, which suits a bathroom or a modest kitchen better than a large project.

Builders Ontario's November 2026 financing guide draws the practical line: a fixed-rate personal loan can be the better fit for a single fixed-price job, while a line of credit suits costs that arrive in stages. Its rate comparison is the catch: an unsecured line usually costs more than a HELOC, sometimes by several points, so the cheapest option is the one secured by the house.

Government and utility programs: what is open in 2026

Federal renovation lending has narrowed. Natural Resources Canada lists the Canada Greener Homes Loan as closed, with its funding fully committed, and CMHC says the loan portal closed to new applications as of October 2, 2025. The companion Canada Greener Homes Grant closed to new applicants in February 2024. What remains is mostly local and aimed at energy:

  • Toronto's Home Energy Loan Program (HELP) is open, according to the City's November 2026 page. It lends up to $125,000, capped at 10% of the property's current value assessment, at fixed rates valid until December 31, 2026, from 3.83% over five years to 5.12% over 20 years, plus a 2% administrative charge, repaid through the property tax bill. Eligible work includes heat pumps, windows and doors, insulation, water heaters, drain-water heat recovery and toilet replacements; cabinets and tile are not on the list.
  • The Home Renovation Savings Program, run by Enbridge Gas and Save on Energy, lists rebates for insulation, windows and doors, heat pumps, heat pump water heaters, smart thermostats and solar, with nothing for kitchen or bathroom finishes. Its site warns of scammers posing as participating contractors.
  • Federal tax credits for accessibility work and for creating a secondary unit return part of the cost at tax time; they are explained in HST on renovations in Ontario.

Match the borrowing to the payment schedule

Interest starts the day money leaves the account, so draw in step with the contract's payment schedule rather than all at once. Builders Ontario estimates that drawing a $50,000 job in stages over four months, instead of up front, saves about $350 in interest, and recommends paying principal from the first month with a payoff date set before the first draw.

Questions

Is a HELOC or a personal loan better for a bathroom renovation?

A HELOC usually costs less in interest and suits staged payments, but it takes longer to set up, carries appraisal and legal fees, and is secured by your house. For a smaller fixed-price job, a fixed-rate personal loan can be simpler. Compare total interest and fees over the time you will really take to repay.

Is there a federal renovation loan in 2026?

Not for general kitchen or bathroom work. The Canada Greener Homes Loan, which financed energy retrofits, closed to new applications in October 2025 after its funding was fully committed. Check Natural Resources Canada and CMHC directly before relying on any new program.

Can Toronto's HELP pay for a kitchen renovation?

Only for its eligible energy and water items, such as a heat pump, new windows, a water heater or a toilet replacement, not cabinetry or counters. The loan is capped at 10% of your property's current value assessment or $125,000, whichever is less.

Should the amount I borrow include HST?

Yes. HST at 13% applies to the whole contract, so borrow on the price with tax plus your contingency. Otherwise the shortfall lands at the end of the job, when the final payment is due.

Sources and further reading

  1. Financial Consumer Agency of Canada: Borrowing money using home equity
  2. Financial Consumer Agency of Canada: Home equity line of credit
  3. Financial Consumer Agency of Canada: Personal loans
  4. City of Toronto: Home Energy Loan Program (HELP)
  5. CMHC: Canada Greener Homes Loan (portal closed October 2, 2025)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your kitchen renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.