Renovations

Guides

Navy island with wooden stools and grey enamel pendants in a white kitchen, seen from the family room

Kitchen costs

Kitchen island cost

A standard 24 x 72 in. kitchen island with mid-grade cabinets and a quartz top costs about $7,000 to $10,000 installed, according to Builders Ontario's October 2026 Ontario figures, before HST. A sink, cooktop or waterfall end is priced on top: drain and vent plumbing to the island adds $800 to $1,800 where a basement sits below, and a quartz waterfall end adds $900 to $2,500 per side. GTA labour generally runs above those Central Ontario prices.

By the Purple Kitchen & Bath team · Updated · 4 min read · Photo: a Purple Properties project

What a standard 6 ft island costs, part by part

Builders Ontario prices one common island: 24 x 72 in., with drawers at both ends, finished back and end panels, and room for three stools. Most of the money sits in two lines, the cabinets and the top.

The cabinet figure is consistent with per-foot pricing. At Builders Ontario's base-cabinet rates, 6 ft of island boxes runs about $1,380 at builder grade, $2,280 mid-grade and $5,400 at luxury grade before the finished back, end panels and extra drawers an island needs, which helps explain why the island figure starts at $3,000. A deeper island with a full seating overhang uses more quartz and more hidden steel brackets, at $60 to $150 each.

Standard kitchen island, 24 x 72 in., before HST. Source: Builders Ontario, Kitchen Island Size and Clearances (Ontario prices, October 2026).
PartCostWhat it includes
Cabinets, mid-grade$3,000 to $4,500Supplied and installed; drawers at both ends; finished back and end panels
Countertop, mid-tier quartz$2,400 to $3,000Fabricated and installed
Overhang brackets, receptacle and three stools$800 to $1,500Combined figure
Total$7,000 to $10,000Before a sink, cooktop or upgrades

What a sink, cooktop, power or lighting adds

Working parts cost more in an island than against a wall, because pipes, ducts and wires have to reach the middle of the room through the floor or the ceiling.

The spread between the plumbing figures reflects what each job includes. A drain and vent dropped into an unfinished basement is the low end; moving the main sink, with the dishwasher and supply lines, is the high end, and Builders Ontario prices rerouting a vent stack at $1,500 to $3,000 on its own. Placement trade-offs are covered in kitchen sink placement.

Island add-ons, before HST. Sources: Builders Ontario island, kitchen renovation and lighting guides (October 2026) and RenoQuotes (2026).
Add-onTypical costSource and condition
Drain and vent for an island sink$800 to $1,800Builders Ontario; plumber working from a basement below
Moving the main sink into the island$2,500 to $5,500 extraRenoQuotes, 2026
Sink moved to the island in a layout-change kitchen$4,500Builders Ontario reference kitchen
Pop-up receptacle in the counter$250 to $500Builders Ontario
Ceiling-mounted island hood, ducted through the ceiling$800 to $3,000Builders Ontario
Downdraft vent$1,200 to $3,500, plus the duct under the floorBuilders Ontario
Pendant over the island, fixture supplied by youAbout $200 each to install ($100 to $300)Builders Ontario, on a roughed-in box

Waterfall ends and premium island tops

A waterfall end is priced per side, and the material sets the price more than the island's size. Builders Ontario's Southern Ontario fabricator figures for October 2026:

  • Quartz, solid or light pattern: $900 to $1,600 per side
  • Quartz, veined and matched: $1,400 to $2,500 per side
  • Granite or quartzite: $1,800 to $3,500 per side
  • Porcelain or sintered slab: $2,000 to $4,000 per side

One 7 ft island top, priced three ways

For a 7 ft island in mid-tier quartz, the same guide prices the top alone at about $2,600, $3,800 to $4,500 with one waterfall end and $5,000 to $6,500 with two. Skipping the finished cabinet end behind a waterfall credits $150 to $400 back, and a simpler slab end without a mitred corner costs $500 to $900.

Veined slabs often need a second slab so the pattern can run over the edge, which is where waterfall budgets climb; waterfall kitchen islands explains the slab layout. The sage green kitchen in Toronto and the Victorian kitchen in Old Milton both have quartz waterfall islands.

Island costs with no reliable published GTA price

Some island costs depend so much on the house that published guides give no dependable GTA figure. Treat these as items to be quoted on site rather than estimated from a table:

  • Under-cabinet and in-island lighting. Builders Ontario notes that no Ontario contractor it checked publishes a price for under-cabinet lighting.
  • Plumbing to an island in a condo. Drains through a concrete slab depend on the building's structure and the condominium's rules, so start with condo kitchen island ideas and the board's approval process before pricing anything.
  • Flooring where an island lands. If the island moves to where a wall or old cabinets stood, the cost of patching or replacing the floor depends on whether matching material can still be found.

Questions

Does a kitchen island need its own outlet in Ontario?

A fixed island does. Ontario's electrical code requires at least one receptacle on fixed island counter space of a minimum size, which is why Builders Ontario includes one in its island price and prices a pop-up counter receptacle at $250 to $500. Kitchen island design explains where it can go.

Why does island plumbing cost more over a finished basement?

Builders Ontario's $800 to $1,800 figure assumes the plumber works from the basement below. If that ceiling is finished, it has to be opened and patched, and a slab-on-grade floor has to be cut; Builders Ontario prices breaking and patching a slab at $1,500 to $8,000 in its plumbing guide.

Is a waterfall end worth the cost?

It depends on the material and the view. In solid quartz, one waterfall side costs $900 to $1,600, less a $150 to $400 credit for the cabinet end it replaces. In porcelain it can reach $4,000 per side, so one way to keep the look for less is a single waterfall on the end seen from the living area.

Sources and further reading

  1. Builders Ontario: Kitchen Island Size and Clearances (2026)
  2. Builders Ontario: Waterfall Island Cost (2026)
  3. RenoQuotes: Kitchen Renovation Cost in Canada in 2026
  4. Builders Ontario: Kitchen Renovation Cost in Ontario (2026)
  5. Builders Ontario: Kitchen Lighting Design and Costs (2026)

Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your kitchen renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.