
Bathroom costs
Bathroom renovation cost in Toronto
A full bathroom renovation in Toronto typically costs $15,000 to $30,000 in 2026 when the toilet, sink and tub or shower stay where they are, according to HomeStars' Toronto guides. A mid-range renovation with more change runs $30,000 to $50,000, and luxury bathrooms with heated floors, frameless glass and premium fixtures start around $55,000. These ranges are before 13% HST, and your estimate depends on the room's plumbing, size and finishes.
Toronto bathroom budgets by finish level, from two 2026 guides
The two most current Toronto guides land close together, which makes these bands useful for planning. RenoQuotes splits the lower end more finely, separating a cosmetic update from a standard renovation, while HomeStars folds both into one band for a three-piece refresh with no plumbing moved.
| Finish level | RenoQuotes, Toronto | HomeStars, Toronto |
|---|---|---|
| Cosmetic update, layout kept | $15,000 to $22,000 | $15,000 to $30,000 for a three-piece refresh |
| Standard renovation | $22,000 to $30,000 | Within the band above |
| Full mid-range renovation | $30,000 to $50,000 | $30,000 to $50,000 |
| High-end or luxury | $45,000 to $55,000+ | $55,000+ |
How much the size of the room changes the price
Size matters less than most people assume, because the same trades visit a 5 x 7 ft bathroom and a 10 x 10 ft one. HomeStars' Toronto bands by room size overlap heavily:
- Small, 5 x 7 ft: $9,000 to $22,000
- Average, 10 x 10 ft: $12,000 to $30,000
- Large ensuite, 14 x 14 ft or more: $14,000 to $40,000
Line-item prices for the main bathroom jobs
When a bathroom quote is broken into tasks, these are the 2026 Toronto figures to check it against. They cover installation; the sink figure, for one, excludes the fixture itself.
Room-specific budgets are in small bathroom renovation cost, ensuite renovation cost and powder room renovation cost; condo bathrooms are covered in condo bathroom renovation cost.
| Task | Typical Toronto cost |
|---|---|
| Demolition | $800 to $1,500 |
| Plumbing rough-in for shower, sink and toilet | $1,500 to $3,000 |
| Relocating a toilet or drain line | $2,000 to $5,000+ |
| Electrical: pot lights, outlets, exhaust fan | $1,000 to $2,500 |
| Bathtub installation | $2,500 to $5,000 |
| Shower installation | $8,000 to $15,000 |
| Toilet installation | $800 to $1,200 |
| Sink installation, fixture extra | $375 to $750 |
| Faucet installation | $250 to $600 |
| Permits for plumbing or structural work | $200 to $1,000 |
Tile changes the price per square foot more than anything else
Tile covers more surface than any other finish, so its installed price multiplies quickly. A 5 x 8 ft bathroom with a tiled tub surround has about 40 sq ft of floor and roughly 65 sq ft of wall tile. At $12 to $22 per sq ft for porcelain, those 105 sq ft come to about $1,260 to $2,310 installed; in marble at $20 to $45, about $2,100 to $4,725.
Large-format porcelain and patterns such as herringbone cost more to lay, because each piece takes longer to set and patterns cut more tile to waste. See bathroom tile ideas for where each type works.
| Tile | Installed per sq ft |
|---|---|
| Vinyl | $5 to $12 |
| Ceramic | $8 to $15 |
| Porcelain | $12 to $22 |
| Slate | $14 to $30 |
| Limestone | $15 to $35 |
| Mosaic | $18 to $40 |
| Marble | $20 to $45 |
| Glass | $20 to $45 |
Why labour is about half of a bathroom budget
HomeStars puts labour at 40% to 60% of a Toronto bathroom budget, with licensed plumbers and electricians at $100 to $200 an hour. A bathroom needs demolition, plumbing rough-in, electrical, waterproofing, drywall, tile, fixture setting and glass, usually by different trades in a fixed order, and each waits on the one before. Waterproofing is labour you never see once the tile is up; the shower waterproofing guide explains why it should never be the place to save.
Older Toronto houses add plumbing work. Cast-iron drains and galvanized steel supply lines are common in pre-war homes, and replacing them while the walls are open is far simpler than doing it later. Toronto Building's 2026 schedule charges $23.20 per plumbing fixture in a single-family dwelling, with a $214.79 minimum; whether your project needs a permit is covered in do you need a permit for a bathroom renovation in Toronto.
The cheapest decision is leaving the drains where they are
HomeStars calls keeping fixtures in their existing locations the single most effective way to hold a bathroom budget. Moving a toilet or drain line costs $2,000 to $5,000 or more, as much as or more than the installed porcelain tile for the whole 5 x 8 ft bathroom priced above.
Where a move is worth it, such as turning a cramped tub alcove into a walk-in shower, ask for the plumbing to be priced as its own line so you can see what the new layout costs on its own. At resale, HomeStars estimates bathroom renovations recover 70% to 85% of their cost.
Questions
Why is one Toronto bathroom quote $10,000 higher than another?
Usually because the quotes include different work. One may cover the waterproofing system, electrical upgrades, plumbing changes and disposal while another covers only fixtures and surfaces. Compare the scope line by line, as set out in how to compare renovation quotes.
Does a basement bathroom cost more than one upstairs?
It can when there is no existing rough-in. HomeStars puts adding a basement bathroom without one, which means breaking the concrete slab for drains, at $8,000 to $15,000. The basement bathroom guide covers the rest of that job.
Can I save money by supplying my own fixtures?
Sometimes, but plan it carefully. Fixtures must match the rough-in dimensions and valve type set early in the job, and late or wrong deliveries hold up every trade behind them. Agree in writing who orders what, and who handles a product defect.
Is HST charged on a bathroom renovation?
Yes. HST in Ontario is 13% on both labour and materials, so a $25,000 bathroom comes to $28,250 with tax. The HST guide explains how it appears on contractor invoices.
Sources and further reading
- HomeStars: Bathroom Renovation Costs in Toronto
- RenoQuotes: Bathroom Renovation Cost in 2026, Quebec vs. Toronto
- HomeStars: How Much Do Renovations Cost in Toronto in 2026?
- City of Toronto: Building Permit Fees (2026)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides





