Kitchen planning
Kitchen renovation checklist
Work from the appliances outward. Pick every appliance first and get its installation guide, because cut-outs, power, gas and venting set the cabinet layout; then test the layout against working clearances, mark every receptacle and light on the plan before rough-in, fix the sink, dishwasher and gas locations, and only then order cabinets and stone. The checklist below follows that order and ends with the permits and household prep that come before demolition.
Appliances: get the installation guide for every model before cabinets are drawn
Cabinets are built around appliances, not the other way round, so model numbers should be final before the cabinet drawings are. The installation guide, not the brochure, has the numbers the designer needs. See kitchen appliance planning for a renovation for choosing them.
- Cut-out size for each appliance: width, height and depth, plus any clearance the maker specifies around it.
- Refrigerator: standard or counter depth, door swing and hinge clearance beside a wall, and a water line if it makes ice.
- Range or cooktop: the gas line location, or the dedicated 240-volt circuit and breaker size the manufacturer lists for an electric or induction model.
- Range hood: width relative to the cooktop, the maker's mounting height range, duct diameter and a route outside; see range hood venting.
- Dishwasher: water, drain and power locations, and room for the door to drop fully open without hitting an island.
- Wall ovens and drawer appliances: stacking dimensions and the exact cabinet opening each needs.
- Panel-ready models: door panel size and weight limits; see panel-ready appliances and integrated kitchens.
- Delivery path: doorways, stairs, tight turns and, in a condo, the service elevator.
Cabinet layout: test it against clearances and daily use
With the appliances fixed, check the layout against the National Kitchen & Bath Association (NKBA) planning guidelines, the reference most kitchen designers work from. Measure on the plan from the face of the cabinets and appliances, not the walls. The kitchen work triangle and work zones and island sizes, clearances and seating go deeper.
- Fillers at walls and corners so drawers and appliance doors clear handles and trim.
- A decision for each corner: blind-corner pull-out, carousel, or dead space by choice.
- Drawers or doors in each base cabinet; deep drawers are easier to reach into than shelves behind doors.
- A waste pull-out sized for Toronto's three streams: Green Bin organics, Blue Bin recycling and garbage.
- A tall pantry or appliance garage, with a receptacle inside if small appliances will live there.
- Upper cabinets to the ceiling, finished with crown, or stopped short, decided before the order.
| Check | Guideline |
|---|---|
| Work aisle, one cook | At least 42 in (about 107 cm) |
| Work aisle, two or more cooks | At least 48 in (about 122 cm) |
| Walkway past the work area | At least 36 in (about 91 cm) |
| Dishwasher to sink | Within 36 in of the sink |
| Landing area beside the sink | 24 in on one side, 18 in on the other |
| Landing area beside the refrigerator | 15 in on the handle side |
Outlets, circuits and lighting: mark every one on the plan
Receptacles and lights are cheapest to place while the walls are open, and the Ontario Electrical Safety Code sets a minimum for counters. ESA's bulletin on kitchen receptacles applies Rule 26-722, under which no point along the wall line behind a counter may be more than 900 mm (about 35 in) from a receptacle, and a permanently fixed island at least 600 mm by 300 mm needs at least one.
All of it is electrical work the electrician files with the ESA before starting; electrical upgrades in a kitchen renovation and kitchen lighting design cover the detail.
- Counter receptacles placed to suit the backsplash, especially a full-height slab.
- The island receptacle: side panel or pop-up, settled before the stone is cut.
- Dedicated circuits wherever an installation guide calls for one.
- Under-cabinet lighting, with its driver location and switch.
- Pot lights laid out from the final cabinet plan, and pendants centred on the final island.
- Panel capacity checked before adding an induction range or wall ovens.
- Hardwired items: hood, disposal, instant hot water tap, toe-kick heater.
Plumbing and gas: lock the locations before rough-in
Moving the sink or adding one means a plumbing permit in Toronto, so check the kitchen permit rules at this stage too.
- Sink centreline, and how it lines up with a window or the island.
- Every hole the counter needs: faucet, soap dispenser, filtered-water tap, dishwasher air gap or disposal switch.
- Dishwasher beside the sink, on the side the main dish-doer prefers.
- Island sink: drain and vent routing settled before cabinets are ordered.
- Refrigerator water line with a shut-off you can reach.
- A pot filler, if wanted, needs a water line in the wall behind the range, as in the Victorian kitchen in Milton.
- Gas: the line location for a new range, or capping by a certified gas technician if you switch to induction.
Counters, backsplash and finishes: choose them before the order deadlines
Stone is templated only once cabinets are installed and levelled, and Caesarstone's fabrication guidance also expects appliances on site and plumbing and electrical finished by that visit. Anything undecided at that point holds up the counters; choosing renovation finishes without delays sets out the order.
- Countertop material, thickness, edge profile and overhang for seating.
- Sink style and model (undermount, farmhouse or integrated) so the shop can make the cut-out.
- Backsplash: tile to the underside of the uppers, or a full-height slab cut from the counter slabs.
- Flooring: whether it runs under the cabinets or stops at them.
- Hardware style, size and finish, counted door by door and drawer by drawer.
- Paint colours and sheens for walls and ceiling.
Before demolition: approvals and the household
- Permits issued where needed, the ESA notification filed, and condo approval if you live in one.
- Older houses checked first: Health Canada says a home built before 1960 probably contains lead-based paint. See asbestos and lead in older homes.
- A temporary kitchen set up and the old cabinets emptied; see living without a kitchen during a renovation.
- Floors and the trades' route through the house protected.
- A decision log: what is chosen, what is ordered, and when each item is due on site.
Questions
Should I buy appliances before the cabinets are designed?
Choose them first, even if you buy later. The cabinet maker needs each model's installation guide to size openings, and a substitute after the cabinets are built may not fit. If you are waiting for a sale, lock the model numbers and confirm they will still be available.
How many receptacles does a kitchen island need?
Under the Ontario Electrical Safety Code, a permanently fixed island with a counter at least 600 mm by 300 mm needs at least one, and an island split by a sink or cooktop can need more. Decide where it goes, side panel or pop-up, before the countertop is fabricated.
What does the fabricator need on templating day?
At minimum the exact sink, faucet and cooktop models, because cut-outs are made in the shop, along with cabinets fully installed and levelled. Ask your fabricator for their own list a week ahead so the visit isn't rescheduled.
Can I reuse my existing appliances in the new kitchen?
Yes, if their sizes and connections suit the new layout. Measure them and find their installation guides before design starts, and remember that cabinets built around an old fridge may need changes when it is eventually replaced.
Sources and further reading
- Kitchen Planning Guidelines (National Kitchen & Bath Association)
- Ontario Electrical Safety Code bulletins, including 26-23 on kitchen receptacles (ESA)
- The Professional Fabrication Series: Creating a Template (Caesarstone)
- Recycling, organics and garbage for houses (City of Toronto)
- Reduce your exposure to lead (Health Canada)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.