Renovation design
The renovation design process, from measurements to drawings
A renovation design starts with measuring the room as it is actually built, turns that into an existing-conditions plan, tests layout options, and ends with a drawing set: floor plan, wall elevations, an electrical and lighting plan, and plumbing locations, with every selection attached. Once you approve it, those drawings drive cabinet shop drawings, orders and, where needed, permit drawings. At Purple Kitchen & Bath this is stage two of four, design and planning, and it ends with layout, selections, approvals and permits planned before work begins.
Design is the second of four stages, and the one the build follows
Purple Kitchen & Bath runs every project through four stages: a consultation with Rowan Henry and the design team about the space, goals, style and budget; design and planning; the build; and a final walkthrough. The design stage is where a wish list becomes instructions a crew can build from without guessing.
If you already work with a designer, the same drawings can come from them; Purple Kitchen & Bath can work alongside a homeowner's own designer. Design-build renovation explained and working with a kitchen designer and a contractor compare the two arrangements.
What gets measured on the site visit, and why
A design is only as good as the measurements under it, and in older GTA houses walls are rarely straight, square or plumb. A good site measure records the room as built, not as it appears on an old floor plan or a listing sheet.
| Measured | Why it matters |
|---|---|
| Wall lengths at floor, counter and ceiling height | Walls bow and lean; cabinet runs and tile layouts must fit the tightest point |
| Corners checked for square | Out-of-square corners show up in countertop joints and tile lines |
| Ceiling height, bulkheads and soffits | Sets upper cabinet height, crown details and whether a fan duct can run above |
| Windows and doors: openings, trim widths, sill heights | A low sill limits the backsplash; trim widths eat into cabinet runs |
| Floor level across the room | Cabinets are levelled to the high point; a curbless shower needs the floor depth |
| Drain stack, vents, supply, gas line and ducts | Shows what can move easily and what is expensive to relocate |
| Joist direction and depth, seen from below | Decides whether a toilet or sink drain can run where you want it |
| Electrical panel size and spare space | Tells the designer whether new circuits fit or a panel upgrade belongs in the plan |
From measurements to a layout you can choose
The measurements become an existing-conditions plan: the room as it stands, with every pipe, vent and receptacle located. Layout options are drawn on top of it, usually two or three, each tested against working clearances, appliance and fixture specifications, and the routes the plumbing and ducts would need.
This is the stage to bring references. Photos of rooms you like, and notes on what you dislike about the current room, help the designer narrow the options quickly; moodboards and design references shows how to collect them. Once a layout is picked, everything that follows is drawn to that version, so changing it later means redrawing every sheet that depends on it.
The drawing set, sheet by sheet
A kitchen or bathroom drawing set is several drawings that each answer a different trade's questions. Ask to see all of them before you sign off, not only the renderings.
| Drawing | What it shows | Who builds from it |
|---|---|---|
| Floor plan | Walls, cabinets or fixtures, appliances, clearances and dimensions | Everyone; it is the master sheet |
| Wall elevations | Each wall face-on: cabinet sizes, shelf and appliance heights, tile extents, niche and valve heights | Cabinet maker, tile setter, plumber |
| Electrical and lighting plan | Receptacles, switches, pot lights, pendants, under-cabinet lights, fan and dedicated circuits | Electrician |
| Plumbing locations | Drain, supply and vent positions for each fixture, with rough-in heights | Plumber |
| Renderings | How the finished room will look in colour and light | You; trades don't build from them |
| Cabinet shop drawings | The cabinet maker's own drawings of every box, door and filler | Cabinet shop, after your approval |
| Permit drawings | Code-focused plans and sections, when the work needs a permit | Toronto Building and its inspectors |
Permit drawings in Toronto follow their own rules
When a renovation moves walls, opens new windows or changes plumbing, the design drawings feed a permit set, and Toronto's interior alterations guide spells out what that set needs. Drawings go on standardized sheets, drawn to scale, fully dimensioned, signed and dated, submitted as PDF files, and without personal information such as the owner's name or phone number.
Floor plans must show existing and proposed uses of every space, the locations of smoke alarms and carbon monoxide detectors, all plumbing fixtures, and the structural framing above. A Schedule 1 Designer Information Form is required for every designer other than engineers and architects, and drawings by a qualified designer carry the designer's name, registration and qualification numbers, signature and a stamp or statement accepting responsibility. Engineer-sealed drawings also need the City's Assumption of Responsibility for Engineering Content form.
Keep the stamped permit plans on site: Toronto asks for them at inspections. Whether your project needs a permit at all is covered in the kitchen permit guide and the bathroom permit guide.
Selections and sign-offs lock the design
Drawings are only final when the products on them are. Each selection, from the faucet to the tile edge trim, should be listed against the drawing it affects, with model numbers, finishes and quantities. Choosing renovation finishes without delays explains which ones must be settled first.
Approve each revision in writing and keep the latest set in one place, because a crew building from an old version is one of the costliest mistakes a renovation can make.
- Homeowner sign-off on the final drawings and selection list.
- Cabinet shop drawings checked against the elevations before production starts.
- Permit issued where the work needs one.
- ESA notification filed by whoever does the electrical work, before that work starts.
- Condo approval where the building requires it; see getting condo board approval.
Questions
Can I bring drawings from my own designer?
Yes. Purple Kitchen & Bath can work alongside a homeowner's designer. If the project needs a Toronto permit, the permit drawings still need the designer information Toronto requires, so check who is preparing them.
Do I need an engineer for a kitchen or bathroom design?
Usually only when the design touches structure, such as removing a load-bearing wall or cutting a large new opening, and the beam or framing falls outside what a qualified designer can size. When an engineer seals the drawings, Toronto also needs its Assumption of Responsibility for Engineering Content form.
What's the difference between a rendering and a construction drawing?
A rendering shows how the room will look; a construction drawing tells a trade exactly where and how big things are. Approve the renderings for style, and check the elevations and plans for heights, sizes and locations.
Can a homeowner prepare their own permit drawings in Toronto?
Toronto's guide allows for property owners who are exempt from the designer qualification requirement; they state the reason for the exemption on Schedule 1. The drawings must still meet the same content rules as any other set.
Sources and further reading
- Interior alterations: application guide (City of Toronto)
- When to call for inspection of small buildings (City of Toronto)
- Notifications and inspections (Electrical Safety Authority)
Checked November 19, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.