Renovations

Guides

Aerial view of apartment towers and townhouses in Pickering in winter

Pickering kitchens and baths

Kitchen and bathroom renovations in Pickering

Kitchen and bathroom renovations in Pickering are permitted by the City of Pickering's Building Services, which takes applications online at mycity.pickering.ca. The City's own list puts any plumbing work, a finished basement and adding or removing walls on the permit side, while a direct swap of a toilet or sink for a CSA-approved fixture, with no pipe work, needs no permit. Beyond that, the plan depends on the house: a new Seaton build, a south Pickering home from 1961 to 1990, a City Centre condo or a heritage property in Whitevale.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: iStock

Pickering's permit line runs through the pipes, the walls and the basement

The City of Pickering publishes one list of work that needs a building permit and one of work that typically does not, and for kitchens and bathrooms the deciding item is plumbing. "Any plumbing" is on the permit list. The no-permit list covers a direct replacement of a toilet or sink with a CSA-approved fixture in the same spot with no pipe work, and cabinetry and millwork with no plumbing. Zoning still applies when no permit is needed.

Apply through the City's portal at mycity.pickering.ca. Paper sets are no longer taken at the counter, emailed drawings are not reviewed, and files must be unlocked, flattened PDFs. An owner can authorize a contractor or designer to apply, and work should never start before the permit is issued. For how plumbing changes are drawn and inspected in general, see when a bathroom renovation needs a permit, keeping in mind that its examples come from Toronto.

City of Pickering permit lists, applied to kitchen and bathroom plans
What you plan to doHow the City lists it
Swap a toilet or sink in the same spot, no pipe changesNo permit
New cabinets or built-ins with no plumbingNo permit
Sink moved to an island, shower added, basement bathroom roughed inPermit: any plumbing
Wall taken out between kitchen and family roomPermit: adding or removing walls
Basement finished, or a second suite addedPermit
Basement den turned into a bedroom, no constructionPermit: change of use

Seaton homes are new, so check the Tarion warranty before opening a wall

Seaton is the planned community in north Pickering: more than 7,000 acres, over half kept as open space, planned for about 61,000 residents with a long-term target of 70,000, and up to 35,000 jobs along Highway 7 and the 407. Its houses are new, so wear is rarely the reason to renovate; a builder-standard kitchen that does not suit how you cook, or an unfinished basement, usually is.

The new home warranty shapes the timing. Tarion's two-year coverage includes defects in the plumbing, electrical and heating distribution systems, and Tarion's list of what is not covered includes alterations, deletions or additions made by the homeowner. If the house is still inside that window, photograph the original work and report any outstanding defects before new work changes those systems. Finishing a bathroom the builder roughed in is still plumbing work; the basement bathroom renovation guide covers drainage, ceiling height and ventilation.

South of Seaton, more than half the houses date from 1961 to 1990

In the 2021 census, 17,305 of Pickering's 33,425 occupied homes were built between 1961 and 1990. The suburbs grew outward as subdivisions after the Second World War, starting around Frenchman's Bay, and south urban Pickering now takes in neighbourhoods from Bay Ridges, West Shore and Rosebank to Amberlea, Liverpool and Brock Ridge.

A house from those decades that still has its first kitchen usually has a closed one. Opening it means finding out whether the wall carries load; if it does, a beam sized by a designer or engineer goes on the permit drawings, as covered in removing a load-bearing wall for an open kitchen. Once walls are open, plan to bring shut-off valves, drains, fan ducts and circuits up to current code rather than reuse them as found.

Pickering's occupied homes by period of construction, 2021 Census
BuiltHomesShare
1960 or before2,0706%
1961 to 19808,35025%
1981 to 19908,95527%
1991 to 20006,54020%
2001 to 20154,67014%
2016 to 20212,8459%

Whitevale's heritage district covers the whole hamlet

Pickering Council designated the entire Hamlet of Whitevale a heritage conservation district under By-law 4074/92 in 1993, and the Ontario Heritage Trust lists 40 properties in it. There, a permit is needed for new construction, changes, additions or demolition, and the City's list of changes that may need one includes cladding, windows, doors, roof finishes, lighting, fences and garages.

Work inside the walls is not on that list, but the edges of a project can be: a wider window over the sink, a patio door, or a hood or fan vent through the siding. Raise those with the City's heritage planner (City Development, 905.420.4617) while the layout can still move. Staff can approve minor work; larger projects may go to the Heritage Pickering Advisory Committee or Council.

Pickering's lake water: 125 mg/L, and where that number gets used

Pickering's piped water is Lake Ontario water treated by the Region of Durham, which publishes its hardness as 125 mg/L as calcium carbonate, about 7.3 grains per US gallon. The Region says a softener or filtration system is a personal preference and not required with its water.

  • Setup screens: a dishwasher with a built-in softener or an espresso machine asks for local hardness, and this is the figure to enter.
  • If you want a softener or under-sink filter anyway, give it a spot, a drain and an outlet while the cabinet layout is still on paper.
  • Clear glass will still spot; see keeping a glass shower clean.

In a City Centre condo, the corporation's rules come first

Pickering has a larger condo share than Ajax or Whitby: the 2021 census counted 5,865 condominium homes, about 18% of occupied dwellings, and the City Centre around Pickering Town Centre is where the newest towers are going up. In a condo, the corporation's declaration and rules set much of the job. Most want notice or approval before work starts, proof of the contractor's insurance, booked elevator time and set working hours, and anything touching shared risers or common elements needs the board's consent. A City permit still applies where the work needs one, such as moving plumbing; see condo board approval for a renovation.

Questions

Does finishing the bathroom the builder roughed in under my Seaton basement need a permit?

Yes. The City of Pickering lists any plumbing work and finishing a basement as permit work, and connecting fixtures to a rough-in is plumbing. Apply through mycity.pickering.ca before the work starts.

Can I drop off a paper permit application at Pickering City Hall?

No. The City no longer accepts hard copies at the counter, and drawings emailed to Building Services are not reviewed. Applications go through the online portal.

What hardness should I enter on a new dishwasher in Pickering?

Durham Region publishes Pickering's water at 125 mg/L as calcium carbonate, about 7 grains per US gallon. Use whichever unit the appliance asks for.

My house is in Whitevale. Does an interior kitchen renovation need a heritage permit?

The City's list of changes that may need a heritage permit is about the exterior, so an interior-only kitchen is unlikely to be affected. A new window, door or wall vent may be, so check with the heritage planner first.

Sources and further reading

  1. City of Pickering: Building permits
  2. City of Pickering: Seaton community
  3. City of Pickering: Heritage planning
  4. Region of Durham: About water (hardness by drinking water system)
  5. Statistics Canada: Census Profile, 2021, Pickering

Checked November 22, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.