Ajax renovations
Kitchen and bathroom renovations in Ajax
Kitchen and bathroom renovations in Ajax are permitted by the Town of Ajax, which takes residential applications through its Online Application Portal at eapply.ajax.ca and lists plumbing and renovations to existing buildings among the work that needs a building permit. Wiring is a separate filing with the Electrical Safety Authority. In Pickering Village, the Town's only heritage conservation district, exterior changes such as a new window or vent also need a heritage permit, and the water throughout comes from Lake Ontario through the Region of Durham's plant in Ajax.
Ajax was built in three waves, and the age of the house sets the scope
Ajax began as a Second World War munitions town: the Defence Industries Limited plant went into production in 1941, the town took its name from the cruiser HMS Ajax, and its first streets were wartime houses for plant workers. Pickering Village, settled by Quaker families from 1807, became part of Ajax in 1974. The biggest wave came much later. In the 2021 census, 10,610 of the town's 39,490 occupied homes were built between 2001 and 2010.
A house from that decade has a kitchen and ensuite roughly 15 to 25 years old with current-era plumbing and wiring behind them, so a renovation there is mostly about layout, storage and finishes. In the 2,765 homes built in 1960 or before, the walls tend to hold more surprises, and the scope should allow for older wiring, drains and venting to be brought up to code.
| Built | Homes | Share |
|---|---|---|
| 1960 or before | 2,765 | 7% |
| 1961 to 1980 | 6,345 | 16% |
| 1981 to 1990 | 8,530 | 22% |
| 1991 to 2000 | 5,630 | 14% |
| 2001 to 2010 | 10,610 | 27% |
| 2011 to 2021 | 5,605 | 14% |
Pickering Village is in Ajax, and so is its heritage district
The name misleads newcomers: Pickering Village is a neighbourhood of the Town of Ajax, not the City of Pickering, so its building and heritage permits come from Ajax. Council designated part of the village under Part V of the Ontario Heritage Act through By-law 102-2013, and it remains the Town's one heritage conservation district, made up of 59 separate properties of historic commercial and residential buildings. Ajax also has 31 individually designated properties elsewhere.
Inside the district, a heritage permit is needed before alterations that could affect a property's heritage attributes, which the district plan lists. A kitchen or bathroom behind the walls seldom touches them. The exterior pieces of the job can: a new or enlarged window, a door to the yard, or the wall cap where a range hood duct or bathroom fan exits. Sending ducts to a rear or side wall leaves the street face unchanged; the range hood venting guide covers duct sizes and routes.
What the Town of Ajax asks for with a renovation permit
Ajax sorts permits by size: plumbing is a minor permit, while renovations to existing buildings and additional dwelling units are moderate ones. Residential applications go through the Online Application Portal at eapply.ajax.ca, and other types are emailed to buildingpermits@ajax.ca. Once a permit is issued, work must start within six months and be completed within one year. The Town's checklist for renovating an existing house asks for all documents as PDFs, including:
- the Application for a Permit to Construct or Demolish, with Schedule 1 designer information
- a completed Energy Efficiency Design Summary form
- fully dimensioned construction drawings showing existing and proposed work, exits, and wall and ceiling design
- a site plan or survey when the exterior changes, showing the location of any exterior door
- Durham Region Health Department approval if the house is connected to or next to a septic system
- a letter of authorization when someone other than the owner applies
Basement bathrooms: what the Ajax finished-basement guide wants to see
The Town's guide for finished basements asks for plans drawn to scale that show room uses, ceiling heights including low headroom areas, every plumbing fixture (tub, shower, toilet, sinks and washing machine), and the smoke alarms, carbon monoxide alarms and mechanical ventilation fans. For the bathroom, it calls for a 1 square foot clear opening for natural ventilation, or a mechanical fan providing one air change per hour.
If the bathroom has no openable window, the fan and its duct to the outdoors carry all of the ventilation, so they belong on the drawings from the first draft. The basement bathroom renovation guide covers drains and headroom, and bathroom exhaust fans and ventilation covers fan sizing and quiet ratings.
Ajax water is treated in town, from 18 metres down in Lake Ontario
The Region of Durham's Ajax Water Supply Plant draws raw water through an intake pipe that runs about 2.5 kilometres into Lake Ontario to a depth of about 18 metres. Rated at 163,500 cubic metres a day, the plant supplies Ajax and Pickering, adds fluoride to the treated water, and can send a limited amount east to Whitby, Oshawa and Courtice. Durham lists the hardness at 125 mg/L as calcium carbonate: enough to leave spots and crust where water dries, on glass, chrome and spray faces.
- A frameless glass panel has no bottom track for deposits to build up in; compare options in frameless glass shower doors.
- Shower heads and kitchen sprayers with soft rubber nozzles let you rub scale off by hand instead of soaking the fitting.
Questions
Is Pickering Village part of Pickering or Ajax?
Ajax. The village became part of Ajax in 1974, and its heritage conservation district is a Town of Ajax district, so building and heritage permits for a house there come from the Town of Ajax.
Does an Ajax kitchen renovation need a building permit and an ESA notification?
Often both. The building permit covers plumbing and construction, while the Town notes that filing an electrical notification with the Electrical Safety Authority is a separate step for new or changed wiring.
Can I email my Ajax building permit application?
Residential applications go through the Online Application Portal at eapply.ajax.ca. The buildingpermits@ajax.ca address is for application types the portal does not take.
Does a basement bathroom in Ajax need a window?
Not necessarily. The Town's finished-basement guide accepts a mechanical fan providing one air change per hour in place of a 1 square foot natural ventilation opening.
Sources and further reading
- Town of Ajax: Building permits and inspections
- Town of Ajax: Permit to renovate existing residential buildings (PLD-068)
- Town of Ajax: Finished basements guide
- Town of Ajax: Planning and Development Services activity summary, July 2024 (heritage planning)
- Region of Durham: 2025 Oshawa/Whitby/Ajax drinking water systems annual report
Checked November 22, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.