
Scarborough kitchens and bathrooms
Kitchen and bathroom renovations in Scarborough
Scarborough renovation permits come from Toronto Building, and the district that serves Scarborough works out of the Scarborough Civic Centre at 150 Borough Drive. A permit is needed once plumbing is installed or modified or a wall comes out, but not for new cabinets or for fixtures replaced in place. Scarborough has a larger share of detached houses, and of homes built from 1961 to 1980, than Toronto as a whole, so many renovations replace a kitchen or bathroom that has never been fully redone.
What the 2021 Census says about Scarborough's homes
The six Scarborough wards, numbered 20 to 25, hold about 219,000 occupied homes, and their profile is different from the city as a whole. The 1960s and 70s are over-represented, newer homes are scarcer, and detached houses make up a much larger share. Scarborough's population grew from 56,292 in 1951 to 217,286 in 1961, and the houses built for that wave are the ones now coming up for a first or second full renovation.
| Measure | Wards 20 to 25 (Scarborough) | City of Toronto |
|---|---|---|
| Built 1960 or before | 22% | 29% |
| Built 1961 to 1980 | 37% | 29% |
| Built 2001 or later | 15% | 24% |
| Single-detached houses | 37% | 23% |
| Apartments in buildings of five or more storeys | 35% | 47% |
Post-war bungalows: replacing an original kitchen or bathroom
A bungalow or backsplit from Scarborough's boom years often still has a compact kitchen behind a wall and a single bathroom. Renovating either one for the first time means opening walls that have been closed for 50 years or more, so the design should allow for what turns up: a drain line that has to be replaced back to the stack, a kitchen circuit that cannot carry a modern induction range, or plaster and old flooring that should be tested for asbestos before demolition.
For opening the room without losing storage, read planning a kitchen in a post-war bungalow; for setting a contingency, read what older houses hide behind their walls. On the bathroom side, a single original room can be rebuilt around a walk-in shower or a better tub, with a second bathroom added in the basement.
Which Scarborough renovations need a Toronto permit
Toronto Building's Scarborough district office is on the third floor of the Scarborough Civic Centre, the former city's last seat of government, at 150 Borough Drive; zoning information there is by appointment. The City's own list decides which jobs need a permit, and applications go in online. For a house, Toronto's 2026 fee for an interior alteration is $11.53 per square metre.
| Job | Permit? | Why |
|---|---|---|
| New cabinets, counters and backsplash | No | Cabinetry and millwork are exempt |
| Toilet, vanity or tub replaced in the same spot | No | Repairing and replacing fixtures is exempt |
| Sink moved to an island, shower relocated or a basement bathroom added | Yes | Installing or modifying plumbing |
| Kitchen wall removed to open the main floor | Yes | Adding or removing walls |
| Wider kitchen window or a new patio door opening | Yes | New or enlarged openings |
| Backwater valve on the main drain | Yes | Listed separately, with an inspection before it is covered |
| Basement turned into a second suite with its own kitchen | Yes | Adding a second suite |
Lake water from West Hill: planning a kitchen for 119 mg/L hardness
Scarborough's tap water comes from Lake Ontario, and the east end is supplied by the F.J. Horgan Water Treatment Plant in West Hill. It opened in 1979, can produce 800 million litres a day and supplies about 20% of Toronto's drinking water, part of it to York Region. Toronto's 2025 drinking water summary put hardness at an average of 119 mg/L, with results from 115 to 122, above the 80 to 100 mg/L guideline the City lists for it.
Water at that level is safe but leaves scale. In a kitchen it shows up in kettles, coffee machines, instant hot water taps and on a dishwasher's glassware; in a bathroom, on shower glass and in shower head nozzles. Plan the sink cabinet with room for a filter if you want one, choose faucets with aerators you can remove and clean, and compare filtered and instant hot water taps before settling on one.
Older towers around Scarborough City Centre and beyond
More than a third of Scarborough's homes are in apartment blocks at least five storeys tall, and many high-rises and condominiums went up around Scarborough City Centre in the late 20th and early 21st centuries. In an older building, the corporation's rules and the age of its plumbing shape the job as much as the design does: approvals before work starts, set hours, elevator bookings, and drains that can move only as far as the nearest riser allows.
Renovating a kitchen or bathroom in an older Toronto condo explains what to check with management before the design is drawn.
Questions
Is the Scarborough Civic Centre where I apply for a renovation permit?
It houses Toronto Building's Scarborough district office, on the third floor at 150 Borough Drive, where zoning information is available by appointment. The application itself is submitted online, and general questions go to Toronto Building at 416-397-5330.
Can I open my Scarborough bungalow's kitchen to the living room?
Usually, yes, but removing a wall is permit work in Toronto, and if the wall carries load an engineer sizes the beam that replaces it. Any duct, drain or wiring inside the wall is rerouted as part of the same job.
Is Scarborough's water hard enough to damage a new faucet or shower?
At about 119 mg/L it leaves spots and scale rather than damage. Cleaning aerators and shower heads, picking finishes that hide spotting and adding a drinking water filter are the usual answers; a softener is a separate whole-house choice.
Do I need a permit to add a basement bathroom in Scarborough?
Yes. A new bathroom means installing plumbing, which is on Toronto's permit list, and a backwater valve fitted at the same time needs its own permit and an inspection before it is covered.
Sources and further reading
- City of Toronto: Ward profiles, 2021 Census
- City of Toronto: When do I need a building permit
- City of Toronto: Fast facts about the City's water treatment plants
- City of Toronto: Drinking water analysis summary 2025
Checked November 22, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides



