Kitchen and bathroom renovations in East York

East York kitchens and bathrooms are permitted by the City of Toronto, and East York belongs to Toronto Building's Toronto and East York district, whose office is at City Hall, 100 Queen Street West. Much of East York's housing is compact homes from before and just after the Second World War, so a renovation usually means making a small kitchen work harder, adding a second bathroom, and checking for two things from that era: a lead water service pipe and knob-and-tube wiring.

By the Purple Kitchen & Bath team · Updated · 4 min read · Photo: iStock

Small houses with a long municipal history

East York was incorporated as a township on January 1, 1924, with 19,849 residents. Leaside, incorporated as a town in 1913 and laid out by landscape architect Frederick Todd for the Canadian Northern Railway, joined it in 1967 to form the Borough of East York, and the borough became part of the City of Toronto in 1998. After the war, many inexpensive homes were built for returning veterans, mostly single detached houses with front yards and back gardens, and many one-storey bungalows have since gained a second floor.

That history explains what a renovation here often starts with: a modest footprint, a kitchen designed for one cook, a single bathroom, and in some houses a second storey added decades after the first.

What each part of East York tends to bring to a kitchen or bathroom renovation
WhereHousingWhat to plan for
LeasidePlanned residential community from 1913, predominantly single-family homesKitchens enlarged within the original walls or into a rear addition; bathrooms rebuilt around existing stacks
Post-war East York streetsSmall detached houses and bungalows, many with added second floorsA second bathroom, a compact kitchen, older service pipes and wiring
Thorncliffe Park and Crescent TownApartment buildingsCondo or landlord approval, shared risers, building working hours

Check the water pipe and the wiring before the walls open

The age that gives East York houses their character also puts two items on the pre-design checklist. Both are cheaper to deal with while the kitchen or bathroom is already open.

  • Lead water service. The City flags houses from before the mid-1950s as candidates for a lead service pipe, a range that takes in much of East York's housing. The telltale signs at the meter are a grey pipe that scratches easily and gives a dull, solid sound when tapped. Ask 311 for a records check early (it can take up to 30 business days) and request the City's free lead test. Commit to replacing the private portion, and under its Priority Lead Water Service Replacement Program the City then replaces the public one.
  • Knob-and-tube wiring. The Electrical Safety Authority dates knob-and-tube to houses wired between the early 1900s and the 1940s, which matches much of East York. ESA considers it safe when a Licensed Electrical Contractor maintains it, yet it also warns that plenty of insurers decline to cover or renew a house that still has it. A new kitchen needs dedicated circuits anyway, so have a licensed electrical contractor assess the house before the electrical plan is drawn.
  • Other older materials. Plaster, flooring and insulation in a house of this age should be checked before demolition; testing older homes for asbestos and lead explains what to sample.

Making a small East York kitchen do more

In a narrow house the kitchen rarely gets bigger on paper, so the gains come from layout and storage. A galley or L-shaped plan with cabinets taken to the ceiling, a counter-depth refrigerator, deep drawers instead of base shelves and a pantry pull-out can add more usable storage than a few extra square feet. The guides to small kitchen renovation ideas and galley kitchen renovation show how the dimensions work.

Opening the kitchen to the dining room takes a Toronto permit, and if the wall is structural, a beam designed by an engineer replaces it. In a semi-detached house the shared party wall stays put, so plumbing and venting run along the other walls; planning a kitchen in a Toronto semi covers that layout.

Adding a second bathroom to a one-bathroom house

For a household sharing one bathroom, a second one is often the most useful room you can add. Each option has different plumbing behind it, and each needs a Toronto building permit, because installing plumbing is on the City's permit list even when no wall moves.

  • A main-floor powder room, often in a former closet or under the stairs, needs a drain route to the existing stack and a way to vent; see fitting a powder room into the main floor.
  • A basement bathroom becomes the lowest drain in the house, so a backwater valve is worth planning, and Toronto's Basement Flooding Protection Subsidy Program can help pay for one installed under permit.
  • A bathroom in an added second storey is easiest when it stacks above the existing bathroom or kitchen, keeping new drain runs short.
  • Every one of them is drawn on floor plans showing all plumbing fixtures, and the permit application includes a Plumbing Data Sheet.

Questions

Does East York still have its own building department?

No. Since East York became part of the City of Toronto in 1998, its permits have come from Toronto Building. East York addresses fall in the Toronto and East York district, whose office is at City Hall, 100 Queen Street West, and applications are made online.

How can I tell whether my East York house still has a lead service pipe?

Start at the water meter: a grey pipe that scratches easily and sounds solid when tapped may be lead. The City can search its records if you call 311, but allow up to 30 business days for an answer, so ask early in the design stage. A free City lead test is the only sure way to know what is in your water.

Will knob-and-tube wiring affect my kitchen renovation?

It can. ESA points out that insurers often refuse coverage or renewal where knob-and-tube remains, and a new kitchen needs modern dedicated circuits regardless. A Licensed Electrical Contractor can assess what is left in the house while the walls are open.

Can I add a powder room in East York without a permit?

No. A new toilet and sink mean installing plumbing, which needs a Toronto building permit with a Plumbing Data Sheet. Replacing an existing toilet or sink in place does not.

Sources and further reading

  1. City of Toronto: Toronto Building contact us (district offices)
  2. City of Toronto: Lead in drinking water
  3. Electrical Safety Authority: Knob and tube wiring
  4. City of Toronto: When do I need a building permit

Checked November 22, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.