
Richmond Hill kitchens and baths
Kitchen and bathroom renovations in Richmond Hill
Richmond Hill's Building Division issues the permits and accepts every type of residential building permit application online. Building new kitchen or bathroom cupboards needs no permit, but altering plumbing does, and the City's fee schedule charges $28.40 per fixture with a $158.40 minimum plumbing fee. Homes on municipal water get Lake Ontario water through York Region, at 127 mg/L of hardness in mid-2026, and nearly one home in five is an apartment in a building of five or more storeys, where the condo corporation's rules shape the job as much as the City's.
What Richmond Hill charges to permit a kitchen or bathroom
Richmond Hill publishes its residential permit fees, so you can estimate the City's share before design is finished. A permit is needed to alter a building, including its plumbing, while painting, decorating and constructing kitchen or bathroom cupboards appear on the City's no-permit list. Applications are filed and reviewed electronically and paid online by Visa or Mastercard.
- A bathroom where the sink, toilet and shower all move is three fixtures, or $85.20 at the per-fixture rate, so the $158.40 minimum applies to the plumbing portion.
- Once a permit is issued, you are responsible for calling for each stage of the City's housing inspections, so the build schedule should leave room for them.
- Fees change, so confirm current amounts with the Building Division at 905-771-8810 before you budget.
| Fee | Amount | Where it shows up |
|---|---|---|
| Building alteration fee | $10.40 per m² | A kitchen opened up by removing or moving walls |
| Plumbing, additions or alterations | $28.40 per fixture | Each sink, toilet, shower or tub added or moved |
| Minimum plumbing fee | $158.40 | Small bathroom jobs with only a few fixtures |
| Finished basement | $6.56 per m² | A basement with a new bathroom |
| Minimum residential permit fee | $210.12 | The floor for small residential permits |
Condo kitchens and bathrooms along the Yonge Street corridor
The 2021 census counted 12,960 Richmond Hill homes in apartment buildings of five or more storeys, 18.7% of the city's 69,315 occupied homes, and the City's plans direct its greatest heights and densities to Richmond Hill Centre, around Yonge Street and Highway 7, with more growth along the Yonge corridor. For condo owners, the corporation is the first approval, not the City. Its declaration, rules and renovation policy can set working hours, elevator bookings, how and when the building's water is shut off, and what underlay goes under hard flooring.
Bring the corporation's renovation forms to the first design meeting. The guide to condo board approval for a renovation explains what management typically asks to see, and condo plumbing risers, shut-offs and leaks covers the limits a riser puts on moving a sink or toilet. The condo kitchen with city views shows the team's condo work: a bold blue kitchen planned around floor-to-ceiling glass, with tall shaker pantry cabinets in blue and 12 feet of custom millwork.
The north half of the city sits on the Oak Ridges Moraine
The City notes that the northern half of Richmond Hill lies on the Oak Ridges Moraine, which stores a very large volume of groundwater and is protected by provincial legislation passed in 2001 and the Oak Ridges Moraine Conservation Plan. The Oak Ridges Corridor Conservation Reserve alone covers 604 hectares of wetland, forest and kettle lakes, including Bond Lake.
For a kitchen or bathroom inside an existing house, the moraine's planning rules are unlikely to come up. It matters when the project grows: the City lists Toronto and Region Conservation Authority approval among the pre-approvals some residential permits need, and additions larger than 400 square feet in footprint need a site alteration permit before the building permit. Enlarging a kitchen with a rear addition on a moraine lot should start with those questions.
Lake water through the taps, unless the house is on a well
York Region's 2025 report for its main system says Richmond Hill, Vaughan and Markham receive all their water from Lake Ontario, so a house connected to municipal water in Oak Ridges drinks the same lake water as one near Yonge and Highway 7. York's second-quarter 2026 average for Richmond Hill was 127 mg/L, about 7.42 grains per gallon, in the band it calls hard. Plan for scale: an aerator that unscrews, a shower head with flexible nozzles, and coated or simple frameless glass. The guide to keeping a glass shower clean covers the routine.
Some properties are not on municipal water: the City's source protection page lists private wells and septic systems among residential activities that can affect drinking water. If your house is one of them, York's numbers do not describe your water. Have it tested before choosing a softener or filter, and keep the septic system's capacity in mind before adding a bathroom.
Gormley and Richmond Hill's designated houses
Richmond Hill's first heritage conservation district, Gormley, was established in 2009 and includes the village core of Gormley. Elsewhere, individual properties are designated by Council on the advice of Heritage Richmond Hill; 317 Mill Street and 734 King Road were designated in October 2025. For a designated property, any alteration that may affect its heritage attributes needs a heritage permit before work begins, though minor alterations may not.
Heritage attributes are listed in each property's designating by-law, so read yours before designing a kitchen that adds a window or vents through a wall. The City's heritage planner, at 905-771-5529, can say whether a change needs a permit.
Richmond Hill houses by decade, and help with a basement bathroom
Richmond Hill's single busiest building decade was 1991 to 2000, with 15,915 of today's occupied homes, followed by 12,175 from the 1980s and 18,255 from 2001 to 2010. Only 3,495 predate 1961. A bathroom from the 1990s is now more than 25 years old, and if it still has its original tub, valve and fan, those are the parts behind the tile worth replacing; see which plumbing to upgrade while a bathroom is open for the rest of the checklist.
If the plan adds a basement bathroom, the City's Backwater Valve Subsidy Program offers up to $1,500 toward installing a valve, subject to available funding. It covers existing single-family, duplex and triplex homes, needs a City building permit and a plumbing inspection before the work is covered, and the application is due within six months of completion.
Questions
Does a condo kitchen renovation in Richmond Hill need a City permit?
New cabinets alone do not. Moving or adding plumbing is an alteration that needs a building permit, and every condo renovation also needs whatever approval the condo corporation's rules require.
My house in Oak Ridges is on a private well. Does York's hardness figure apply?
No. York's figures describe the municipal supply. Test your own well water for hardness and other minerals before picking a softener, and confirm your septic system can take any added bathroom.
Is Richmond Hill's backwater valve subsidy still available?
The City lists it at up to $1,500, first come, first served and subject to available funding. Confirm with the City at backwatervalve@richmondhill.ca or 905-771-8800 before counting on it, and do not cover the valve before the plumbing inspection.
Can a heritage designation affect my kitchen if the work is inside?
Only if the designating by-law lists interior features among the heritage attributes. Check the by-law for your address, and ask the heritage planner if anything in the kitchen is named.
Sources and further reading
- City of Richmond Hill: Residential permits
- City of Richmond Hill: Oak Ridges Moraine
- City of Richmond Hill: Cultural heritage planning
- City of Richmond Hill: Backwater valve subsidy program
- York Region: Drinking water quality and monitoring
Checked November 22, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.
Keep reading
Related guides



