Renovations

Guides

Brick storefronts and patios on Main Street Unionville in Markham

Markham kitchens and baths

Kitchen and bathroom renovations in Markham

The City of Markham takes kitchen and bathroom permit applications through ePLAN, its online intake system: taking out a wall or finishing a basement falls under a housing permit, while a job limited to plumbing gets a plumbing permit. In Markham's four heritage conservation districts, Unionville, Markham Village, Buttonville and Thornhill, a new window, door or other exterior change needs a heritage permit before the building permit can be submitted, and minor heritage permits carry no fee. A new basement bathroom may also qualify for the City's plumbing protection rebate, up to $1,750 for an indoor backwater valve.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: iStock

Which Markham permit a kitchen or bathroom project needs

Markham sorts residential permits by type, and the type follows the work rather than the room. The City's permit guide gives wall removal and finished basements as examples of a housing permit (HP), and says a plumbing permit (PP) applies when the project is limited to plumbing. Alterations need drawings of the existing floor plans as well as the new ones, on standard-size sheets, to scale, with every dimension shown, and signed and dated.

  • Not sure which type fits? Markham's Building Counter, at 905-475-4870, confirms the permit type before you file.
Typical Markham kitchen and bathroom projects and their permit type
ProjectPermit typeWhat goes with it
Kitchen opened to the family room by removing a wallHousing permit (HP)Existing and new floor plans, structural drawings for the opening
Basement finished with a new three-piece bathroomHousing permit (HP)Plumbing shown as fixture and drainage plans
Second vanity sink or relocated toilet, with no other constructionPlumbing permit (PP)Fixture and drainage plans
Basement secondary suite with its own kitchenHousing permit (HP)Fire registration as well as the permit
New window or door on a house in a heritage districtHeritage permit firstThe building permit application waits for the heritage permit

Unionville, Markham Village and Buttonville: heritage approval comes first

Four parts of Markham are protected as districts under Part V of Ontario's heritage law. The Thornhill district, east of Yonge, is covered on the Thornhill kitchen renovation page; the other three each have their own district plan and design guidelines.

Markham's three heritage conservation districts outside Thornhill
DistrictDesignatedWhat it covers
Markham Village1990, By-law 120-90Three sub-districts along Main Street (Highway 48): Vinegar Hill, the Markham Village commercial core and Mount Joy
Unionville1997, By-laws 250-97 and 251-97210 properties, according to the Ontario Heritage Trust
Buttonville2011, By-law 2011-149The hamlet's district plan and inventory

What a minor heritage permit means for a kitchen or bathroom

Inside the walls, a kitchen or bathroom in these districts is ordinary permit work. The heritage permit is about the outside: Markham's examples of a Minor Heritage Permit include removing and replacing windows or doors, new or different wall cladding, and mechanical equipment that can be seen from outside. There is no fee for a minor application, and heritage staff have delegated authority to approve alterations, while most major applications go to the Heritage Markham Committee.

In a kitchen, heritage work starts where the plan breaks through the outside wall: the cap for a ducted hood, an enlarged opening above the sink, or French doors onto the garden. For a bathroom, it may be a fan outlet or a window resized for privacy. Markham's examples do not name vents, so ask heritage staff whether a new outlet on a visible wall needs a permit. Sequence matters most: the City will not accept the building permit application until the heritage permit is issued, so the heritage file opens first.

Houses from Markham's 1970s and 1980s subdivisions, and the 2000s ones

The 2021 census counted 110,865 occupied homes in Markham. Of those, 17,710 were built between 1961 and 1980 and 20,570 in the 1980s, so, with the 2,835 built earlier, more than a third of the city is now over 35 years old. Another 29,555 went up between 2001 and 2010, and 22,930 since then. Single-detached houses make up 62,270 of the total.

In a house from the 1970s or 1980s, opening the bathroom floor or a kitchen wall is the moment to look at what may never have been replaced: drain lines under the tub, shut-off valves, the bathroom fan's duct, and whether the electrical panel has room for an induction range or new kitchen circuits. The comparison of gas and induction cooktops covers the electrical side. In a house from the 2000s, the original ensuite is now 16 to 25 years old, and the ensuite bathroom renovation guide covers layout and fixture choices.

A basement bathroom can qualify for Markham's plumbing protection rebate

Markham's Private Plumbing Protection Rebate Program pays toward devices that keep sewage and stormwater out of a basement, which is worth planning into a new basement bathroom. The program has been extended: the building permit must be obtained by April 30, 2027, and rebate applications are due by July 31, 2027. The property must be in a known flood-prone area, or the owner must show that flood risk exists, and downspouts must be disconnected from the City's sewers.

  • The City's technical review comes first, including a CCTV inspection of the lateral by a licensed plumber.
  • The building permit is applied for after that approval, with both review forms uploaded.
  • The rebate application, with invoices, follows the passed inspection. Work done without pre-approval does not qualify.
Maximum rebates under Markham's Private Plumbing Protection Rebate Program
Device or workMaximum rebate
Indoor backwater valve on a sanitary or storm lateral$1,750
Outdoor backwater valve$2,000
Weeping tile disconnected and redirected to the storm lateral by gravity$3,000
Weeping tile disconnected with a sump pump installed$5,000
Storm or sanitary lateral relined or repaired$2,500 each

Lake Ontario water, delivered by York Region

York Region's 2025 report places Markham among the three southern cities supplied entirely with Lake Ontario water, which the City of Toronto and Peel Region treat before York takes it over. York's second-quarter 2026 average for Markham was 126 mg/L, or 7.36 grains per gallon, which York classifies as hard (its hard range runs from 121 to 180 mg/L). Hardness is not a health issue by York's account; what it costs you is scale on aerators, kettles and shower glass. In a kitchen, that argues for a faucet with an aerator that unscrews for cleaning, and in a bathroom for finishes that hide spotting. If you plan a softener, decide before the walls close.

Questions

Does a minor heritage permit in Unionville or Markham Village cost anything?

No. Markham charges no fee for minor heritage permit applications. Major heritage permits and demolition applications carry fees under the City's Heritage Permit Fee By-law 2023-21.

Can I claim Markham's backwater valve rebate after the bathroom is finished?

Not for new work. Installations need the City's technical review approval, a building permit and a passed inspection before the rebate is paid. The only retroactive window covered work completed between May 1, 2017 and May 1, 2018.

Can I add a kitchen to my Markham basement for a secondary suite?

Markham treats a secondary suite as a self-contained second unit inside a house. It needs a housing permit and a fire registration, so the suite kitchen is designed and permitted together with the rest of the basement.

Is swapping a toilet or vanity where the old one stood permit-free in Markham?

Markham's guide does not list like-for-like replacements, so call the Building Counter before work starts. Moving or adding a fixture is plumbing work that needs a plumbing permit, or the housing permit if other construction is involved.

Sources and further reading

  1. City of Markham: Guide to building permits
  2. City of Markham: Heritage Permit (HE)
  3. City of Markham: Basement flooding and sewer back-up prevention
  4. York Region: Drinking water quality and monitoring
  5. Statistics Canada: Census Profile, 2021, Markham

Checked November 22, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.