Renovations

Guides

Crowds and Canadian flags on Main Street in downtown Newmarket

Newmarket renovations

Kitchen and bathroom renovations in Newmarket

In Newmarket, the Town's Building Division issues renovation permits through its online Development Portal: plumbing alterations, adding or removing walls and finishing a basement all need one, while new floor and ceiling finishes and painting do not. York Region supplies the town with well water blended with Lake Ontario water, averaging 141 mg/L of hardness in mid-2026, a level York classes as hard. About half of Newmarket's homes were built between 1971 and 2000, and the Lower Main Street South heritage district adds its own rules for doors, windows and vents.

By the Purple Kitchen & Bath team · Updated · 5 min read · Photo: iStock

About half of Newmarket's homes were built between 1971 and 2000

Statistics Canada's 2021 Census counted roughly 30,300 occupied homes in Newmarket, and close to 15,840 of them were built from 1971 to 2000, with the 1980s the busiest decade. Only about one home in ten predates 1961, and about 60% are single-detached houses.

That age profile shapes the job more than any style trend. A house finished in 1988 is now close to 40 years old, so even if its kitchen and bathrooms were refreshed once, the parts behind the finishes (shut-off valves, the shower valve inside the wall, drain lines, the fan duct) may be as old as the house. Plan for them while the walls are open.

Newmarket homes by period of construction, 2021 Census (counts rounded by Statistics Canada)
BuiltHomesShareAge in 2026
1960 or earlier3,15010%66 years or more
1961 to 19702,0807%56 to 65 years
1971 to 19803,89013%46 to 55 years
1981 to 19905,51018%36 to 45 years
1991 to 20006,44021%26 to 35 years
2001 to 20105,58518%16 to 25 years
2011 to 20213,65012%5 to 15 years

Which Newmarket kitchen and bathroom jobs need a Town building permit?

The Town's list of projects that need a building permit includes three that cover most kitchen and bathroom plans: mechanical alterations, which the Town spells out as HVAC and plumbing; adding or removing walls; and finishing a basement. Its list of work that typically needs no permit includes floor and ceiling finishes and painting and decorating. Replacing cabinets or a vanity in the same spot appears on neither list, and for anything not listed the Town asks you to email building.permits@newmarket.ca before you start.

How common kitchen and bathroom plans line up with the Town of Newmarket's permit list
Your planWhere it falls
New floor tile, ceiling finish and paint onlyTypically no permit
Sink moved to an island, or a toilet or shower relocatedPermit: mechanical alterations (HVAC/plumbing)
Wall between kitchen and dining room removedPermit: walls added or removed
Bathroom built into an unfinished basementPermit: finishing a basement
Larger window over the sink or a new patio doorPermit: new or enlarged windows and doors
New circuits for appliances or lightingElectrical Safety Authority, not the Town

Applying through the Development Portal and booking inspections

Applications go in through the Development Portal as unlocked black-and-white PDFs, dated in the title block. Once everything is complete, the Town needs approximately 10 to 15 working days to issue the permit or send a deficiency letter. After issue, keep the reviewed plans on site and email inspections@newmarket.ca two days before each mandatory inspection. If a fixture is moving, the guide to plumbing upgrades during a bathroom renovation explains what usually gets replaced along the way, and the basement bathroom renovation guide covers layout and drainage.

Newmarket's tap water: groundwater blended with Lake Ontario supply

York Region lists Newmarket among the communities supplied with Lake Ontario water and groundwater blended together. In York's second-quarter 2026 averages, Newmarket measured 141 mg/L of hardness as calcium carbonate, inside the 121 to 180 mg/L band York calls hard, or about 8.2 grains per gallon using York's conversion factor. Iron averaged 0.103 mg/L and sodium 23.0 mg/L. York notes that hard water makes lathering difficult and forms scale in pipes and appliances, and that many people install softeners.

  • If a softener is part of the plan, keep one cold line unsoftened for the kitchen tap or a filter faucet. York suggests a separate unsoftened supply for cooking and drinking, because softeners trade calcium and magnesium for sodium or potassium.
  • Choose shower glass with as few tracks, rails and clips as the design allows, since scale builds wherever water sits; see keeping a glass shower clean.
  • York's treatment keeps iron in solution so it does not mark fixtures, but heat undoes it, so iron can settle in a hot water tank; flushing the tank regularly keeps it down.

Lower Main Street South: a heritage permit alongside the building permit

Newmarket protects 72 properties as the Lower Main Street South Heritage Conservation District under Part V of the Ontario Heritage Act, and 93 properties are designated individually under Part IV. The district plan describes mostly two-storey brick buildings set right at the sidewalk, dating from before the mid-nineteenth century to the mid-twentieth.

Nothing on the plan's heritage permit list is interior work, so the kitchen or bathroom itself is not what draws review. What does: altering doors, windows or their surrounds, cutting new openings in a wall, and changing rooftop equipment. Mechanical or electrical equipment installed away from public view is exempt, so a range hood or bath fan that vents to the rear or behind a parapet is the simpler route; the range hood venting guide covers duct runs. The plan sets no fee for a heritage permit, and Town staff identify any other consents the work needs and aim to coordinate the reviews. Start with the Cultural Heritage Planner at heritageplanning@newmarket.ca.

How Purple Kitchen & Bath plans a Newmarket kitchen or bathroom

Purple Kitchen & Bath, the kitchen and bathroom team of Purple Properties, has renovated GTA homes since 1996 and works across York Region from its office at 420 Main St E, Unit 537, Milton. The first meeting, with founder Rowan Henry and the designers, is complimentary; the layout, your selections and any Newmarket permit or heritage approval are then planned before demolition, and the estimate is personalized to your house. Expect most GTA projects to run 6 to 16+ weeks, set by scope, complexity and any change orders. A walkthrough of the finished room starts the one-year workmanship warranty.

Questions

Does replacing a vanity or kitchen cabinets in Newmarket need a permit?

Swapping cabinets or a vanity in the same spot is on neither the Town's permit list nor its exempt list. Once a sink, toilet or shower moves, it is a plumbing alteration, which needs a permit. If unsure, email building.permits@newmarket.ca with a short description.

How long does the Town of Newmarket take to review a renovation permit?

About 10 to 15 working days once the application, fees and documents are complete. The Town then issues the permit or sends a deficiency letter; it does not predict timing beyond that first review, so incomplete drawings cost the most time.

Is there a fee for a heritage permit on Lower Main Street South?

The district plan sets no fee for a heritage permit. Interior kitchens and bathrooms are not on its review list, but new or altered windows, doors and rooftop equipment are, so check vent and window changes with the Cultural Heritage Planner first.

Is a water softener worth installing during a Newmarket renovation?

It is a personal choice. York measured Newmarket's water at 141 mg/L in 2026, a level it classes as hard. If you soften, a renovation is the easiest time to add the softener loop and a separate unsoftened line for drinking water.

Sources and further reading

  1. Town of Newmarket: Building and Renovating
  2. York Region: Drinking water quality and monitoring
  3. Town of Newmarket: Heritage Conservation Planning
  4. Town of Newmarket: Lower Main Street South Heritage Conservation District Plan
  5. Statistics Canada: Dwelling condition by tenure, period of construction (Table 98-10-0233-01), 2021 Census

Checked November 22, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.